अर्ली एक्सेस ऑफ़र:अर्ली एक्सेस: 30% की छूट, जब तक आपकी सदस्यता चलती रहे.

ऑफ़र लें

टेम्पलेट दस्तावेज़ अंग्रेज़ी में लिखे गए हैं।

वैल्यू पैक · 57 टेम्पलेट

Civil Roadworks Combo

वैल्यू पैक · PACK-50331

Civil Roadworks Combo वैल्यू पैक टेम्पलेट का पूर्वावलोकन
  • 57 टेम्पलेट
  • 38 की कीमत में 57
  • लाइब्रेरी के एक फ़ोल्डर में आता है

A set of 40 SWMS, 14 SOPs, one plan and two forms for road construction and maintenance contractors.

The SWMS cover kerb and channel, asphalt, road pavement stabilising, traffic line removal, traffic corridors and soil compaction. The SOPs include Grader, Front-end Loader and Plant Attachment Maintenance. It also includes Excavation Collapse Emergency Response Plan, Plant Risk Assessment Form and Excavation Safety Inspection Checklist.

Each document is the same one sold on its own, so you get every update to it. Together they cost 38 template credits instead of 57.

Driver Posture & Responsibilities SOP का प्रीव्यू

Driver Posture & Responsibilities

SOPVersion 4

Acronyms

  • PPE - Personal Protective Equipment

  • SOP - Safe Operating Procedure

8 और सेक्शन

  1. Hazards
  2. Pre-operational inspection
  3. Precautions
  4. Driver responsibility
  5. Vehicle ergonomic principles
  6. और 3 और

पूरा लिखा हुआ, आपके कारोबार की जानकारी के लिए तैयार।

ऐसे प्रीव्यू करें

ब्राउज़र में यह कैसा दिखता है

यह वैल्यू पैक पाएँ

मुफ़्त में साइन अप करें, फिर चुनें कि आप इसे कैसे लेना चाहते हैं। हर दस्तावेज़ आपकी लाइब्रेरी में, पैक के नाम वाले फ़ोल्डर में जाता है।

  • पेड प्लान में शामिल

    अपने प्लान के टेम्पलेट क्रेडिट इस्तेमाल करें। इस पैक की कीमत 57 के बजाय 38 है।

    प्लान और कीमतों की तुलना करें
  • एक बार ख़रीदें

    $3,418.10 $5,127.15 एक बार का भुगतान, और यह हमेशा आपका रहेगा। मुफ़्त प्लान पर भी चलता है।

साइन अप के लिए कार्ड नहीं चाहिए। अर्ली एक्सेस सदस्यों को किसी भी प्लान पर 30% की छूट मिलती है।

क्या-क्या शामिल है

  1. Driver Posture & Responsibilities

    SOP · 9 सेक्शन

    Safe operating procedure for driver posture and responsibilities: hazards, ergonomics, fuelling, accident procedure and a vehicle pre-operational checklist.

    अलग से भी मिलता है
  2. Soil Testing

    SWMS · काम के 11 चरण

    Soil Testing SWMS: 11 job steps from remote travel and set-up to soil testing, mobile plant, completion and emergency response.

    अलग से भी मिलता है
  3. Bollard Speed Bump Tactile Paving

    SWMS · काम के 15 चरण

    SWMS for installing bollards, speed bumps and tactile paving at crossings, pedestrian islands, vehicle crossovers, railway platforms and car parks.

    अलग से भी मिलता है
  4. Mobile Plant Working Near-Around

    SWMS · काम के 8 चरण

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    अलग से भी मिलता है
  5. Scraper-Dozer-Grader

    SWMS · काम के 20 चरण

    SWMS for scraper, dozer and grader work: site set-up, machine operation, slopes, power lines, underground services, refuelling and emergencies.

    अलग से भी मिलता है
  6. Handheld Power Tools

    SOP · 9 सेक्शन

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    अलग से भी मिलता है
  7. Spotter

    SWMS · काम के 11 चरण

    SWMS for spotters and safety observers: traffic and mobile plant, work near overhead and underground assets, scaffolding and EWPs, roll-over and first aid.

