Driver Posture & Responsibilities
Acronyms
PPE - Personal Protective Equipment
SOP - Safe Operating Procedure
模板文件为英文。
超值套装 · PACK-50333

A set of 32 SWMS and 14 SOPs for civil contractors building water and sewerage systems.
The SWMS cover trench excavation, pipeline disinfecting, borehole drilling, drainage, soil testing and culvert and tank installation. The SOPs include Grader, Front-end Loader and Plant Attachment Maintenance.
Each document is the same one sold on its own, so you get every update to it. Together they cost 31 template credits instead of 46.
Driver Posture & Responsibilities
PPE - Personal Protective Equipment
SOP - Safe Operating Procedure
在浏览器中的样子
免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。
$2,788.45 $4,137.70 一次付清,永久归你。免费套餐也能用。
注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。
Safe operating procedure for driver posture and responsibilities: hazards, ergonomics, fuelling, accident procedure and a vehicle pre-operational checklist.
也可单独购买Soil Testing SWMS: 11 job steps from remote travel and set-up to soil testing, mobile plant, completion and emergency response.
也可单独购买SWMS for disinfecting pipelines that carry potable water: chlorine handling, water testing, injecting the mains, refuelling, environment and emergencies.
也可单独购买Vehicle Mounted Borehole Drilling SWMS: 14 job steps covering travel, work area set-up, drilling, maintenance, fuelling and emergencies.
也可单独购买SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.
也可单独购买Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.
也可单独购买SWMS for spotters and safety observers: traffic and mobile plant, work near overhead and underground assets, scaffolding and EWPs, roll-over and first aid.
也可单独购买SWMS for bulk excavation work: planning, plant operation, shoring, water-charged ground, silica dust, re-fuelling, environmental controls and emergencies.
也可单独购买Trench Excavation SWMS: 15 job steps covering excavating and working in trenches over 1.5 m deep, from planning to emergency response.
也可单独购买Safe operating procedure for a grader: hazards, PPE, training, maintenance, step-by-step operation and a hazard checklist.
也可单独购买Plumbing drainage SWMS for installing pipes, stormwater tanks and polyethylene pipe welding, and for sewage and stormwater drainage on civil works.
也可单独购买Mobile Crane SWMS: 16 job steps covering power lines, set-up, load equipment checks, lifting, maintenance, refuelling and emergencies.
也可单独购买Safe operating procedure for a front-end loader: hazards, precautions, operation, maintenance and a hazard checklist for powered mobile machinery.
也可单独购买Traffic corridor SWMS: 8 job steps covering the traffic management plan, safe work zone set-up, traffic controllers, pedestrians and zone takeouts.
也可单独购买Safe operating procedure for plant attachment maintenance: hazards, PPE, training, isolation under LOTO, and cleaning, welding and hydraulics safety.
也可单独购买Hazards and controls for operating a tip truck and dog trailer, including side tippers, from coupling trailers to tipping, refuelling and emergency response.
也可单独购买Culvert-Tank Installation SWMS: 12 job steps for installing culverts, tanks and similar structures, from planning to emergency response.
也可单独购买Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.
也可单独购买A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.
也可单独购买Lasers SWMS: 9 job steps covering Class 1, 2 and 3R construction lasers, beam set-up, eye injury, mobile plant, roadside work and emergencies.
也可单独购买SWMS for installing sediment and safety fencing: machine set-up, wire straining, nail and staple guns, refuelling and emergency response.
也可单独购买A SWMS for guided boring and pipe jacking works: the hazards and controls for excavating launch and retrieval pits, hoisting and running the machine.
也可单独购买Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.
也可单独购买A safe operating procedure for backhoe loaders: hazards, PPE, clearances, operation steps, maintenance and a hazard checklist.
也可单独购买SWMS for general construction work at night: planning, work area set-up, night works and emergency response, with lighting, plant and fatigue controls.
也可单独购买Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.
也可单独购买Overhead Electric Lines SWMS: 6 job steps covering exclusion zones, spotters, mobile plant near powerlines and emergency response.
也可单独购买Safe operating procedure for an asphalt patcher: hazards, PPE, training, maintenance, step-by-step operation and a hazard checklist.
也可单独购买Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.
也可单独购买Safe operating procedure to prevent falls from heavy vehicles: worker training, maintenance, cab access, trailers and a training register.
也可单独购买Nuclear Densometer SWMS: 12 job steps covering storage, transport, radiation exposure, mobile plant, trenches and emergencies.
也可单独购买Safe operating procedure for outdoor work: hazards, PPE, hot and cold conditions, poisonous plants, animals, first aid and a training register.
也可单独购买A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.
也可单独购买Safe operating procedure for a skid steer: hazards, PPE, precautions, step-by-step operation, fuelling, maintenance and a hazard checklist.
也可单独购买Electric fusion poly pipe butt welding SWMS: 11 job steps covering mobile plant, hazardous atmospheres, hot plate and facer use, and emergencies.
也可单独购买Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.
也可单独购买Safe operating procedure for an excavator: hazards, PPE, licensing, clearances, maintenance, step-by-step operation and a hazard checklist.
也可单独购买SWMS for horizontal directional boring: locating underground services, drilling, service strikes, rig maintenance, refuelling and emergencies.
也可单独购买SWMS for excavating near underground services and assets: site planning, survey, work area set-up, contact with utilities and emergency response.
也可单独购买Safe operating procedure for a roller: hazards, PPE, precautions, transporting, maintenance, step-by-step operation and a hazard checklist.
也可单独购买Plumbing SWMS for installing water meters: 16 job steps from site assessment and electrical hazards to excavation, confined space and emergency response.
也可单独购买Geofabric Installation SWMS: 17 job steps covering delivery, crane placement, rolling out, seaming and securing geomembrane on dams and landfills.
也可单独购买Light Vehicle on Construction SWMS: 16 job steps covering travel, loading, fuelling, breakdowns, accidents, mobile plant and emergencies.
也可单独购买SWMS for soil compactor work: weather, site set-up, overhead lines, slopes, silica dust, refuelling, ground workers and emergency response.
也可单独购买Site Establishment SWMS: 11 job steps from planning and traffic management to tools, site set-up, working at height and emergency response.
也可单独购买SWMS for operating a remote control trench roller: transport, set-up, trench work, mobile plant, hydraulics, environment and emergencies.
也可单独购买每份 SWMS 都附有我们的法规和实施规程参考清单。
暂无评价。
模板如何使用
每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。
在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。
你的信息和标志都会带过去。这个模板打开时已经填好。
付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。