वैल्यू पैक · 40 टेम्पलेट

Civil Roadworks

वैल्यू पैक · PACK-50316

Civil Roadworks वैल्यू पैक टेम्पलेट का पूर्वावलोकन
  • 40 टेम्पलेट
  • 26 की कीमत में 40
  • लाइब्रेरी के एक फ़ोल्डर में आता है

A set of 40 SWMS for road construction and maintenance contractors: kerb and channel, asphalt, road pavement stabilising, traffic line removal, traffic corridors and soil compaction.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost 26 template credits instead of 40.

Tipper and Dog SWMS का प्रीव्यू

Tipper and Dog

SWMSVersion 14
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Energised ElectricalWork on or near energised electrical installations or services
  • Traffic CorridorsWork on, in or adjacent to a road, railway, shipping lane or other traffic corridor in use by traffic other than pedestrians
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (How to Manage Work Health and Safety Risks) Code of Practice 2015
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (How to Manage Work Health and Safety Risks Code of Practice) Approval 2025
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2025
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • How to manage work health and safety risks code of practice 2019
  • Managing the work environment and facilities code of practice 2019
  • Construction work code of practice 2019

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • How to manage work health and safety risks - Code of practice 2026
  • Managing the work environment and facilities - Code of practice 2026
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • How to Manage Work Health and Safety Risks: Code of practice 2020
  • Managing the Work Environment and Facilities: Code of practice 2020
  • Construction work Code of Practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • How to Manage Work Health and Safety Risks - Code of practice 2024
  • Managing the Work Environment and Facilities - Code of practice 2024
  • Construction Work - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • How to manage work health and safety risks – Code of practice 2022
  • Managing the work environment and facilities – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Seat Belt

Job steps, hazards and controls

  • Work activity

    Check weather conditions & prepare

    • Hazard

      Extreme weather

      Before controls3 High
      Controls
      • Check weather conditions – do not work in extreme conditions

      • Reschedule works to work in more moderate temperatures.

      After controls2 Moderate
      Responsible
      • SupervisorMaintain awareness of weather conditions
      • OperatorFollow controls
    • Hazard

      Hyperthermia

      Hypothermia

      Before controls3 High
      Controls
      • Ensure vehicle cabin is air-conditioned

      • Workers trained to recognise the symptoms of hyperthermia and hypothermia

      • Hot conditions. Ensure:

        • Suitable protective clothing

        • Sun brim on hard hats

        • Safety glasses - UV rated

        • Use 30+ sunscreen on exposed skin

        • Adequate drinking water

        • Access to shade on breaks

        • Adequate breaks.

      • Cold conditions. Ensure:

        • Schedule warm-up breaks

        • Hold breaks inside

        • Dress warmly in layers

        • Stay dry (wet clothing chills the body rapidly)

        • Workers must get out of the cold as soon as they can if starting to feel symptoms

        • Alcohol, cigarettes, caffeine and certain medications increase susceptibility to cold.

      After controls2 Moderate
      Responsible
      • SupervisorMaintain awareness of weather conditions
      • OperatorFollow controls

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

काम के 15 और चरण, Working alone से Emergency response तक

हर एक में उसके ख़तरे, जोखिम रेटिंग और नियंत्रण, और साथ में आपके क्रू का साइन-ऑन।

ऐसे प्रीव्यू करें

ब्राउज़र में यह कैसा दिखता है

यह वैल्यू पैक पाएँ

मुफ़्त में साइन अप करें, फिर चुनें कि आप इसे कैसे लेना चाहते हैं। हर दस्तावेज़ आपकी लाइब्रेरी में, पैक के नाम वाले फ़ोल्डर में जाता है।

  • पेड प्लान में शामिल

    अपने प्लान के टेम्पलेट क्रेडिट इस्तेमाल करें। इस पैक की कीमत 40 के बजाय 26 है।

    प्लान और कीमतों की तुलना करें
  • एक बार ख़रीदें

    $2,338.70 $3,598.00 एक बार का भुगतान, और यह हमेशा आपका रहेगा। मुफ़्त प्लान पर भी चलता है।

साइन अप के लिए कार्ड नहीं चाहिए। अर्ली एक्सेस सदस्यों को किसी भी प्लान पर 30% की छूट मिलती है।

क्या-क्या शामिल है

  1. Tipper and Dog

    SWMS · काम के 16 चरण

    Hazards and controls for operating a tip truck and dog trailer, including side tippers, from coupling trailers to tipping, refuelling and emergency response.