    अलग से भी मिलता है
  8. Plant Risk Assessment Form

    फ़ॉर्म · 25 फ़ील्ड

    Identify the hazards of an item of plant, score the risk with a risk matrix, and tick the control measures in place, with reviews and approval.

    अलग से भी मिलता है
  9. Bulk Excavations

    SWMS · काम के 13 चरण

    SWMS for bulk excavation work: planning, plant operation, shoring, water-charged ground, silica dust, re-fuelling, environmental controls and emergencies.

    अलग से भी मिलता है
  10. Concrete Kerb - Channel

    SWMS · काम के 16 चरण

    SWMS for installing extruded concrete kerb and channel: site set-up, traffic, plant delivery, subgrade, extrusion, wet cement, refuelling and emergencies.

    अलग से भी मिलता है
  11. Trench Excavation

    SWMS · काम के 15 चरण

    Trench Excavation SWMS: 15 job steps covering excavating and working in trenches over 1.5 m deep, from planning to emergency response.

    अलग से भी मिलता है
  12. Grader

    SOP · 7 सेक्शन

    Safe operating procedure for a grader: hazards, PPE, training, maintenance, step-by-step operation and a hazard checklist.

    अलग से भी मिलता है
  13. Front-end Loader

    SOP · 7 सेक्शन

    Safe operating procedure for a front-end loader: hazards, precautions, operation, maintenance and a hazard checklist for powered mobile machinery.

    अलग से भी मिलता है
  14. Asphalt Paver

    SWMS · काम के 13 चरण

    Asphalt Paver SWMS: 13 job steps covering hot mix paving, delivery and crane lifting, hot mix and fuel hazards, overhead lines, traffic and emergencies.

    अलग से भी मिलता है
  15. Traffic Corridor - Establishing a Safe Work Zone

    SWMS · काम के 8 चरण

    Traffic corridor SWMS: 8 job steps covering the traffic management plan, safe work zone set-up, traffic controllers, pedestrians and zone takeouts.

    अलग से भी मिलता है
  16. Plant Attachment Maintenance

    SOP · 10 सेक्शन

    Safe operating procedure for plant attachment maintenance: hazards, PPE, training, isolation under LOTO, and cleaning, welding and hydraulics safety.

    अलग से भी मिलता है
  17. Civil Shoulder Grading

    SWMS · काम के 17 चरण

    SWMS for road shoulder grading with a grader, water cart and roller: float transport, traffic, dust control, gravel, compaction, refuelling and emergencies.

    अलग से भी मिलता है
  18. Manual Handling

    SOP · 5 सेक्शन

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    अलग से भी मिलता है
  19. Civil Road Base and Seal

    SWMS · काम के 18 चरण

    Civil road base and seal SWMS covering 18 job steps, from site set-up and machinery delivery to compaction, sealing, fuelling and emergencies.

    अलग से भी मिलता है
  20. Confined Space Work

    SWMS · काम के 10 चरण

    A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.

    अलग से भी मिलता है
  21. Lasers

    SWMS · काम के 9 चरण

    Lasers SWMS: 9 job steps covering Class 1, 2 and 3R construction lasers, beam set-up, eye injury, mobile plant, roadside work and emergencies.

    अलग से भी मिलता है
  22. Sediment Fencing

    SWMS · काम के 18 चरण

    SWMS for installing sediment and safety fencing: machine set-up, wire straining, nail and staple guns, refuelling and emergency response.

    अलग से भी मिलता है
  23. Guided Boring Pipe Jacking Works

    SWMS · काम के 17 चरण

    A SWMS for guided boring and pipe jacking works: the hazards and controls for excavating launch and retrieval pits, hoisting and running the machine.

    अलग से भी मिलता है
  24. Water Cart

    SWMS · काम के 14 चरण

    SWMS for diesel or petrol water cart work: travel, filling from a hydrant, dust suppression, working near plant, refuelling and emergencies.

    अलग से भी मिलता है
  25. Silica Dust

    SWMS · काम के 14 चरण

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    अलग से भी मिलता है
  26. Surveyor

    SWMS · काम के 14 चरण

    Surveyor SWMS: 14 job steps covering laser operation, rail, road and water work, remote and public areas, mobile plant and emergency response.

