अर्ली एक्सेस ऑफ़र:अर्ली एक्सेस: 30% की छूट, जब तक आपकी सदस्यता चलती रहे.

ऑफ़र लें

टेम्पलेट दस्तावेज़ अंग्रेज़ी में लिखे गए हैं।

वैल्यू पैक · 54 टेम्पलेट

Builders OHS-WHS Combo

वैल्यू पैक · PACK-50443

Builders OHS-WHS Combo वैल्यू पैक टेम्पलेट का पूर्वावलोकन
  • 54 टेम्पलेट
  • 28 की कीमत में 54
  • लाइब्रेरी के एक फ़ोल्डर में आता है

A set of 53 SWMS and one plan for builders and building contractors.

The SWMS cover site establishment, carpentry, roofing, scaffolding, plumbing and drainage, glazing and painting. It also includes Construction OHS/WHS Project Management Plan.

Each document is the same one sold on its own, so you get every update to it. Together they cost 28 template credits instead of 54.

Height Access Equipment SWMS का प्रीव्यू

Height Access Equipment

SWMSVersion 11
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • FallsRisk of a person falling more than two metres. Note: in some jurisdictions this is three metres.
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (How to Manage Work Health and Safety Risks) Code of Practice 2015
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (How to Manage Work Health and Safety Risks Code of Practice) Approval 2025
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2025
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • How to manage work health and safety risks code of practice 2019
  • Managing the work environment and facilities code of practice 2019
  • Construction work code of practice 2019

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • How to manage work health and safety risks - Code of practice 2026
  • Managing the work environment and facilities - Code of practice 2026
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • How to Manage Work Health and Safety Risks: Code of practice 2020
  • Managing the Work Environment and Facilities: Code of practice 2020
  • Construction work Code of Practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • How to Manage Work Health and Safety Risks - Code of practice 2024
  • Managing the Work Environment and Facilities - Code of practice 2024
  • Construction Work - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • How to manage work health and safety risks – Code of practice 2022
  • Managing the work environment and facilities – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Ensure site-specific induction undertaken

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures for unanticipated hazards.

      After controls2 Moderate
      Responsible
      • SupervisorCheck the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

काम के 16 और चरण, Work area set-up से Emergency response तक

हर एक में उसके ख़तरे, जोखिम रेटिंग और नियंत्रण, और साथ में आपके क्रू का साइन-ऑन।

ऐसे प्रीव्यू करें

ब्राउज़र में यह कैसा दिखता है

यह वैल्यू पैक पाएँ

मुफ़्त में साइन अप करें, फिर चुनें कि आप इसे कैसे लेना चाहते हैं। हर दस्तावेज़ आपकी लाइब्रेरी में, पैक के नाम वाले फ़ोल्डर में जाता है।

  • पेड प्लान में शामिल

    अपने प्लान के टेम्पलेट क्रेडिट इस्तेमाल करें। इस पैक की कीमत 54 के बजाय 28 है।

    प्लान और कीमतों की तुलना करें
  • एक बार ख़रीदें

    $2,518.60 $4,857.30 एक बार का भुगतान, और यह हमेशा आपका रहेगा। मुफ़्त प्लान पर भी चलता है।

साइन अप के लिए कार्ड नहीं चाहिए। अर्ली एक्सेस सदस्यों को किसी भी प्लान पर 30% की छूट मिलती है।

क्या-क्या शामिल है

  1. Height Access Equipment

    SWMS · काम के 17 चरण

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    अलग से भी मिलता है
  2. Internal External Lock-Up Fix Stage Carpentry

    SWMS · काम के 15 चरण

    Covers internal and external lock-up and fix stage carpentry, with the risks and controls for each job step from site arrival to emergency response.

    अलग से भी मिलता है
  3. Painting and Decorating

    SWMS · काम के 15 चरण

    SWMS for painting and decorating work: transport, site set-up, ladders and scaffolds, surface preparation, mixing, spraying and emergencies.

    अलग से भी मिलता है
  4. Roof Work

    SWMS · काम के 14 चरण

    SWMS for roof work: hazards and controls for falls from height, asbestos, access by scaffold, ladder or hatch, harness use, tools and emergencies.

