如何控制inadequate planning and design
- Consider safety in design before work starts, and ask designers and engineers to remove or reduce hazards at source.
- Plan the job in steps before starting, including access, equipment, sequence, emergency arrangements and who does what.
- Assess the risks for the task and site conditions, and review the assessment when conditions or the scope of work change.
- Consult workers, other contractors and the person in control of the site, and share the plan with everyone who is affected.
- Do a pre-start walk-through and update the hazards at the start of each shift, noting anything that has changed.
- Monitor hazards throughout the job, and stop work to reassess if something unexpected comes up.
常用的控制措施,最有效的排在前面。你的 SWMS 要针对你自己的工作和工地确定控制措施。
涵盖Inadequate planning and design的模板















超值套装 · 10 个模板


+6
超值套装 · 18 个模板


+14
体系 · 115 份文件


+111
体系 · 99 份文件
+95
超值套装 · 13 个模板


+9
超值套装 · 47 个模板


+43
体系 · 127 份文件


+123
体系 · 143 份文件

+139