عرض الوصول المبكر:وصول مبكر: خصم 30%، ما دمت مشتركًا.

احصل على العرض

مستندات النماذج مكتوبة باللغة الإنجليزية.

Rail Corridor

SWMS · SWMS-10589

معاينة نموذج SWMS Rail Corridor
  • 15 خطوات عمل
  • اشتُري 122 مرة
  • النسخة 4
  • Civil Works
  • يُقرأ على أي هاتف

This SWMS covers the hazards and controls for preparing, planning and carrying out work in a rail corridor. It is meant as an attachment, used alongside the SWMS for the specific work being done in the corridor.

It takes your crew through each step, from training and planning to work area set-up, deliveries, tools, hazardous substances, roadside work, completion and emergency response.

It suits contractors, site supervisors and safety officers on construction or maintenance work in rail corridors.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

معاينة SWMS Rail Corridor

Rail Corridor

SWMSVersion 4
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW – identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Traffic CorridorsWork carried out adjacent to a road, railway or shipping lane, traffic corridor

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Training

    • Hazard

      Struck by train, electrocution

      Before controls4 Acute
      Controls
      • Ensure all people working within rail corridor (15m from outer tracks or between track and fence line) have undergone formal Rail Industry Safety Induction and certificate of competencies as required

      • All people who are required or may be required for their work to enter a part of the Rail Corridor deemed to be an Electrical Traction Corridor must have successfully completed Electrical Safety Awareness training.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

14 خطوات عمل أخرى، من Planning إلى Emergency response

لكل منها مخاطرها وتقييمات خطورتها وإجراءات التحكم فيها، إضافة إلى توقيع طاقمك.

المعاينة بصيغة

كيف يبدو في المتصفح

احصل على هذا النموذج

سجّل مجانًا، ثم اختر الطريقة التي تناسبك. تُعبّأ بيانات شركتك تلقائيًا.

  • مشمول في الخطط المدفوعة

    استخدم أرصدة النماذج من خطتك. تكلفة هذا النموذج 1.

    قارن الخطط والأسعار
  • اشترِه مرة واحدة

    $89.95 تُدفع مرة واحدة، ويبقى ملكك. يعمل على الخطة المجانية أيضًا.

لا حاجة إلى بطاقة للتسجيل. يحصل أعضاء الوصول المبكر على خصم 30% على أي خطة.

ما يغطيه

15 خطوات عمل

  1. TrainingInduct personnel and make them aware of rail-specific hazards.
  2. PlanningPlan the work to minimise disruption and meet rail network requirements.
  3. Check weather conditions & prepareCheck the weather and take weather-related precautions.
  4. Arrival on-site & assess onsite conditionsAssess the site and identify risks on arrival.
  5. Work area set-upSet up safe zones and agree communication with network control.
  6. House keepingKeep the work environment clean and safe.
  7. Manual tasksPrevent musculoskeletal injuries.
  8. Materials deliveryDeliver materials safely to avoid accidents.
  9. Working with powered & non-powered toolsFollow electrical safety and tool operation protocols.
  10. Hazardous substance / chemical useHandle and use hazardous materials safely.
  11. Working & delivery of materials & equipmentWork and deliver materials safely within the rail corridor.
  12. Working roadside (crossings etc.)Manage traffic and keep the public safe.
  13. Hazardous atmospheres / materialsManage the risks from asbestos and lead.
  14. On completionSecure the site and keep it safe after completion.
  15. Emergency responseRespond to emergencies and incidents.

المخاطر التي يغطيها

المراجعات

لا توجد مراجعات بعد.

اعرض الكل

كيف تعمل النماذج

جرّبه قبل أن تدفع.

  1. معاينة مجانية

    خطوات العمل والمخاطر والمهمة الأولى في كل نموذج متاحة للقراءة. دون تسجيل.

  2. جرّب المحرّر

    كيّف بيان SWMS تجريبيًا باسم شركتك ومهمتك وموقعك، على الحاسوب أو هاتفك.

  3. سجّل مجانًا

    تنتقل بياناتك وشعارك معك. وهذا النموذج يُفتح معبّأً مسبقًا.

  4. استخدم رصيدًا أو اشترِ مرة واحدة

    تتضمن الخطط المدفوعة أرصدة نماذج كل شهر. أو اشترِ هذا النموذج ليبقى لك.