Line Marking

SWMS · SWMS-10421

  • 13 pasos del trabajo
  • Versión 6

This Line Marking Safe Work Method Statement (SWMS) covers the hazards and controls for carrying out line-marking tasks with an airless line-marking machine on concrete and bitumen surfaces.

It sets out 13 job steps, from planning and work area set-up to line marking, refuelling, completion and emergency response, with the hazards, controls and responsible people for each step. It covers work next to traffic, environmental protection, hazardous substances and fire.

It suits roadwork contractors, car park maintenance teams, sports facility maintenance crews and construction companies that need line marking, particularly near traffic or with hazardous substances.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

Ver su propia página

Vista previa de SWMS Line Marking

Line Marking

SWMSVersion 6
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere
  • Traffic CorridorsWork carried out adjacent to a road, railway or shipping lane, traffic corridor

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Unpermitted work

      Before controls3 High
      Controls
      • Obtain written consent from Coordinating Road Authority if applicable.

        Example:

        • Minor works with no traffic impact = no consent required

        • Where traffic is impacted, consent is required

        • Roads other than freeways, minor works = no consent.

      • Car park - Liaise with Principal Contractor to confirm car park closure for the duration of operations.

      After controls2 Moderate
      Responsible
      • Supervisorto undertake all planning processes

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

12 pasos más del trabajo, de Check weather conditions & prepare a Emergency response

Cada uno con sus peligros, niveles de riesgo y controles, además de las firmas de tu equipo.

Ver como

Cómo se ve en un navegador

Consigue este paquete ahorro

Regístrate gratis y luego elige cómo lo quieres. Cada documento va a tu Biblioteca, en una carpeta con el nombre del paquete.

  • Incluido en los planes de pago

    Usa créditos de plantilla de tu plan. Este paquete cuesta 38 en vez de 57.

    Comparar planes y precios
  • Cómprala una sola vez

    $3,418.10 $5,127.15 pago único, y es tuya para siempre. También sirve con el plan Gratis.

No necesitas tarjeta para registrarte. Los miembros con acceso anticipado tienen un 30% de descuento en cualquier plan.

Qué cubre

13 pasos del trabajo

  1. PlanningGet road authority consent where needed and confirm any car park closure
  2. Check weather conditions & prepareCheck the weather and protect workers from heat and cold
  3. Arrival on-site & assess onsite conditionsPark safely, report in and check the site before work
  4. Work area set-upSet up traffic management, pedestrian controls and fire protection
  5. EnvironmentControl noise, waste, fuel, paint and other environmental impacts
  6. House keepingKeep the work area clean, lit and free of trip hazards
  7. Manual tasksHandle paint containers and equipment without strain
  8. Working with powered & non-powered toolsInspect and use powered and non-powered tools safely
  9. Hazardous substance /chemical useTransport and use chemicals, paint and fuel safely
  10. Line markingRun the line-marking machine safely around traffic, people and plant
  11. Fuelling on-siteRefuel following the manufacturer's instructions and avoid contact with fuel
  12. On completionSecure plant and the site, and sign out
  13. Emergency responseCall 000, follow emergency procedures and give first aid

Peligros que cubre

Cómo funcionan las plantillas

Pruébalo antes de pagar.

  1. Vista previa gratis

    Los pasos del trabajo, los peligros y la primera tarea de cada plantilla se pueden leer. Sin registrarte.

  2. Prueba el editor

    Adapta un SWMS de demostración con tu empresa, tu trabajo y tu obra, en una computadora o en tu teléfono.

  3. Regístrate gratis

    Tus datos y tu logo se pasan. Esta plantilla se abre ya rellenada.

  4. Usa un crédito o compra una sola vez

    Los planes de pago incluyen créditos de plantilla cada mes. O compra esta para quedártela.