EWP, Boom, Cherry Picker and Scissor Lift
- Company doing the work
- [Company]
- Business contact and phone
- —
- Responsible person (for monitoring SWMS and work)
- —
- Responsible person's phone
- —
- Responsible person's signature
- —
- Date signed
- —
- Principal contractor (PC)
- [Principal contractor]
- PC address
- —
- PC phone
- [PC phone]
- Date SWMS provided to PC
- —
- Job site address
- [Site address]
- Part of a construction project
- —
Site management plan
If the work is part of a construction project, this SWMS must align with the site management plan in place for the project.
High-risk construction work (HRCW)
This work involves the following high-risk construction work. The job steps that involve it are marked HRCW.
- FallsRisk of a person falling more than two metres. Note: in some jurisdictions this is three metres.
- Energised ElectricalWork on or near energised electrical installations or services
- Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere
- Mobile PlantWork in an area where there is any movement of powered mobile plant
Working with a risk of a fall over 2 metres
The fall from height hierarchy of control level considered when establishing controls:
- L1Work on the ground or solid construction, not chosen
- L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
- L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
- L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
- L5Implement administrative controls, e.g. signage or instruction, not chosen
No level has been chosen yet.
Planning and preparation
Liaise with the principal contractor to identify on-site safety systems and procedures
Establish supervisory and communication arrangements
The principal contractor confirms emergency response procedures are in place
Hold points
Hold points are identified and signed off before work continues: (specify the hold points)
Training and licences
All workers have a General Construction Induction Card (White Card)
Relevant workers hold the relevant certificates of competency, licences and training, recorded for each worker in the SWMS sign-off
A trained first aider is on site
All workers are trained in site-specific emergency and evacuation procedures, this SWMS, safe work procedures and safety data sheets
Worker duties and responsibilities
Be fit for work, with no signs of fatigue, alcohol or drugs
Attend all site inductions and briefings
Comply with all site requirements, e.g. PPE and traffic management plans (TMP)
Only carry out work related to the contract
Inspect completed work and report possible safety, environmental and quality matters to the supervisor
Monitoring and review
All people involved in the task must have this SWMS communicated to them before work commences
SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident
If additional site hazards identified, review this SWMS and amend control measures to suit
People affected by revisions to this SWMS, including workers, contractors and sub-contractors, must be informed as soon as possible
Give the principal contractor a copy of the revised SWMS
The site supervisor to monitor works against the controls stated in this SWMS
SWMS must be kept on-site and made available for inspection or review
Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident
Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually
Site-specific notes
(add any notes specific to this site)
Legislation and codes of practice
Australian Government
Acts and regulations
- Work Health and Safety Act 2011
- Work Health and Safety Regulations 2011.
Codes of practice
- Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
- Work Health and Safety (Managing the Risk of Falls at Workplaces) Code of Practice 2015
- Work Health and Safety (Managing Risks of Plant in the Workplace) Code of Practice 2015
- Work Health and Safety (Construction Work) Code of Practice 2015
Australian Capital Territory
Acts and regulations
- Work Health and Safety Act 2011
- Work Health and Safety Regulation 2011
Codes of practice
- Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
- Work Health and Safety (Managing the Risk of Falls at Workplaces Code of Practice) Approval 2020
- Work Health and Safety (Construction Work Code of Practice) Approval 2025
- Work Health and Safety (Managing Risks of Plant in the Workplace Code of Practice) 2025
Queensland
Acts and regulations
- Work Health and Safety Act 2011
- Work Health and Safety Regulation 2011
Codes of practice
- First Aid in the Workplace Code of Practice 2021
- Managing the Risk of Falls at Workplaces Code of Practice 2021
- Managing Risks of Plant in the Workplace Code of Practice 2021
- Working near overhead and underground electric lines Electrical Safety Code of Practice 2020
New South Wales
Acts and regulations
- Work Health and Safety Act 2011
- Work Health and Safety Regulation 2025
Codes of practice
- First Aid in the workplace code of practice 2020
- Managing the risk of falls at workplace code of practice 2019
- Managing the risks of plant in the workplace code of practice 2022
- Construction work code of practice 2019
- Elevating work platforms code of practice 2026
- Work near overhead and underground electric lines code of practice 2026
Northern Territory
Acts and regulations
- Work Health and Safety (National Uniform Legislation) Act 2011
- Work Health and Safety (National Uniform Legislation) Regulations 2011
Codes of practice
- First aid in the workplace – Code of practice 2022
- Managing risks of plant in the workplace Code of Practice 2026
- Managing the risk of falls at workplaces- Code of practice 2020
- Construction work - code of practice 2026
South Australia
Acts and regulations
- Work Health and Safety Act 2012
- Work Health and Safety Regulation 2012
Codes of practice
- First Aid in the Workplace: Code of practice 2020
- Managing the Risks of Plant in the Workplace: Code of practice 2020
- Managing the Risk of Falls at Workplaces: Code of practice 2020
- Construction work Code of Practice 2024
- Elevating work platforms: Code of practice 2025
Tasmania
Acts and regulations
- Work Health and Safety Act 2012
- Work Health and Safety Regulations 2022
Codes of practice
- First Aid in the Workplace - Code of practice 2020
- Managing the Risk of Falls at Workplaces - Code of practice 2018
- Construction Work - Code of practice 2024
- Managing the Risks of Plant in the Workplace - Code of practice 2024
Western Australia
Acts and regulations
- Work Health and Safety Act 2020
- Work Health and Safety (General) Regulations 2022
Codes of practice
- First aid in the workplace - Code of Practice 2022
- Managing risks of plant in the workplace – Code of practice 2022
- Managing the risk of falls at workplaces – Code of practice 2022
- Construction work – Code of practice 2022
Victoria
Acts and regulations
- Occupational Health and Safety Act 2004
- Occupational Health and Safety Regulations 2017
Codes of practice
- First Aid in the Workplace: Compliance code 2021
- Prevention of falls in general construction: Compliance code 2019
Personal protective equipment (PPE)
- Foot Protection
- High Visibility
- Head Protection
- Eye Protection
- Face Protection
- Hand Protection
- Protective Clothing
- Sun Protection
- Safety Harness
Do not wear rings, watches or jewellery that may become entangled. Tie back long and loose hair.
Job steps, hazards and controls
- Work activity
Implement a falls emergency rescue plan
- Hazard
Personal injury from a fall
Before controls4 AcuteControlsEnsure a falls rescue plan completed for every job
Amend the plan if conditions of the work change in a way that could affect a rescue/response
Trained first aid providers must be available on site
Ensure a reliable means to contact emergency services is available
After controls2 ModerateResponsible- SupervisorEnsure the plan is in place
IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute
Overall risk after controls2 MModeratethe highest rating after controls
11 more job steps, from Arrival on site and site assessment to Emergency response
Each with its hazards, risk ratings and controls, plus your crew's sign-on.