Plumbing Electrical Safety

SWMS · SWMS-10646

Plumbing Electrical Safety SWMS模板预览
  • 14 个工作步骤
  • 已售出 74 次
  • 版本 2
  • Plumbing
  • 任何手机都能看

This SWMS outlines the general electrical hazards of plumbing work, including overhead and underground electrical service hazards and electrical supply faults.

It covers disconnecting hot water services, cutting or disconnecting a metallic water pipe, changing water meters and disconnecting the main earth wire from a water pipe. The work is set out in 14 job steps, from training and arrival on site to commissioning and emergency response.

It suits plumbing professionals, electrical contractors and construction workers doing plumbing work where electrical hazards are present.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

Plumbing Electrical Safety SWMS 预览

Plumbing Electrical Safety

SWMSVersion 2
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site Management Plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous Lineschemical, fuel or refrigerant lines
  • Energised Electricalenergised electrical installations or services
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection
  • High Visibility
  • Head Protection
  • Face Protection
  • Breathing Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Provide training on electrical hazards associated with plumbing work

    • Hazard

      Electric Shock

      Before controls4 Acute
      Controls
      • Training and information provided to workers on electrical hazards:

        • Workers have a basic understanding of electrical pathways and how water pipes can become ‘live’ in the case of electrical faults

        • Identification of overhead, underground and in-situ electrical hazards

        • Training in controls to manage electrical risk

        • Checking controls are working and using them

        • When and how to use any protective equipment provided and what to do if something goes wrong (emergency response to electric shock).

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 13 个工作步骤,从“Provide training on the health effects associated with RCS”到“Emergency response if co-worker suffers electric shock”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个模板

免费注册,然后选择获取方式。你的公司信息会自动填好。

  • 付费套餐包含

    使用套餐中的模板额度。这一份需要 1 个额度。

    比较套餐和价格
  • 单独购买

    $89.95 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

涵盖内容

14 个工作步骤

  1. Provide training on electrical hazards associated with plumbing workTrain workers on electrical hazards in plumbing work
  2. Provide training on the health effects associated with RCSTrain workers on the health effects of silica dust
  3. Arrival on-site & assess onsite conditionsAssess the site conditions on arrival
  4. Check weather conditions & prepareCheck the weather and prepare for extreme conditions
  5. Work area set-upSet up the work area and establish exclusion zones
  6. Overhead electrical hazardsKeep clear of overhead power lines
  7. Excavation workIdentify and avoid underground services when excavating
  8. Working with power toolsUse power tools safely to prevent electrocution and injury
  9. Cut or disconnect a metallic water pipe.Test for voltage and bridge metallic water pipes before cutting
  10. Welding, solderingPrevent fire and burns during welding and soldering
  11. Fitting appliances & fixturesFit appliances and fixtures safely around electricity
  12. Commission systemPressure test and commission the system
  13. On completionLeave the work area safe and secure
  14. Emergency response if co-worker suffers electric shockRespond to a co-worker who suffers an electric shock

涵盖的危险

评价

暂无评价。

查看全部

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。