    अलग से भी मिलता है
  5. Glazing

    SWMS · काम के 15 चरण

    A glazing SWMS covering cutting, drilling, grinding and installing glass balustrades, windows, doors, shower screens and mirrors.

    अलग से भी मिलता है
  6. Mobile Plant Working Near-Around

    SWMS · काम के 8 चरण

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    अलग से भी मिलता है
  7. Retaining Wall

    SWMS · काम के 19 चरण

    SWMS for building retaining walls: post and sleeper, masonry block and rock walls, from design and excavation to completion and emergencies.

    अलग से भी मिलता है
  8. Roof Edge Protection

    SWMS · काम के 16 चरण

    SWMS for installing and dismantling roof edge protection using extension ladders, mobile scaffolding and safety harnesses.

    अलग से भी मिलता है
  9. Garage Door Installation

    SWMS · काम के 14 चरण

    Garage Door Installation SWMS: 14 job steps covering silica dust, ladders, manual tasks, door opener wiring, tools, chemicals and emergencies.

    अलग से भी मिलता है
  10. Insulation - Batts Installation

    SWMS · काम के 12 चरण

    SWMS for installing insulation batts in ceilings and walls: planning, delivery, ceiling space access, electricity, falls, asbestos, heat stress and fire.

    अलग से भी मिलता है
  11. Erecting Fixed Scaffold

    SWMS · काम के 14 चरण

    Erecting Fixed Scaffold SWMS: 14 job steps from unloading and erecting to handover, dismantling and emergency response.

    अलग से भी मिलता है
  12. Plumbing Drainage

    SWMS · काम के 18 चरण

    Plumbing drainage SWMS for installing pipes, stormwater tanks and polyethylene pipe welding, and for sewage and stormwater drainage on civil works.

    अलग से भी मिलता है
  13. Final Building Clean Before Handover to Client

    SWMS · काम के 10 चरण

    SWMS for the final clean of a building before handover: site set-up, mobile plant, trestles and ladders, cleaning chemicals, manual tasks, dust and sharps.

    अलग से भी मिलता है
  14. Rough-in Final Fit-out Plumbing

    SWMS · काम के 18 चरण

    Rough-in Final Fit-out Plumbing SWMS: 18 job steps covering pipework, appliances and fixtures, excavation, hot work, silica dust and emergencies.

    अलग से भी मिलता है
  15. Timber Floor Laying

    SWMS · काम के 13 चरण

    Timber Floor Laying SWMS: 13 job steps covering delivery, underlay, timber boards, silica and wood dust, nail guns, adhesives and emergencies.

    अलग से भी मिलता है
  16. Skip Bin

    SWMS · काम के 11 चरण

    Skip Bin SWMS: eleven job steps for skip bin delivery and pick-up with a truck-mounted skip lifter, from travel and set-up to emergency response.

    अलग से भी मिलता है
  17. Concrete Boom or Line Pumping

    SWMS · काम के 15 चरण

    SWMS for truck-mounted concrete boom and line pumping: road travel, pump set-up, the pour, clearing line blockages, line cleaning and emergencies.

    अलग से भी मिलता है
  18. Traffic Corridor - Establishing a Safe Work Zone

    SWMS · काम के 8 चरण

    Traffic corridor SWMS: 8 job steps covering the traffic management plan, safe work zone set-up, traffic controllers, pedestrians and zone takeouts.

    अलग से भी मिलता है
  19. Construction Labourer

    SWMS · काम के 16 चरण

    Construction Labourer SWMS: 16 job steps for labourers on construction sites, from silica dust and mobile plant to ladders and emergency response.

    अलग से भी मिलता है
  20. Temporary Fencing

    SWMS · काम के 11 चरण

    SWMS for temporary fencing: delivery, set-up, installation and removal, traffic and plant, manual tasks, housekeeping, completion and emergencies.

    अलग से भी मिलता है
  21. Plasterboard

    SWMS · काम के 16 चरण

    Plasterboard SWMS for fixing and setting sheets to walls and ceilings, with cornice: 16 job steps from silica dust training to cutting, sanding and stilts.

