عرض الوصول المبكر:وصول مبكر: خصم 30%، ما دمت مشتركًا.

احصل على العرض

مستندات النماذج مكتوبة باللغة الإنجليزية.

حزمة توفير · 37 نماذج

Landscaping Combo

حزمة توفير · PACK-50343

معاينة نموذج حزمة توفير Landscaping Combo
  • 37 نماذج
  • 37 بسعر 27
  • يصل في مجلد واحد في المكتبة

A set of 22 SWMS and 15 SOPs for landscaping contractors.

The SWMS cover retaining walls, paving, decking, turf laying, tree felling and fencing. The SOPs include Lawn Mower, Brush Cutter and Chain Saw.

Each document is the same one sold on its own, so you get every update to it. Together they cost 27 template credits instead of 37.

معاينة SWMS Mobile Plant Working Near-Around

Mobile Plant Working Near-Around

SWMSVersion 8
Company doing the work
[Company]
Business contact
—
Phone #
—
Responsible person (for monitoring SWMS and work)
—
Signature
—
Date
—
Contact phone #
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone #
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW – identified in the Job Task column)

  • Mobile Plant

Planning and preparation

Planning/preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Undertake a site-specific induction, including training in communication with plant operators:

        • Groundworkers instructed on:

          • The UHF channel to communicate with plant operators

          • Not to approach mobile plant until the operator has agreed to their request to approach

          • On set distances to maintain from the mobile plant while in operation

          • Groundworkers and mobile plant operators are aware of any traffic management plan and no go zones

          • Are made familiar with the blind spots of the mobile plant

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures unanticipated hazards.

      After controls2 Moderate
      Responsible
      • Supervisorto check the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

7 خطوات عمل أخرى، من Housekeeping إلى Emergency response

لكل منها مخاطرها وتقييمات خطورتها وإجراءات التحكم فيها، إضافة إلى توقيع طاقمك.

المعاينة بصيغة

كيف يبدو في المتصفح

احصل على حزمة التوفير هذه

سجّل مجانًا، ثم اختر الطريقة التي تناسبك. يُضاف كل مستند إلى مكتبتك، في مجلد يحمل اسم الحزمة.

  • مشمول في الخطط المدفوعة

    استخدم أرصدة النماذج من خطتك. تكلفة هذه الحزمة 27 بدلًا من 37.

    قارن الخطط والأسعار
  • اشترِه مرة واحدة

    $2,428.65 $3,328.15 تُدفع مرة واحدة، ويبقى ملكك. يعمل على الخطة المجانية أيضًا.

لا حاجة إلى بطاقة للتسجيل. يحصل أعضاء الوصول المبكر على خصم 30% على أي خطة.

ما يتضمنه

  1. Mobile Plant Working Near-Around

    SWMS · 8 خطوات عمل

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    يُباع أيضًا منفردًا
  2. Retaining Wall

    SWMS · 19 خطوات عمل

    SWMS for building retaining walls: post and sleeper, masonry block and rock walls, from design and excavation to completion and emergencies.

    يُباع أيضًا منفردًا
  3. Lawn Mower

    SOP · 11 أقسام

    Safe operating procedure for a lawn mower: hazards, PPE, precautions, inspection, operation, fuelling, maintenance and a hazard checklist.

    يُباع أيضًا منفردًا
  4. Handheld Power Tools

    SOP · 9 أقسام

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    يُباع أيضًا منفردًا
  5. Brush Cutter

    SOP · 8 أقسام

    Safe operating procedure for a brush cutter: hazards, PPE, training, inspection, operation, fuelling, maintenance and a hazard checklist.

    يُباع أيضًا منفردًا
  6. Chain Saw

    SOP · 9 أقسام

    Safe operating procedure for a chain saw: hazards, PPE, training, pre-operational inspection, operation, maintenance, first aid and a hazard checklist.

    يُباع أيضًا منفردًا
  7. Tree Felling - Manual

    SWMS · 15 خطوات عمل

    SWMS for manual tree felling: training, power line permits, traffic, chainsaw use, cross-cutting, moving felled trees, fuelling and emergencies.

    يُباع أيضًا منفردًا
  8. Ride-On Mower

    SOP · 11 أقسام

    Safe operating procedure for a ride-on mower: hazards, PPE, pre-operational inspection, startup and mowing steps, fuelling and a hazard checklist.

    يُباع أيضًا منفردًا
  9. Landscape Planting

    SWMS · 18 خطوات عمل

    SWMS for landscape planting on roadsides and public sites: traffic, mobile plant, tools, soil and mulch, slopes, weather and emergencies.

    يُباع أيضًا منفردًا
  10. Tipper and Dog

    SWMS · 16 خطوات عمل

    Hazards and controls for operating a tip truck and dog trailer, including side tippers, from coupling trailers to tipping, refuelling and emergency response.

