Job Hazard Analysis (JHA) – Powered Mobile Plant
表格 - Version 2
Job Hazard Analysis (JHA) - Powered Mobile Plant 表格 · FORM-31104
- JHA #
- —
- Date JHA completed
- —
- Time
- —
- Review Due Date
- —
- Business Name
- —
- Business Address
- —
- ABN
- —
- Business Contact
- —
- Position
- —
- Phone #
- —
- Person/s responsible for ensuring compliance with JHA
- —
Workers consulted in the development, approval and communication of this JHA
Name | Job Title | Signature | Date |
|---|---|---|---|
Primary contractor / workplace owner details
- Business Name
- —
- Address
- —
- Business Contact
- —
- —
- Phone #
- —
Workplace details
- Name
- —
- Address
- —
- Location
- —
Emergency management
- Emergency Contact Numbers
- —
- First Aid Kit Location/s
- —
- Evacuation Point/Assembly Area
- —
- Safety Officer/s Name & Phone
- —
Job description
Focus on critical risks – safety essentials
Identified site hazards
Identified environmental hazards
Determine the risk score
| Consequence → | |||||
|---|---|---|---|---|---|
| Likelihood ↑ | InsignificantNo effect, or so minor that the effect is acceptable | MinorMinor first aid treatment, minimal business disruption, minimal environmental effect | ModerateSerious injuries, medium business interruption, medium environmental impact | MajorExtensive injuries or fatality, significant business interruption, environmental harm, prosecution | CatastrophicMultiple permanent disabilities or fatalities, business failure, substantial environmental harm, prosecution or imprisonment |
| Almost certainExpected in most circumstances | 2 M2 Moderate | 2 M2 Moderate | 3 H3 High | 4 A4 Acute | 4 A4 Acute |
| LikelyWill probably occur in most circumstances | 2 M2 Moderate | 2 M2 Moderate | 3 H3 High | 4 A4 Acute | 4 A4 Acute |
| PossibleCould possibly occur at some time | 1 L1 Low | 2 M2 Moderate | 2 M2 Moderate | 3 H3 High | 4 A4 Acute |
| UnlikelyUnlikely but possible | 1 L1 Low | 1 L1 Low | 2 M2 Moderate | 3 H3 High | 4 A4 Acute |
| RareHighly unlikely to occur | 1 L1 Low | 1 L1 Low | 2 M2 Moderate | 2 M2 Moderate | 3 H3 High |
- 1 L1 LowRecord and monitor. Proceed with work, and review the risks regularly.
- 2 M2 ModerateMaintain control measures. Be cautious when working, and monitor and review regularly.
- 3 H3 HighReview before commencing work. Introduce new controls or maintain high-level controls to lower the risk level, and monitor the controls frequently.
- 4 A4 AcuteDo not proceed until the risk level is reduced. Immediately introduce high-level controls, and re-assess before proceeding.
Score | Action |
|---|---|
Hierarchy of controls
Other hazards
Hazard | Risk Rating | SWI / EI* | Control Measures |
|---|---|---|---|
- Person Responsible
- —
- Person Responsible
- —
Worker Sign Off
I have read the above JHA, and I understand its contents. I confirm that I have the skills and training, including relevant certification, to conduct the tasks I have been allocated to complete. I agree to comply with safety requirements within this JHA, including identifying and monitoring hazards and adhering to risk control measures, relevant Risk Assessment, SWMS and permit requirements.
| Worker’s name | Licences, competencies & qualificationsType / descriptionClassNumber | Date | Signature |
|---|---|---|---|
| - | - | - | - |
| - | - | - | - |
| - | - | - | - |
Supervisor
- Name
- —
- Signature
- —
- Date
- —
Job Hazard Analysis (JHA) - Powered Mobile Plant 表格 · FORM-31104