    अलग से भी मिलता है
  22. Decking

    SWMS · काम के 19 चरण

    SWMS for building a timber deck: falls from height, mobile plant, post footings, silica dust, wet cement and deck finishes.

    अलग से भी मिलता है
  23. Brick and Block Laying

    SWMS · काम के 22 चरण

    SWMS for brick and block laying: silica dust, materials delivery, mortar, cutting and laying, core steel, acid washing, scaffolds and ladders, and emergencies.

    अलग से भी मिलता है
  24. Concrete Foundations Excavating - Pouring

    SWMS · काम के 17 चरण

    SWMS for excavating, steel setting and pouring concrete foundations: 17 job steps from site set-up and plant delivery to the pour and emergencies.

    अलग से भी मिलता है
  25. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · काम के 12 चरण

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    अलग से भी मिलता है
  26. Fencing

    SWMS · काम के 16 चरण

    Fencing SWMS: 16 job steps for wire, timber, steel panel, pool and glass panel fences, from planning to post holes, gates and emergencies.

    अलग से भी मिलता है
  27. Duct Work Installation

    SWMS · काम के 11 चरण

    SWMS for installing ductwork for exhaust and air conditioning systems: site set-up, delivery, roof space work, tools, chemicals and emergencies.

    अलग से भी मिलता है
  28. Working in Roof Spaces

    SWMS · काम के 8 चरण

    SWMS for working in roof spaces, ceiling spaces and subfloors: electrical hazards, ladders, heat stress, vermin, snakes and emergency response.

    अलग से भी मिलता है
  29. Construction Site Visitor

    SWMS · काम के 7 चरण

    Construction Site Visitor SWMS: 7 job steps covering weather, site arrival, manual tasks, navigating the site and emergencies.

    अलग से भी मिलता है
  30. Overhead Electric Lines - Working Near

    SWMS · काम के 6 चरण

    Overhead Electric Lines SWMS: 6 job steps covering exclusion zones, spotters, mobile plant near powerlines and emergency response.

    अलग से भी मिलता है
  31. Construction OHS/WHS Project Management Plan

    मैनेजमेंट प्लान · 28 सेक्शन

    A construction OHS/WHS site management plan covering site rules, risk management, contractors, incidents and the forms and registers a project needs.

    अलग से भी मिलता है
  32. Earthmoving Equipment

    SWMS · काम के 23 चरण

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    अलग से भी मिलता है
  33. Timber Floor Sanding and Finishing

    SWMS · काम के 14 चरण

    SWMS for sanding indoor timber floors and applying varnish or similar coatings: set-up, tools, dust, chemicals, refuelling and emergencies.

    अलग से भी मिलता है
  34. Cladding

    SWMS · काम के 12 चरण

    SWMS for installing cladding or siding, such as Hardie plank, on the outside of structures: delivery, access, silica dust, tools and emergencies.

    अलग से भी मिलता है
  35. Cabinet Installation

    SWMS · काम के 12 चरण

    SWMS for cabinet making and installation: client consultation, site set-up, tools, hazardous substances, dust control, ladders, cuts and emergencies.

    अलग से भी मिलता है
  36. Air Conditioning Installation

    SWMS · काम के 16 चरण

    Covers installing, maintaining or repairing air conditioning units, with the risks and controls for each job step from planning to emergency response.

    अलग से भी मिलता है
  37. Dogman

    SWMS · काम के 12 चरण

    A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.

    अलग से भी मिलता है
  38. Rendering

    SWMS · काम के 14 चरण

    SWMS for rendering: silica dust, weather, work area set-up, ladders and scaffolds, surface preparation, render mixing, fuelling and emergency response.

    अलग से भी मिलता है
  39. Electrical New Installation

    SWMS · काम के 20 चरण

    SWMS for new electrical installations: planning, site set-up, tools, ladders, live work, excavation, switchboards, testing and emergencies.

    अलग से भी मिलता है
  40. Powered Non-powered Tools

    SWMS · काम के 12 चरण

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    अलग से भी मिलता है
  41. Plumbing Gas Fitting

    SWMS · काम के 21 चरण

    Plumbing Gas Fitting SWMS: 21 job steps for gas fitting work, from planning and excavation to pipework, purging and pressure testing.