    अलग से भी मिलता है
  27. Stabilising Road Pavement

    SWMS · काम के 16 चरण

    SWMS for stabilising a road pavement: planning, set-up near roads, machinery, dust control, cement and lime spreading, grading, fuelling and emergencies.

    अलग से भी मिलता है
  28. Line Marking

    SWMS · काम के 13 चरण

    Line Marking SWMS: 13 job steps for airless line marking on concrete and bitumen, covering traffic, paint, fuel, plant and emergencies.

    अलग से भी मिलता है
  29. Trailer Mounted Hydro Excavator

    SWMS · काम के 20 चरण

    Trailer mounted hydro excavator SWMS: 20 job steps from coupling the trailer to hydro jetting, vacuum operation, unloading and emergencies.

    अलग से भी मिलता है
  30. Backhoe Loader

    SOP · 9 सेक्शन

    A safe operating procedure for backhoe loaders: hazards, PPE, clearances, operation steps, maintenance and a hazard checklist.

    अलग से भी मिलता है
  31. Construction Night Works

    SWMS · काम के 4 चरण

    SWMS for general construction work at night: planning, work area set-up, night works and emergency response, with lighting, plant and fatigue controls.

    अलग से भी मिलता है
  32. Hand Tools

    SOP · 9 सेक्शन

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    अलग से भी मिलता है
  33. Asphalt Patcher

    SOP · 7 सेक्शन

    Safe operating procedure for an asphalt patcher: hazards, PPE, training, maintenance, step-by-step operation and a hazard checklist.

    अलग से भी मिलता है
  34. Earthmoving Equipment

    SWMS · काम के 23 चरण

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    अलग से भी मिलता है
  35. Falls from Heavy Vehicles

    SOP · 7 सेक्शन

    Safe operating procedure to prevent falls from heavy vehicles: worker training, maintenance, cab access, trailers and a training register.

    अलग से भी मिलता है
  36. Roller Operation

    SWMS · काम के 17 चरण

    Roller Operation SWMS: 17 job steps covering drum and multi-wheel rollers on roadworks, from site set-up and power lines to maintenance and emergencies.

    अलग से भी मिलता है
  37. Nuclear Densometer

    SWMS · काम के 12 चरण

    Nuclear Densometer SWMS: 12 job steps covering storage, transport, radiation exposure, mobile plant, trenches and emergencies.

    अलग से भी मिलता है
  38. Excavation Collapse Emergency Response Plan

    मैनेजमेंट प्लान · 4 सेक्शन

    A seven-step emergency response plan for trench and excavation collapses, with site details, emergency contacts and a rescue equipment checklist.

    अलग से भी मिलता है
  39. Outdoor Work

    SOP · 11 सेक्शन

    Safe operating procedure for outdoor work: hazards, PPE, hot and cold conditions, poisonous plants, animals, first aid and a training register.

    अलग से भी मिलता है
  40. Skid Steer

    SOP · 9 सेक्शन

    Safe operating procedure for a skid steer: hazards, PPE, precautions, step-by-step operation, fuelling, maintenance and a hazard checklist.

    अलग से भी मिलता है
  41. Asphalt Concrete Road Application and Repairs

    SWMS · काम के 18 चरण

    SWMS for asphalt and concrete road application and repairs: site set-up, traffic, power lines, cutting, applying material, fuelling and emergencies.

    अलग से भी मिलता है
  42. Manual Handling

    SWMS · काम के 18 चरण

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    अलग से भी मिलता है
  43. Excavator

    SOP · 9 सेक्शन

    Safe operating procedure for an excavator: hazards, PPE, licensing, clearances, maintenance, step-by-step operation and a hazard checklist.

    अलग से भी मिलता है
  44. Road Safety Barrier Installation

    SWMS · काम के 21 चरण

    Safe work method statement for installing road safety barriers: 21 job steps from planning and traffic control to post driving, silica dust and emergencies.

    अलग से भी मिलता है
  45. Horizontal Directional Boring

    SWMS · काम के 16 चरण

    SWMS for horizontal directional boring: locating underground services, drilling, service strikes, rig maintenance, refuelling and emergencies.

