抢先体验优惠:抢先体验: 30% 折扣,只要保持订阅就一直有效.

领取优惠

Engulfment

Being buried or drowned by free-flowing solids or liquids, such as grain, sand, soil, sludge or water, in a confined space, tank or excavation.

本页面目前仅提供英文版。

engulfment免费班前安全会讲稿

又称:Engulfed, Engulfment by free-flowing material

如何控制engulfment

  1. Avoid entering silos, bins, tanks or hoppers; clear blockages from outside using poles, air lances or vibrators.
  2. Isolate and lock out conveyors, augers and inlets so no material can flow in or be drawn out during entry.
  3. Shore, bench or batter excavation walls, and keep spoil and plant back from the edge to prevent collapse.
  4. Never walk on bridged or crusted material, and do not work below material hung up on walls.
  5. Use a harness and lifeline attached to a fixed anchor, with a standby person and tested rescue equipment.

常用的控制措施,最有效的排在前面。你的 SWMS 要针对你自己的工作和工地确定控制措施。

涵盖Engulfment的模板

查看全部 84 份模板

按工种浏览 SWMS

常同时出现的危险

这些模板引用的法规