Crane Hire

超值套装 · PACK-50521

Crane Hire 超值套装模板预览
  • 7 个模板
  • 7 份,只需 6 的价钱
  • 全部放入一个模板库文件夹

Seven SWMS for crane hire businesses and crane operators: mobile cranes, tower cranes, mini cranes, self-erecting cranes, truck-mounted cranes and dogging.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost six template credits instead of seven.

Tower Crane SWMS 预览

Tower Crane

SWMSVersion 7
Company doing the work
[Company]
Business contact
—
Phone #
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile Plant
  • Gas Mains
  • Hazardous Lines
  • Energised Electrical
  • Falls
  • Hazardous Atmosphere

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Contact with overhead electric lines

      Before controls4 Acute
      Controls
      • Liaise with electrical entities where necessary regarding the supply of electricity and control measures for working around existing power supply (e.g. de-energising powerlines) including loading bays and site access.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Inadequate crane team

      Before controls3 High
      Controls
      • Assess the size and complexity of the work to be undertaken

      • Determine the crane crew required for the task. Consider:

        • Number of operators and doggers required

        • Number of riggers required for the activities

        • Whether a trained safety observer is required for maintaining electrical exclusion zones

        • Whether a crane coordinator should be appointed.

      After controls2 Moderate
      Responsible
    • Hazard

      Lack of training resulting in injuries & fatalities

      Before controls4 Acute
      Controls
      • All operators have the appropriate licences for Crane Operation, Rigging or Dogging as appropriate

        • E.g. Crane – Tower cranes (CT)

        • E.g. Dogman – Dogging

        • E.g. Rigger – Basic rigging - Intermediate rigging - Advanced rigging

      • Trained and competent to operate the type of crane and attachments they are using

      • Refresher training is undertaken on an ongoing basis.

      After controls2 Moderate
      Responsible

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 12 个工作步骤,从“Arrival on-site & assess onsite conditions”到“Emergency response”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个超值套装

免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。

  • 付费套餐包含

    使用套餐中的模板额度。本套装只需 6 个额度,而不是 7 个。

    比较套餐和价格
  • 单独购买

    $539.70 $629.65 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

包含内容

  1. Tower Crane

    SWMS · 13 个工作步骤

    SWMS for tower crane work: planning, work area set-up, climbing the tower, pre-start checks, crane operation, re-fuelling and emergency response.

    也可单独购买
  2. Dogman

    SWMS · 12 个工作步骤

    A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.

    也可单独购买
  3. Lock Out Tag Out (LOTO)

    SWMS · 12 个工作步骤

    SWMS for lock out tag out of plant and equipment: isolation procedures, permits, locks and tags, electrical isolation and returning plant to service.

    也可单独购买
  4. Mini Crane

    SWMS · 16 个工作步骤

    Mini Crane SWMS: 16 job steps from planning and set-up to crane placement near power lines, load equipment, lifting, maintenance and emergencies.

    也可单独购买
  5. Mobile Crane

    SWMS · 16 个工作步骤

    Mobile Crane SWMS: 16 job steps covering power lines, set-up, load equipment checks, lifting, maintenance, refuelling and emergencies.

    也可单独购买
  6. Crane Self-Erecting

    SWMS · 19 个工作步骤

    Crane Self-Erecting SWMS: 19 job steps from lift planning and erecting the crane to workboxes, re-fuelling and emergency response.

    也可单独购买
  7. Crane Truck Mounted

    SWMS · 16 个工作步骤

    SWMS for truck-mounted cranes such as Hiabs: 16 job steps from training and road operation to pre-lift checks, loading and unloading, and emergency response.

    也可单独购买

涵盖内容

涵盖的危险

引用的法规和标准

每份 SWMS 都附有我们的法规和实施规程参考清单。

你能省多少

模板工作步骤单独购买
Tower Crane13$89.95 · 1 个额度
Dogman12$89.95 · 1 个额度
Lock Out Tag Out (LOTO)12$89.95 · 1 个额度
Mini Crane16$89.95 · 1 个额度
Mobile Crane16$89.95 · 1 个额度
Crane Self-Erecting19$89.95 · 1 个额度
Crane Truck Mounted16$89.95 · 1 个额度
逐个购买$629.65 · 7 个额度
在本套装中$539.70 · 6 个额度 节省 $89.95

评价

暂无评价。

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。