    يُباع أيضًا منفردًا
  11. Manual Handling

    SOP · 5 أقسام

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    يُباع أيضًا منفردًا
  12. Paving

    SWMS · 19 خطوات عمل

    Paving SWMS: 19 job steps covering subgrade preparation, cutting and laying pavers, silica dust, cement, acid washing and emergencies.

    يُباع أيضًا منفردًا
  13. Decking

    SWMS · 19 خطوات عمل

    SWMS for building a timber deck: falls from height, mobile plant, post footings, silica dust, wet cement and deck finishes.

    يُباع أيضًا منفردًا
  14. Lawn Edger

    SOP · 11 أقسام

    Safe operating procedure for a lawn edger: hazards, PPE, pre-operational inspection, training, operation, fuelling, maintenance and a hazard checklist.

    يُباع أيضًا منفردًا
  15. Turf Laying

    SWMS · 13 خطوات عمل

    Turf Laying SWMS: thirteen job steps covering the hazards and controls for preparing the site and laying turf, from delivery to emergency response.

    يُباع أيضًا منفردًا
  16. Lasers

    SWMS · 9 خطوات عمل

    Lasers SWMS: 9 job steps covering Class 1, 2 and 3R construction lasers, beam set-up, eye injury, mobile plant, roadside work and emergencies.

    يُباع أيضًا منفردًا
  17. Pole Pruner Saw

    SOP · 8 أقسام

    Safe operating procedure for a pole pruner saw: hazards, PPE, precautions, pre-operational inspection, operation, fuelling and a hazard checklist.

    يُباع أيضًا منفردًا
  18. Bark Blower Truck

    SWMS · 13 خطوات عمل

    SWMS for bark blower truck work: trailer coupling, travel between sites, loading and spreading soil, mulch and bark, traffic, refuelling and emergencies.

    يُباع أيضًا منفردًا
  19. Leaf Blower

    SOP · 9 أقسام

    Safe operating procedure for a leaf blower: hazards, PPE, training, inspection, operation, fuelling, maintenance and a hazard checklist.

    يُباع أيضًا منفردًا
  20. Bites and Stings Prevention and Treatment

    SWMS · 9 خطوات عمل

    Bites and Stings SWMS: nine job steps covering snake, spider, bee, wasp, tick and mosquito bite prevention, first aid and emergency response outdoors.

    يُباع أيضًا منفردًا
  21. Fencing

    SWMS · 16 خطوات عمل

    Fencing SWMS: 16 job steps for wire, timber, steel panel, pool and glass panel fences, from planning to post holes, gates and emergencies.

    يُباع أيضًا منفردًا
  22. Hand Tools

    SOP · 9 أقسام

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    يُباع أيضًا منفردًا
  23. Earthmoving Equipment

    SWMS · 23 خطوات عمل

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    يُباع أيضًا منفردًا
  24. Falls from Heavy Vehicles

    SOP · 7 أقسام

    Safe operating procedure to prevent falls from heavy vehicles: worker training, maintenance, cab access, trailers and a training register.

    يُباع أيضًا منفردًا
  25. Outdoor Work

    SOP · 11 أقسام

    Safe operating procedure for outdoor work: hazards, PPE, hot and cold conditions, poisonous plants, animals, first aid and a training register.

    يُباع أيضًا منفردًا
  26. Hedge Trimmer

    SOP · 11 أقسام

    Safe operating procedure for hedge trimmers: hazards, PPE, inspection, operation, fuelling, maintenance, first aid and a hazard checklist.

    يُباع أيضًا منفردًا
  27. Powered Non-powered Tools

    SWMS · 12 خطوات عمل

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    يُباع أيضًا منفردًا
  28. Wood Chipper

    SWMS · 14 خطوات عمل

    Wood Chipper SWMS: fourteen job steps covering delivery, set-up, operation, refuelling and emergency response for roadside wood chipping.

    يُباع أيضًا منفردًا
  29. Manual Handling

    SWMS · 18 خطوات عمل

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    يُباع أيضًا منفردًا
  30. Excavator

    SOP · 9 أقسام

    Safe operating procedure for an excavator: hazards, PPE, licensing, clearances, maintenance, step-by-step operation and a hazard checklist.

    يُباع أيضًا منفردًا
  31. Landscaping Irrigation

    SWMS · 15 خطوات عمل

    SWMS for landscaping irrigation installation: trenching, excavation, pipework, controller wiring, services, site set-up and emergency response.

    يُباع أيضًا منفردًا
  32. Pressure Cleaner

    SOP · 9 أقسام

    Safe operating procedure for a water pressure cleaner: hazards, PPE, precautions, inspection, set-up, operation, storage, maintenance and a hazard checklist.

