Bridge/gantry Crane SOP
Acronyms
LOTO - Lockout/Tagout.
PPE - Personal Protective Equipment.
SOP - Safe Operating Procedure.
FSWRS - Flexible steel wire rope slings.
WLL - Workload Limit.
T - Ton.
模板文件为英文。
SOP · SOP-60048

The Bridge - Gantry Crane Safe Operating Procedure (SOP) outlines the steps and precautions for operating a bridge or gantry crane safely, protecting both workers and equipment.
It covers the hazards (moving and falling objects, manual handling, poor housekeeping and falls), the PPE to wear, the pre-operational inspection, operator training, maintenance under lockout/tagout, planning the lift, and a step-by-step operation from controls checks and doing the lift to shutdown.
A hazard checklist for powered non-mobile plant, with Y, N and NA for each item, helps confirm every safety measure is in place before work starts.
Bridge/gantry Crane SOP
LOTO - Lockout/Tagout.
PPE - Personal Protective Equipment.
SOP - Safe Operating Procedure.
FSWRS - Flexible steel wire rope slings.
WLL - Workload Limit.
T - Ton.
在浏览器中的样子
免费注册,然后选择获取方式。你的公司信息会自动填好。
$89.95 一次付清,永久归你。免费套餐也能用。
注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。
另附术语定义
暂无评价。




模板如何使用
每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。
在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。
你的信息和标志都会带过去。这个模板打开时已经填好。
付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。