    अलग से भी मिलता है
  2. Concrete Kerb - Channel

    SWMS · काम के 16 चरण

    SWMS for installing extruded concrete kerb and channel: site set-up, traffic, plant delivery, subgrade, extrusion, wet cement, refuelling and emergencies.

    अलग से भी मिलता है
  3. Traffic Line Removal

    SWMS · काम के 16 चरण

    Traffic Line Removal SWMS: 16 job steps covering the hazards and controls for removing traffic line markings with mobile plant.

    अलग से भी मिलता है
  4. Earthmoving Equipment

    SWMS · काम के 23 चरण

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    अलग से भी मिलता है
  5. Traffic Corridor - Establishing a Safe Work Zone

    SWMS · काम के 8 चरण

    Traffic corridor SWMS: 8 job steps covering the traffic management plan, safe work zone set-up, traffic controllers, pedestrians and zone takeouts.

    अलग से भी मिलता है
  6. Stabilising Road Pavement

    SWMS · काम के 16 चरण

    SWMS for stabilising a road pavement: planning, set-up near roads, machinery, dust control, cement and lime spreading, grading, fuelling and emergencies.

    अलग से भी मिलता है
  7. Hot Asphalt Truck

    SWMS · काम के 11 चरण

    Covers operating a hot asphalt truck for road paving, with the risks and controls for each job step from travel to emergency response.

    अलग से भी मिलता है
  8. Hydro Seeding

    SWMS · काम के 12 चरण

    A SWMS for hydro seeding: the hazards and controls for spreading seed, fertilisers and agricultural chemicals to prepared seedbeds with a hydroseeder.

    अलग से भी मिलता है
  9. Site Mobilisation

    SWMS · काम के 13 चरण

    Site Mobilisation SWMS: 13 job steps for packing, transporting and unloading shipping containers by road vehicle, covering mobile plant, power lines and fuelling.

    अलग से भी मिलता है
  10. Surveyor

    SWMS · काम के 14 चरण

    Surveyor SWMS: 14 job steps covering laser operation, rail, road and water work, remote and public areas, mobile plant and emergency response.

    अलग से भी मिलता है
  11. Soil Compactor

    SWMS · काम के 19 चरण

    SWMS for soil compactor work: weather, site set-up, overhead lines, slopes, silica dust, refuelling, ground workers and emergency response.

    अलग से भी मिलता है
  12. Water Cart

    SWMS · काम के 14 चरण

    SWMS for diesel or petrol water cart work: travel, filling from a hydrant, dust suppression, working near plant, refuelling and emergencies.

    अलग से भी मिलता है
  13. Soil Testing

    SWMS · काम के 11 चरण

    Soil Testing SWMS: 11 job steps from remote travel and set-up to soil testing, mobile plant, completion and emergency response.

    अलग से भी मिलता है
  14. Asphalt Concrete Road Application and Repairs

    SWMS · काम के 18 चरण

    SWMS for asphalt and concrete road application and repairs: site set-up, traffic, power lines, cutting, applying material, fuelling and emergencies.

    अलग से भी मिलता है
  15. Trench Excavation

    SWMS · काम के 15 चरण

    Trench Excavation SWMS: 15 job steps covering excavating and working in trenches over 1.5 m deep, from planning to emergency response.

    अलग से भी मिलता है
  16. Silica Dust

    SWMS · काम के 14 चरण

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    अलग से भी मिलता है
  17. Trailer Mounted Hydro Excavator

    SWMS · काम के 20 चरण

    Trailer mounted hydro excavator SWMS: 20 job steps from coupling the trailer to hydro jetting, vacuum operation, unloading and emergencies.

    अलग से भी मिलता है
  18. Road Profiler Machine

    SWMS · काम के 23 चरण

    Road Profiler Machine SWMS: 23 job steps covering silica dust, mobile plant, power lines, underground services, roadside work and emergencies.

    अलग से भी मिलता है
  19. Road Safety Barrier Installation

    SWMS · काम के 21 चरण

    Safe work method statement for installing road safety barriers: 21 job steps from planning and traffic control to post driving, silica dust and emergencies.

    अलग से भी मिलता है
  20. Roller Operation

    SWMS · काम के 17 चरण

    Roller Operation SWMS: 17 job steps covering drum and multi-wheel rollers on roadworks, from site set-up and power lines to maintenance and emergencies.

