如何控制inadequate planning and design

  1. Consider safety in design before work starts, and ask designers and engineers to remove or reduce hazards at source.
  2. Plan the job in steps before starting, including access, equipment, sequence, emergency arrangements and who does what.
  3. Assess the risks for the task and site conditions, and review the assessment when conditions or the scope of work change.
  4. Consult workers, other contractors and the person in control of the site, and share the plan with everyone who is affected.
  5. Do a pre-start walk-through and update the hazards at the start of each shift, noting anything that has changed.
  6. Monitor hazards throughout the job, and stop work to reassess if something unexpected comes up.

常用的控制措施,最有效的排在前面。你的 SWMS 要针对你自己的工作和工地确定控制措施。

涵盖Inadequate planning and design的模板

超值套装 · 13 个模板

Boilermaker

超值套装 · PACK-50413

13 份,只需 10 的价钱

+9
超值套装 · 53 个模板

Builders

超值套装 · PACK-50173

53 份,只需 28 的价钱

+49

查看全部 75 份模板

按工种浏览 SWMS

常同时出现的危险

这些模板引用的法规