Adverse weather toolbox talk
Read it out at the pre-start or a toolbox meeting, talk through the questions, and have everyone sign on. It's built from our adverse weather page and the 440 SafetyDocs templates that cover it.
- Site
- Date
- Presented by
What it is
Wind, rain, storms, heat or cold that make work unsafe, especially at height or outdoors.
Controls to check, most effective first
- Check forecasts and Bureau of Meteorology warnings before starting, and reschedule outdoor or at-height work when severe weather is expected.
- Set wind stop-work triggers for cranes, elevated work platforms and scaffold work, using the manufacturer's limits for each item of plant.
- Secure loose sheeting, materials and tools, and take down signs or screens that could become windborne in strong gusts.
- Stop work and move to shelter at the first sign of lightning, keeping away from tall plant and metal structures.
- Inspect scaffolds, excavations and access routes after storms or heavy rain before anyone resumes work.
- Provide wet-weather gear and slip-resistant footwear, and treat wet surfaces as slip hazards until they dry.
Where it comes up on the job
Work steps from SafetyDocs templates that deal with adverse weather:
- Check weather conditions & prepareCheck the weather and protect workers from heat and coldFrom Handrail Installation
- Weather conditionsMonitor the weather and protect workers from sun, heat and coldFrom Hoarding Installation Removal
- Check weather conditions and prepareCheck the forecast, reschedule work in extreme weather, and prepare crews for heat or cold.From Lasers
- Working outdoorsManage extreme weather, heat and cold, and bites and stings when working outdoors.From Turf Restoration
- Assess on-site conditionsCheck site entry requirements, site hazards and weather conditionsFrom Crane Overhead Bridge Gantry
Questions for the crew
- Where could adverse weather come up on this job today?
- Is any of this work on today's job: Check weather conditions & prepare; Weather conditions; Check weather conditions and prepare?
- The most effective control is: “Check forecasts and Bureau of Meteorology warnings before starting, and reschedule outdoor or at-height work when severe weather is expected”. Can we do that here? If not, why not?
- Which controls for adverse weather are missing or not working on this site?
- When would you stop work because of adverse weather, and who would you tell?
- How do we report a hazard, a near miss or an incident on this job?
Sign-on record
Everyone who attended signs below. Keep it with your toolbox talk records.
| Name | Company | Signature |
|---|---|---|
A starting point for a talk, not a SWMS or a risk assessment. Add what's particular to your site and crew.