    अलग से भी मिलता है
  42. Manual Handling

    SWMS · काम के 18 चरण

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    अलग से भी मिलता है
  43. Carpet Laying

    SWMS · काम के 14 चरण

    A Carpet Laying SWMS covering the hazards and controls for installing carpets and carpet tiles, from floor preparation to laying, trimming and seaming.

    अलग से भी मिलता है
  44. Tiling

    SWMS · काम के 14 चरण

    Tiling SWMS: 14 job steps covering silica dust, weather, delivery, ladders and scaffold, tile cutting, completion and emergencies.

    अलग से भी मिलता है
  45. Awnings Blinds Curtains Installation

    SWMS · काम के 14 चरण

    SWMS for installing awnings, blinds and curtains: site set-up, tools, working at height on ladders and trestles, drilling brackets, mounting and emergencies.

    अलग से भी मिलता है
  46. Excavation Near Assets

    SWMS · काम के 13 चरण

    SWMS for excavating near underground services and assets: site planning, survey, work area set-up, contact with utilities and emergency response.

    अलग से भी मिलता है
  47. Plumbing - Water Meter Installation

    SWMS · काम के 16 चरण

    Plumbing SWMS for installing water meters: 16 job steps from site assessment and electrical hazards to excavation, confined space and emergency response.

    अलग से भी मिलता है
  48. Concrete Slab on Ground

    SWMS · काम के 17 चरण

    Safe work method statement for concrete slab on ground work, covering formwork, fill and steel reinforcement placement, with the hazards and controls for each job step.

    अलग से भी मिलता है
  49. Waterproofing

    SWMS · काम के 12 चरण

    SWMS for waterproofing internal wet areas, balconies and rooftops: site set-up, tools, working at height, membranes and torch-on work.

    अलग से भी मिलता है
  50. Floating Floor Laying

    SWMS · काम के 14 चरण

    Covers safe floating floor installation, with the risks and controls for each job step from site arrival to emergency response.

    अलग से भी मिलता है
  51. Aluminium Window Door Frame Installation

    SWMS · काम के 15 चरण

    Aluminium window and door frame installation SWMS: 15 job steps from silica training and site set-up to scaffolds, cutting, fixing frames and emergencies.

    अलग से भी मिलता है
  52. Framing and Trusses - Timber-Steel

    SWMS · काम के 15 चरण

    SWMS for erecting timber and steel framing and trusses: delivery, working at height, standing frames, craning and bracing trusses, and emergency response.

    अलग से भी मिलता है
  53. Site Establishment

    SWMS · काम के 11 चरण

    Site Establishment SWMS: 11 job steps from planning and traffic management to tools, site set-up, working at height and emergency response.

    अलग से भी मिलता है
  54. Port-a-loo Service

    SWMS · काम के 8 चरण

    Covers servicing a port-a-loo: cleaning, pump-out of the sewage tank and adding deodorising chemicals, with the hazards and controls for each job step.

