抢先体验优惠:抢先体验: 30% 折扣,只要保持订阅就一直有效.

领取优惠

Electricity班前安全会讲稿

本页面目前仅提供英文版。

在开工前会或班前安全会上读出来,一起讨论这些问题,并让每个人签到。内容来自我们的electricity页面,以及涵盖这项危险的 450 个 SafetyDocs 模板。

工地
日期
主讲人

它是什么

Contact with live electrical installations, leads, tools or services, causing electric shock, electrocution, burns or fire.

要检查的控制措施,最有效的排在前面

  1. De-energise, isolate, lock out and test circuits as dead before work, and only let licensed electricians do electrical work.
  2. Locate underground services through Before You Dig Australia, and confirm their position before digging or drilling.
  3. Protect portable tools and leads with residual current devices, and keep leads off the ground and away from water.
  4. Inspect, test and tag portable electrical equipment at the intervals required for the work environment.
  5. Withdraw damaged leads, plugs and tools from use immediately, and tag them out of service.
  6. Where live work is permitted under WHS laws, use rated insulated tools, arc-rated clothing and a safety observer.

在工作中哪些环节会遇到

SafetyDocs 模板中涉及electricity的工作步骤:

给工人的问题

  1. 今天这项工作中,哪里可能会遇到electricity?
  2. 今天的工作中有没有以下内容:Emergency response if co-worker suffers electric shock?
  3. 最有效的控制措施是:“De-energise, isolate, lock out and test circuits as dead before work, and only let licensed electricians do electrical work”。我们这里能做到吗?如果不能,为什么?
  4. 这个工地上有哪些针对electricity的控制措施缺失或不起作用?
  5. 你会在什么情况下因为electricity停工?你会告诉谁?
  6. 在这项工作中,我们怎么报告危险、险情或事故?

签到记录

所有参会人员在下方签字。请和你的班前安全会记录一起保存。

姓名公司签名

这是班前安全会的参考起点,不是 SWMS,也不是风险评估。请补充你的工地和工人的具体情况。