抢先体验优惠:抢先体验: 30% 折扣,只要保持订阅就一直有效.

领取优惠

Inadequate crew

Too few workers, or a crew without the roles the task needs, such as doggers, safety observers or a crane coordinator, so hazards go unwatched.

本页面目前仅提供英文版。

inadequate crew免费班前安全会讲稿

又称:Inadequate team, Insufficient crew, Understaffing, Inadequate staffing

如何控制inadequate crew

  1. Assess the size and complexity of the work before setting the crew, and plan the roles each task needs.
  2. Confirm each role is filled by a worker who holds the licence or competency it requires, such as a dogging or crane licence.
  3. Appoint a safety observer when plant may come near the exclusion zone of overhead power lines.
  4. Appoint a crane coordinator when more than one crane works in the same area.
  5. Review the crew when the scope, site conditions or schedule change, and stop work until any gaps are filled.
  6. Brief the whole crew on who is responsible for what before work starts.

常用的控制措施,最有效的排在前面。你的 SWMS 要针对你自己的工作和工地确定控制措施。

涵盖Inadequate crew的模板

超值套装 · 7 个模板

Crane Hire

超值套装 · PACK-50521

7 份,只需 6 的价钱

+3

查看全部 34 份模板

按工种浏览 SWMS

常同时出现的危险

这些模板引用的法规