    يُباع أيضًا منفردًا
  33. Concrete Slab on Ground

    SWMS · 17 خطوات عمل

    Safe work method statement for concrete slab on ground work, covering formwork, fill and steel reinforcement placement, with the hazards and controls for each job step.

    يُباع أيضًا منفردًا
  34. Water Features

    SWMS · 18 خطوات عمل

    Water Features SWMS: 18 job steps for installing water features and garden ponds, from excavation and liners to pumps and emergency response.

    يُباع أيضًا منفردًا
  35. Stump Grinder

    SWMS · 14 خطوات عمل

    SWMS for stump grinder work: delivery and coupling, traffic, set-up, operation, refuelling and emergency response.

    يُباع أيضًا منفردًا
  36. Soft-fall Surface Removal and Installation

    SWMS · 14 خطوات عمل

    SWMS for removing and installing soft-fall surfacing: site set-up, removal, wet pour rubber mixing and laying, refuelling and emergencies.

    يُباع أيضًا منفردًا
  37. Synthetic Grass Laying

    SWMS · 17 خطوات عمل

    Synthetic Grass Laying SWMS: 17 job steps from turf removal and subgrade preparation to grass laying, seaming, re-fuelling and emergencies.

    يُباع أيضًا منفردًا

ما يغطيه

المخاطر التي يغطيها

التشريعات والمعايير التي يستند إليها

يأتي كل SWMS مع قائمة مراجع التشريعات ومدونات الممارسة الخاصة بنا.

ما توفّره

النموذجخطوات العملمنفردًا
Mobile Plant Working Near-Around8$89.95 · رصيد واحد
Retaining Wall19$89.95 · رصيد واحد
Lawn Mower0$89.95 · رصيد واحد
Handheld Power Tools0$89.95 · رصيد واحد
Brush Cutter0$89.95 · رصيد واحد
Chain Saw0$89.95 · رصيد واحد
Tree Felling - Manual15$89.95 · رصيد واحد
Ride-On Mower0$89.95 · رصيد واحد
Landscape Planting18$89.95 · رصيد واحد
Tipper and Dog16$89.95 · رصيد واحد
Manual Handling0$89.95 · رصيد واحد
Paving19$89.95 · رصيد واحد
Decking19$89.95 · رصيد واحد
Lawn Edger0$89.95 · رصيد واحد
Turf Laying13$89.95 · رصيد واحد
Lasers9$89.95 · رصيد واحد
Pole Pruner Saw0$89.95 · رصيد واحد
Bark Blower Truck13$89.95 · رصيد واحد
Leaf Blower0$89.95 · رصيد واحد
Bites and Stings Prevention and Treatment9$89.95 · رصيد واحد
Fencing16$89.95 · رصيد واحد
Hand Tools0$89.95 · رصيد واحد
Earthmoving Equipment23$89.95 · رصيد واحد
Falls from Heavy Vehicles0$89.95 · رصيد واحد
Outdoor Work0$89.95 · رصيد واحد
Hedge Trimmer0$89.95 · رصيد واحد
Powered Non-powered Tools12$89.95 · رصيد واحد
Wood Chipper14$89.95 · رصيد واحد
Manual Handling18$89.95 · رصيد واحد
Excavator0$89.95 · رصيد واحد
Landscaping Irrigation15$89.95 · رصيد واحد
Pressure Cleaner0$89.95 · رصيد واحد
Concrete Slab on Ground17$89.95 · رصيد واحد
Water Features18$89.95 · رصيد واحد
Stump Grinder14$89.95 · رصيد واحد
Soft-fall Surface Removal and Installation14$89.95 · رصيد واحد
Synthetic Grass Laying17$89.95 · رصيد واحد
عند الشراء واحدًا تلو الآخر$3,328.15 · 37 أرصدة
ضمن هذه الحزمة$2,428.65 · 27 أرصدة توفّر $899.50

المراجعات

لا توجد مراجعات بعد.

كيف تعمل النماذج

جرّبه قبل أن تدفع.

  1. معاينة مجانية

    خطوات العمل والمخاطر والمهمة الأولى في كل نموذج متاحة للقراءة. دون تسجيل.

  2. جرّب المحرّر

    كيّف بيان SWMS تجريبيًا باسم شركتك ومهمتك وموقعك، على الحاسوب أو هاتفك.

  3. سجّل مجانًا

    تنتقل بياناتك وشعارك معك. وهذا النموذج يُفتح معبّأً مسبقًا.

  4. استخدم رصيدًا أو اشترِ مرة واحدة

    تتضمن الخطط المدفوعة أرصدة نماذج كل شهر. أو اشترِ هذا النموذج ليبقى لك.