Crane Lift Plan
Site Details
- Job #
- —
- Project Name
- [Job name]
- Site Location
- [Site address]
- Lift Location (on-site)
- —
- Subcontractor name
- —
- Subcontractor Ph
- —
- Crane Company
- —
- Crane Company Ph
- —
模板文件为英文。
超值套装 · PACK-50522

A set of eight SWMS, two SOPs, four plans and 24 forms for crane hire businesses and crane operators.
The SWMS cover mobile cranes, tower cranes, mini cranes, self-erecting cranes, truck-mounted cranes and dogging. The SOPs include Lock Out Tag Out - LOTO and Manual Handling. It also includes 28 plans and forms, such as Crane Lift Plan, Emergency Response Plan-Plant and Plant Safety Management Plan.
Each document is the same one sold on its own, so you get every update to it. Together they cost 22 template credits instead of 38.
Crane Lift Plan
在浏览器中的样子
免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。
$1,978.90 $3,418.10 一次付清,永久归你。免费套餐也能用。
注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。
A Crane Lift Plan for planning each crane lift: critical lift criteria, crane, load and rigging details, safety requirements and a lift layout diagram.
也可单独购买Workbox SWMS: 13 job steps for working at height in a workbox (man basket), from the rescue plan and trial lift to emergency response.
也可单独购买A Job Safety & Environmental Analysis (JSEA) form to complete before work starts on a new site or on arrival at the site each day.
也可单独购买An emergency response plan for plant and machinery: emergency contacts, call procedure, crushing, cutting and entanglement responses, first aid and registers.
也可单独购买A register to record each Safe Work Method Statement by title, document number, issue and review dates, with management sign-off.
也可单独购买Record a corrective or preventative action: the issue and its seriousness, the evaluation, the action, who is responsible and the manager's sign-off.
也可单独购买A plan for managing plant and equipment safety, from purchase and hire to maintenance, lock out tag out, machine guarding and disposal.
也可单独购买An incident and near miss report form: reporter details, incident type and severity, witnesses, causes and the follow-up actions.
也可单独购买Log the maintenance of an item of plant: its make, model, serial number and location, then each maintenance date, the findings, work done, next due date and sign-off.
也可单独购买Record the maintenance requirements and history of all plant and equipment, and whether each item needs a licence to operate or registration with the regulator.
也可单独购买Record the hazards and controls for every task that involves plant and equipment used by the company.
也可单独购买Identify the hazards of an item of plant, score the risk with a risk matrix, and tick the control measures in place, with reviews and approval.
也可单独购买Lock out tag out (LOTO) procedure: isolate every energy source before maintenance, restore equipment to service, and assess the risks of the work.
也可单独购买A purchasing record and OHS checklist to help manage the risks of new equipment, chemicals and other items before they are introduced.
也可单独购买A Yes/No/N/A prestart checklist for plant and equipment: inspection, electrical, guarding, training, safety equipment and emergency checks.
也可单独购买A form to record a management review meeting: attendance, discussion, previous action items and new actions.
也可单独购买A commissioning checklist for newly installed plant: 15 Yes, No or N/A inspection questions, notes and actions, and a technician or engineer sign-off.
也可单独购买A permit for the safe isolation of plant and equipment during maintenance, cleaning or repairs, with sign-offs and priority release.
也可单独购买A checklist for the purchase, hire, lease or donation of plant: consultation, supplier, safety, PPE, training, maintenance and cost.
也可单独购买A pre-start checklist for mobile plant: Yes, No or N/A checks on tyres, lights, fluids, cabin and safety devices, with comments for each section.
也可单独购买Register to keep track of the SOPs in your workplace, with the task, issue and review dates, version and responsible person.
也可单独购买A worker consultation record: purpose, participants, key points, feedback and concerns, agreed actions and signatures.
也可单独购买A Standard/Safe Operating Procedure (SOP) template for writing step-by-step procedures specific to your business tasks.
也可单独购买A machine guarding inspection checklist covering guard installation, condition and functioning, signage and controls, and administrative controls.
也可单独购买A record of one worker's training in one course: who approved it, start and completion dates, description, expected outcomes and training type.
也可单独购买An Internal Audit Plan to set the audit's subject, scope, objectives, team and criteria, so audits are conducted efficiently and effectively.
也可单独购买SWMS Template: ready to fill in, with your business's details on every copy. Part of the Health and Safety Manual.
也可单独购买Helps auditors give management clear, objective and impartial information about what is going well and what needs to be improved.
也可单独购买Assess the physical hazards of machinery and machine guarding, rate the risk with a risk matrix, and record the controls and who is responsible.
也可单独购买A register of the training and competencies each worker has completed, their licences and expiry dates, and whether they have been correctly inducted.
也可单独购买SWMS for tower crane work: planning, work area set-up, climbing the tower, pre-start checks, crane operation, re-fuelling and emergency response.
也可单独购买A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.
也可单独购买SWMS for lock out tag out of plant and equipment: isolation procedures, permits, locks and tags, electrical isolation and returning plant to service.
也可单独购买Mini Crane SWMS: 16 job steps from planning and set-up to crane placement near power lines, load equipment, lifting, maintenance and emergencies.
也可单独购买Mobile Crane SWMS: 16 job steps covering power lines, set-up, load equipment checks, lifting, maintenance, refuelling and emergencies.
也可单独购买Crane Self-Erecting SWMS: 19 job steps from lift planning and erecting the crane to workboxes, re-fuelling and emergency response.
也可单独购买SWMS for truck-mounted cranes such as Hiabs: 16 job steps from training and road operation to pre-lift checks, loading and unloading, and emergency response.
也可单独购买Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.
也可单独购买每份 SWMS 都附有我们的法规和实施规程参考清单。
暂无评价。
模板如何使用
每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。
在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。
你的信息和标志都会带过去。这个模板打开时已经填好。
付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。