它是什么

Too few workers, or a crew without the roles the task needs, such as doggers, safety observers or a crane coordinator, so hazards go unwatched.

要检查的控制措施,最有效的排在前面

  1. Assess the size and complexity of the work before setting the crew, and plan the roles each task needs.
  2. Confirm each role is filled by a worker who holds the licence or competency it requires, such as a dogging or crane licence.
  3. Appoint a safety observer when plant may come near the exclusion zone of overhead power lines.
  4. Appoint a crane coordinator when more than one crane works in the same area.
  5. Review the crew when the scope, site conditions or schedule change, and stop work until any gaps are filled.
  6. Brief the whole crew on who is responsible for what before work starts.

给工人的问题

  1. 今天这项工作中,哪里可能会遇到inadequate crew?
  2. 最有效的控制措施是:“Assess the size and complexity of the work before setting the crew, and plan the roles each task needs”。我们这里能做到吗?如果不能,为什么?
  3. 这个工地上有哪些针对inadequate crew的控制措施缺失或不起作用?
  4. 你会在什么情况下因为inadequate crew停工?你会告诉谁?
  5. 在这项工作中,我们怎么报告危险、险情或事故?

签到记录

所有参会人员在下方签字。请和你的班前安全会记录一起保存。

姓名公司签名

这是班前安全会的参考起点,不是 SWMS,也不是风险评估。请补充你的工地和工人的具体情况。