    अलग से भी मिलता है
  21. Mobile Plant Working Near-Around

    SWMS · काम के 8 चरण

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    अलग से भी मिलता है
  22. Civil Shoulder Grading

    SWMS · काम के 17 चरण

    SWMS for road shoulder grading with a grader, water cart and roller: float transport, traffic, dust control, gravel, compaction, refuelling and emergencies.

    अलग से भी मिलता है
  23. Bollard Speed Bump Tactile Paving

    SWMS · काम के 15 चरण

    SWMS for installing bollards, speed bumps and tactile paving at crossings, pedestrian islands, vehicle crossovers, railway platforms and car parks.

    अलग से भी मिलता है
  24. Scraper-Dozer-Grader

    SWMS · काम के 20 चरण

    SWMS for scraper, dozer and grader work: site set-up, machine operation, slopes, power lines, underground services, refuelling and emergencies.

    अलग से भी मिलता है
  25. Asphalt Paver

    SWMS · काम के 13 चरण

    Asphalt Paver SWMS: 13 job steps covering hot mix paving, delivery and crane lifting, hot mix and fuel hazards, overhead lines, traffic and emergencies.

    अलग से भी मिलता है
  26. Spotter

    SWMS · काम के 11 चरण

    SWMS for spotters and safety observers: traffic and mobile plant, work near overhead and underground assets, scaffolding and EWPs, roll-over and first aid.

    अलग से भी मिलता है
  27. Nuclear Densometer

    SWMS · काम के 12 चरण

    Nuclear Densometer SWMS: 12 job steps covering storage, transport, radiation exposure, mobile plant, trenches and emergencies.

    अलग से भी मिलता है
  28. Lasers

    SWMS · काम के 9 चरण

    Lasers SWMS: 9 job steps covering Class 1, 2 and 3R construction lasers, beam set-up, eye injury, mobile plant, roadside work and emergencies.

    अलग से भी मिलता है
  29. Horizontal Directional Boring

    SWMS · काम के 16 चरण

    SWMS for horizontal directional boring: locating underground services, drilling, service strikes, rig maintenance, refuelling and emergencies.

    अलग से भी मिलता है
  30. Sediment Fencing

    SWMS · काम के 18 चरण

    SWMS for installing sediment and safety fencing: machine set-up, wire straining, nail and staple guns, refuelling and emergency response.

    अलग से भी मिलता है
  31. Line Marking

    SWMS · काम के 13 चरण

    Line Marking SWMS: 13 job steps for airless line marking on concrete and bitumen, covering traffic, paint, fuel, plant and emergencies.

    अलग से भी मिलता है
  32. Civil Road Base and Seal

    SWMS · काम के 18 चरण

    Civil road base and seal SWMS covering 18 job steps, from site set-up and machinery delivery to compaction, sealing, fuelling and emergencies.

    अलग से भी मिलता है
  33. Construction Night Works

    SWMS · काम के 4 चरण

    SWMS for general construction work at night: planning, work area set-up, night works and emergency response, with lighting, plant and fatigue controls.

    अलग से भी मिलता है
  34. Light Vehicle on Construction

    SWMS · काम के 16 चरण

    Light Vehicle on Construction SWMS: 16 job steps covering travel, loading, fuelling, breakdowns, accidents, mobile plant and emergencies.

    अलग से भी मिलता है
  35. Site Establishment

    SWMS · काम के 11 चरण

    Site Establishment SWMS: 11 job steps from planning and traffic management to tools, site set-up, working at height and emergency response.

    अलग से भी मिलता है
  36. Guided Boring Pipe Jacking Works

    SWMS · काम के 17 चरण

    A SWMS for guided boring and pipe jacking works: the hazards and controls for excavating launch and retrieval pits, hoisting and running the machine.

    अलग से भी मिलता है
  37. Excavation Near Assets

    SWMS · काम के 13 चरण

    SWMS for excavating near underground services and assets: site planning, survey, work area set-up, contact with utilities and emergency response.

    अलग से भी मिलता है
  38. Manual Handling

    SWMS · काम के 18 चरण

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    अलग से भी मिलता है
  39. Confined Space Work

    SWMS · काम के 10 चरण

    A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.

    अलग से भी मिलता है
  40. Bulk Excavations

    SWMS · काम के 13 चरण

    SWMS for bulk excavation work: planning, plant operation, shoring, water-charged ground, silica dust, re-fuelling, environmental controls and emergencies.