    अलग से भी मिलता है

इसमें क्या-क्या है

इसमें शामिल ख़तरे

इसमें दिए गए कानून और मानक

हर SWMS के साथ कानूनों और कोड ऑफ़ प्रैक्टिस की हमारी संदर्भ सूची आती है।

आपकी बचत

टेम्पलेटकाम के चरणअलग से
Height Access Equipment17$89.95 · 1 क्रेडिट
Internal External Lock-Up Fix Stage Carpentry15$89.95 · 1 क्रेडिट
Painting and Decorating15$89.95 · 1 क्रेडिट
Roof Work14$89.95 · 1 क्रेडिट
Glazing15$89.95 · 1 क्रेडिट
Mobile Plant Working Near-Around8$89.95 · 1 क्रेडिट
Retaining Wall19$89.95 · 1 क्रेडिट
Roof Edge Protection16$89.95 · 1 क्रेडिट
Garage Door Installation14$89.95 · 1 क्रेडिट
Insulation - Batts Installation12$89.95 · 1 क्रेडिट
Erecting Fixed Scaffold14$89.95 · 1 क्रेडिट
Plumbing Drainage18$89.95 · 1 क्रेडिट
Final Building Clean Before Handover to Client10$89.95 · 1 क्रेडिट
Rough-in Final Fit-out Plumbing18$89.95 · 1 क्रेडिट
Timber Floor Laying13$89.95 · 1 क्रेडिट
Skip Bin11$89.95 · 1 क्रेडिट
Concrete Boom or Line Pumping15$89.95 · 1 क्रेडिट
Traffic Corridor - Establishing a Safe Work Zone8$89.95 · 1 क्रेडिट
Construction Labourer16$89.95 · 1 क्रेडिट
Temporary Fencing11$89.95 · 1 क्रेडिट
Plasterboard16$89.95 · 1 क्रेडिट
Decking19$89.95 · 1 क्रेडिट
Brick and Block Laying22$89.95 · 1 क्रेडिट
Concrete Foundations Excavating - Pouring17$89.95 · 1 क्रेडिट
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 क्रेडिट
Fencing16$89.95 · 1 क्रेडिट
Duct Work Installation11$89.95 · 1 क्रेडिट
Working in Roof Spaces8$89.95 · 1 क्रेडिट
Construction Site Visitor7$89.95 · 1 क्रेडिट
Overhead Electric Lines - Working Near6$89.95 · 1 क्रेडिट
Construction OHS/WHS Project Management Plan0$89.95 · 1 क्रेडिट
Earthmoving Equipment23$89.95 · 1 क्रेडिट
Timber Floor Sanding and Finishing14$89.95 · 1 क्रेडिट
Cladding12$89.95 · 1 क्रेडिट
Cabinet Installation12$89.95 · 1 क्रेडिट
Air Conditioning Installation16$89.95 · 1 क्रेडिट
Dogman12$89.95 · 1 क्रेडिट
Rendering14$89.95 · 1 क्रेडिट
Electrical New Installation20$89.95 · 1 क्रेडिट
Powered Non-powered Tools12$89.95 · 1 क्रेडिट
Plumbing Gas Fitting21$89.95 · 1 क्रेडिट
Manual Handling18$89.95 · 1 क्रेडिट
Carpet Laying14$89.95 · 1 क्रेडिट
Tiling14$89.95 · 1 क्रेडिट
Awnings Blinds Curtains Installation14$89.95 · 1 क्रेडिट
Excavation Near Assets13$89.95 · 1 क्रेडिट
Plumbing - Water Meter Installation16$89.95 · 1 क्रेडिट
Concrete Slab on Ground17$89.95 · 1 क्रेडिट
Waterproofing12$89.95 · 1 क्रेडिट
Floating Floor Laying14$89.95 · 1 क्रेडिट
Aluminium Window Door Frame Installation15$89.95 · 1 क्रेडिट
Framing and Trusses - Timber-Steel15$89.95 · 1 क्रेडिट
Site Establishment11$89.95 · 1 क्रेडिट
Port-a-loo Service8$89.95 · 1 क्रेडिट
एक-एक करके ख़रीदने पर$4,857.30 · 54 क्रेडिट
इस पैक में$2,518.60 · 28 क्रेडिट आप $2,338.70 बचाते हैं

रिव्यू

अभी कोई रिव्यू नहीं।

टेम्पलेट कैसे काम करते हैं

आज़माएँ, पैसे देने से पहले।

  1. मुफ़्त प्रीव्यू

    हर टेम्पलेट के काम के चरण, ख़तरे और पहला काम पढ़ने के लिए खुले हैं। साइन अप की ज़रूरत नहीं।

  2. एडिटर आज़माएँ

    कंप्यूटर या अपने फ़ोन पर, एक डेमो SWMS को अपनी कंपनी, जॉब और साइट के हिसाब से ढालें।

  3. मुफ़्त में साइन अप करें

    आपकी जानकारी और लोगो साथ आ जाते हैं। यह टेम्पलेट पहले से भरा हुआ खुलता है।

  4. क्रेडिट इस्तेमाल करें या एक बार ख़रीदें

    पेड प्लान में हर महीने टेम्पलेट क्रेडिट मिलते हैं। या यह टेम्पलेट हमेशा के लिए ख़रीद लें।