抢先体验优惠:抢先体验: 30% 折扣,只要保持订阅就一直有效.

领取优惠

模板文件为英文。

Excavation Management Plan

管理计划 · PLAN-20304

Excavation Management Plan模板预览
  • 1 个工作步骤
  • 已售出 185 次
  • 版本 3
  • Civil Works
  • 任何手机都能看

This Excavation Management Plan provides guidance on managing health and safety risks associated with excavation work. It applies to all types of excavation work, including bulk excavations over 1.5m deep, trenches, shafts, and tunnels.

Designed to help organisations eliminate or reduce risks and minimise injuries to workers, contractors, and visitors, this plan supports safe and compliant excavation practices.

It covers definitions, review procedure, the excavation policy with responsibilities and procedure, safe work method statements with a risk assessment form and SWMS template, a trench collapse emergency response plan, and an excavation safety inspection checklist.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

Excavation Management Plan 预览

Excavation Management Plan

管理计划Version 3

Introduction

Excavation work means work involving the removal of soil, rock or other materials from a site to form an open face, hole or cavity using tools, machinery or explosives.

Definitions

High-Risk Construction Work: Construction work considered to be high risk for the purposes of the OHS Regulations. It is construction work for which a Safe Work Method Statement (SWMS) is required.

Barrier: A physical structure, which blocks or impedes something.

Barricade: Any object or structure that creates a barrier obstacle to control, block passage or force the flow of traffic in the desired direction.

Backfill: Material used for refilling excavations.

Battering: means to form the face or side or wall of an excavation to an angle, usually less than the natural angle of repose, to prevent earth slippage.

Bench: A horizontal step cut into the face or side or wall of an excavation to provide horizontal bearing and sliding resistance.

Benching: The horizontal stepping of the face, side, or wall of an excavation.

Face: An exposed sloping or vertical surface resulting from the excavation of material.

还有一个工作步骤:Emergency response

  1. Review procedure
  2. Document control
  3. References and applicable documents
  4. Excavation policy
  5. Responsibilities
  6. 另外还有 2 个

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个模板

免费注册,然后选择获取方式。你的公司信息会自动填好。

  • 付费套餐包含

    使用套餐中的模板额度。这一份需要 1 个额度。

    比较套餐和价格
  • 单独购买

    $89.95 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

涵盖内容

1 个工作步骤

  1. Emergency responseCall emergency services, follow site emergency procedures, make the area safe, apply first aid and report the incident.

涵盖的危险

引用的法规和标准

每份 SWMS 都附有我们的法规和实施规程参考清单。

评价

暂无评价。

查看全部

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。