    अलग से भी मिलता है
  46. Road Profiler Machine

    SWMS · काम के 23 चरण

    Road Profiler Machine SWMS: 23 job steps covering silica dust, mobile plant, power lines, underground services, roadside work and emergencies.

    अलग से भी मिलता है
  47. Site Mobilisation

    SWMS · काम के 13 चरण

    Site Mobilisation SWMS: 13 job steps for packing, transporting and unloading shipping containers by road vehicle, covering mobile plant, power lines and fuelling.

    अलग से भी मिलता है
  48. Traffic Line Removal

    SWMS · काम के 16 चरण

    Traffic Line Removal SWMS: 16 job steps covering the hazards and controls for removing traffic line markings with mobile plant.

    अलग से भी मिलता है
  49. Tipper and Dog

    SWMS · काम के 16 चरण

    Hazards and controls for operating a tip truck and dog trailer, including side tippers, from coupling trailers to tipping, refuelling and emergency response.

    अलग से भी मिलता है
  50. Excavation Near Assets

    SWMS · काम के 13 चरण

    SWMS for excavating near underground services and assets: site planning, survey, work area set-up, contact with utilities and emergency response.

    अलग से भी मिलता है
  51. Excavation Safety Inspection Checklist

    फ़ॉर्म · 22 फ़ील्ड

    A checklist for inspecting excavation and trenching work: soil, utilities, protective systems, access, atmosphere, water and emergency response.

    अलग से भी मिलता है
  52. Roller

    SOP · 8 सेक्शन

    Safe operating procedure for a roller: hazards, PPE, precautions, transporting, maintenance, step-by-step operation and a hazard checklist.

    अलग से भी मिलता है
  53. Hydro Seeding

    SWMS · काम के 12 चरण

    A SWMS for hydro seeding: the hazards and controls for spreading seed, fertilisers and agricultural chemicals to prepared seedbeds with a hydroseeder.

    अलग से भी मिलता है
  54. Light Vehicle on Construction

    SWMS · काम के 16 चरण

    Light Vehicle on Construction SWMS: 16 job steps covering travel, loading, fuelling, breakdowns, accidents, mobile plant and emergencies.

    अलग से भी मिलता है
  55. Soil Compactor

    SWMS · काम के 19 चरण

    SWMS for soil compactor work: weather, site set-up, overhead lines, slopes, silica dust, refuelling, ground workers and emergency response.

    अलग से भी मिलता है
  56. Site Establishment

    SWMS · काम के 11 चरण

    Site Establishment SWMS: 11 job steps from planning and traffic management to tools, site set-up, working at height and emergency response.

    अलग से भी मिलता है
  57. Hot Asphalt Truck

    SWMS · काम के 11 चरण

    Covers operating a hot asphalt truck for road paving, with the risks and controls for each job step from travel to emergency response.