    अलग से भी मिलता है

इसमें क्या-क्या है

इसमें शामिल ख़तरे

इसमें दिए गए कानून और मानक

हर SWMS के साथ कानूनों और कोड ऑफ़ प्रैक्टिस की हमारी संदर्भ सूची आती है।

आपकी बचत

टेम्पलेटकाम के चरणअलग से
Tipper and Dog16$89.95 · 1 क्रेडिट
Concrete Kerb - Channel16$89.95 · 1 क्रेडिट
Traffic Line Removal16$89.95 · 1 क्रेडिट
Earthmoving Equipment23$89.95 · 1 क्रेडिट
Traffic Corridor - Establishing a Safe Work Zone8$89.95 · 1 क्रेडिट
Stabilising Road Pavement16$89.95 · 1 क्रेडिट
Hot Asphalt Truck11$89.95 · 1 क्रेडिट
Hydro Seeding12$89.95 · 1 क्रेडिट
Site Mobilisation13$89.95 · 1 क्रेडिट
Surveyor14$89.95 · 1 क्रेडिट
Soil Compactor19$89.95 · 1 क्रेडिट
Water Cart14$89.95 · 1 क्रेडिट
Soil Testing11$89.95 · 1 क्रेडिट
Asphalt Concrete Road Application and Repairs18$89.95 · 1 क्रेडिट
Trench Excavation15$89.95 · 1 क्रेडिट
Silica Dust14$89.95 · 1 क्रेडिट
Trailer Mounted Hydro Excavator20$89.95 · 1 क्रेडिट
Road Profiler Machine23$89.95 · 1 क्रेडिट
Road Safety Barrier Installation21$89.95 · 1 क्रेडिट
Roller Operation17$89.95 · 1 क्रेडिट
Mobile Plant Working Near-Around8$89.95 · 1 क्रेडिट
Civil Shoulder Grading17$89.95 · 1 क्रेडिट
Bollard Speed Bump Tactile Paving15$89.95 · 1 क्रेडिट
Scraper-Dozer-Grader20$89.95 · 1 क्रेडिट
Asphalt Paver13$89.95 · 1 क्रेडिट
Spotter11$89.95 · 1 क्रेडिट
Nuclear Densometer12$89.95 · 1 क्रेडिट
Lasers9$89.95 · 1 क्रेडिट
Horizontal Directional Boring16$89.95 · 1 क्रेडिट
Sediment Fencing18$89.95 · 1 क्रेडिट
Line Marking13$89.95 · 1 क्रेडिट
Civil Road Base and Seal18$89.95 · 1 क्रेडिट
Construction Night Works4$89.95 · 1 क्रेडिट
Light Vehicle on Construction16$89.95 · 1 क्रेडिट
Site Establishment11$89.95 · 1 क्रेडिट
Guided Boring Pipe Jacking Works17$89.95 · 1 क्रेडिट
Excavation Near Assets13$89.95 · 1 क्रेडिट
Manual Handling18$89.95 · 1 क्रेडिट
Confined Space Work10$89.95 · 1 क्रेडिट
Bulk Excavations13$89.95 · 1 क्रेडिट
एक-एक करके ख़रीदने पर$3,598.00 · 40 क्रेडिट
इस पैक में$2,338.70 · 26 क्रेडिट आप $1,259.30 बचाते हैं

रिव्यू

अभी कोई रिव्यू नहीं।

टेम्पलेट कैसे काम करते हैं

आज़माएँ, पैसे देने से पहले।

  1. मुफ़्त प्रीव्यू

    हर टेम्पलेट के काम के चरण, ख़तरे और पहला काम पढ़ने के लिए खुले हैं। साइन अप की ज़रूरत नहीं।

  2. एडिटर आज़माएँ

    कंप्यूटर या अपने फ़ोन पर, एक डेमो SWMS को अपनी कंपनी, जॉब और साइट के हिसाब से ढालें।

  3. मुफ़्त में साइन अप करें

    आपकी जानकारी और लोगो साथ आ जाते हैं। यह टेम्पलेट पहले से भरा हुआ खुलता है।

  4. क्रेडिट इस्तेमाल करें या एक बार ख़रीदें

    पेड प्लान में हर महीने टेम्पलेट क्रेडिट मिलते हैं। या यह टेम्पलेट हमेशा के लिए ख़रीद लें।