    अलग से भी मिलता है

इसमें क्या-क्या है

इसमें शामिल ख़तरे

इसमें दिए गए कानून और मानक

हर SWMS के साथ कानूनों और कोड ऑफ़ प्रैक्टिस की हमारी संदर्भ सूची आती है।

आपकी बचत

टेम्पलेटकाम के चरणअलग से
Driver Posture & Responsibilities0$89.95 · 1 क्रेडिट
Soil Testing11$89.95 · 1 क्रेडिट
Bollard Speed Bump Tactile Paving15$89.95 · 1 क्रेडिट
Mobile Plant Working Near-Around8$89.95 · 1 क्रेडिट
Scraper-Dozer-Grader20$89.95 · 1 क्रेडिट
Handheld Power Tools0$89.95 · 1 क्रेडिट
Spotter11$89.95 · 1 क्रेडिट
Plant Risk Assessment Form0$89.95 · 1 क्रेडिट
Bulk Excavations13$89.95 · 1 क्रेडिट
Concrete Kerb - Channel16$89.95 · 1 क्रेडिट
Trench Excavation15$89.95 · 1 क्रेडिट
Grader0$89.95 · 1 क्रेडिट
Front-end Loader0$89.95 · 1 क्रेडिट
Asphalt Paver13$89.95 · 1 क्रेडिट
Traffic Corridor - Establishing a Safe Work Zone8$89.95 · 1 क्रेडिट
Plant Attachment Maintenance0$89.95 · 1 क्रेडिट
Civil Shoulder Grading17$89.95 · 1 क्रेडिट
Manual Handling0$89.95 · 1 क्रेडिट
Civil Road Base and Seal18$89.95 · 1 क्रेडिट
Confined Space Work10$89.95 · 1 क्रेडिट
Lasers9$89.95 · 1 क्रेडिट
Sediment Fencing18$89.95 · 1 क्रेडिट
Guided Boring Pipe Jacking Works17$89.95 · 1 क्रेडिट
Water Cart14$89.95 · 1 क्रेडिट
Silica Dust14$89.95 · 1 क्रेडिट
Surveyor14$89.95 · 1 क्रेडिट
Stabilising Road Pavement16$89.95 · 1 क्रेडिट
Line Marking13$89.95 · 1 क्रेडिट
Trailer Mounted Hydro Excavator20$89.95 · 1 क्रेडिट
Backhoe Loader0$89.95 · 1 क्रेडिट
Construction Night Works4$89.95 · 1 क्रेडिट
Hand Tools0$89.95 · 1 क्रेडिट
Asphalt Patcher0$89.95 · 1 क्रेडिट
Earthmoving Equipment23$89.95 · 1 क्रेडिट
Falls from Heavy Vehicles0$89.95 · 1 क्रेडिट
Roller Operation17$89.95 · 1 क्रेडिट
Nuclear Densometer12$89.95 · 1 क्रेडिट
Excavation Collapse Emergency Response Plan0$89.95 · 1 क्रेडिट
Outdoor Work0$89.95 · 1 क्रेडिट
Skid Steer0$89.95 · 1 क्रेडिट
Asphalt Concrete Road Application and Repairs18$89.95 · 1 क्रेडिट
Manual Handling18$89.95 · 1 क्रेडिट
Excavator0$89.95 · 1 क्रेडिट
Road Safety Barrier Installation21$89.95 · 1 क्रेडिट
Horizontal Directional Boring16$89.95 · 1 क्रेडिट
Road Profiler Machine23$89.95 · 1 क्रेडिट
Site Mobilisation13$89.95 · 1 क्रेडिट
Traffic Line Removal16$89.95 · 1 क्रेडिट
Tipper and Dog16$89.95 · 1 क्रेडिट
Excavation Near Assets13$89.95 · 1 क्रेडिट
Excavation Safety Inspection Checklist0$89.95 · 1 क्रेडिट
Roller0$89.95 · 1 क्रेडिट
Hydro Seeding12$89.95 · 1 क्रेडिट
Light Vehicle on Construction16$89.95 · 1 क्रेडिट
Soil Compactor19$89.95 · 1 क्रेडिट
Site Establishment11$89.95 · 1 क्रेडिट
Hot Asphalt Truck11$89.95 · 1 क्रेडिट
एक-एक करके ख़रीदने पर$5,127.15 · 57 क्रेडिट
इस पैक में$3,418.10 · 38 क्रेडिट आप $1,709.05 बचाते हैं

रिव्यू

अभी कोई रिव्यू नहीं।

टेम्पलेट कैसे काम करते हैं

आज़माएँ, पैसे देने से पहले।

  1. मुफ़्त प्रीव्यू

    हर टेम्पलेट के काम के चरण, ख़तरे और पहला काम पढ़ने के लिए खुले हैं। साइन अप की ज़रूरत नहीं।

  2. एडिटर आज़माएँ

    कंप्यूटर या अपने फ़ोन पर, एक डेमो SWMS को अपनी कंपनी, जॉब और साइट के हिसाब से ढालें।

  3. मुफ़्त में साइन अप करें

    आपकी जानकारी और लोगो साथ आ जाते हैं। यह टेम्पलेट पहले से भरा हुआ खुलता है।

  4. क्रेडिट इस्तेमाल करें या एक बार ख़रीदें

    पेड प्लान में हर महीने टेम्पलेट क्रेडिट मिलते हैं। या यह टेम्पलेट हमेशा के लिए ख़रीद लें।