अर्ली एक्सेस ऑफ़र:अर्ली एक्सेस: 30% की छूट, जब तक आपकी सदस्यता चलती रहे.

ऑफ़र लें

टेम्पलेट दस्तावेज़ अंग्रेज़ी में लिखे गए हैं।

वैल्यू पैक · 20 टेम्पलेट

Painting and Decorating Combo

वैल्यू पैक · PACK-50344

Painting and Decorating Combo वैल्यू पैक टेम्पलेट का पूर्वावलोकन
  • 20 टेम्पलेट
  • 15 की कीमत में 20
  • लाइब्रेरी के एक फ़ोल्डर में आता है

A set of ten SWMS, nine SOPs and one plan for painters and decorators.

The SWMS cover painting and decorating, lead paint removal, high pressure water cleaning, hazardous chemicals, roof work and asbestos awareness. The SOPs include Mobile Scaffolding, Extension Ladder and Handheld Power Tools. It also includes Falls Emergency Rescue Plan.

Each document is the same one sold on its own, so you get every update to it. Together they cost 15 template credits instead of 20.

Asbestos Awareness SWMS का प्रीव्यू

Asbestos Awareness

SWMSVersion 2
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW – identified in the Job Task column)

  • AsbestosAsbestos disturbance
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Planning and preparation

Planning / preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

Hold points identified and signed off before continuing work. Specify?

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Ensure site-specific induction undertaken

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures unanticipated hazards.

      After controls2 Moderate
      Responsible
      • Supervisorto check the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

काम के 3 और चरण, Assess for the presence of asbestos से Emergency response तक

हर एक में उसके ख़तरे, जोखिम रेटिंग और नियंत्रण, और साथ में आपके क्रू का साइन-ऑन।

ऐसे प्रीव्यू करें

ब्राउज़र में यह कैसा दिखता है

यह वैल्यू पैक पाएँ

मुफ़्त में साइन अप करें, फिर चुनें कि आप इसे कैसे लेना चाहते हैं। हर दस्तावेज़ आपकी लाइब्रेरी में, पैक के नाम वाले फ़ोल्डर में जाता है।

  • पेड प्लान में शामिल

    अपने प्लान के टेम्पलेट क्रेडिट इस्तेमाल करें। इस पैक की कीमत 20 के बजाय 15 है।

    प्लान और कीमतों की तुलना करें
  • एक बार ख़रीदें

    $1,349.25 $1,799.00 एक बार का भुगतान, और यह हमेशा आपका रहेगा। मुफ़्त प्लान पर भी चलता है।

साइन अप के लिए कार्ड नहीं चाहिए। अर्ली एक्सेस सदस्यों को किसी भी प्लान पर 30% की छूट मिलती है।

क्या-क्या शामिल है

  1. Asbestos Awareness

    SWMS · काम के 4 चरण

    Asbestos Awareness SWMS: 4 job steps for identifying and reporting asbestos-containing materials and responding to accidental disturbance.

    अलग से भी मिलता है
  2. Extension Ladder

    SOP · 7 सेक्शन

    Extension ladder safe operating procedure: hazards, pre-use inspection, transporting, set-up, use and carrying, with a training register.

    अलग से भी मिलता है
  3. Painting and Decorating

    SWMS · काम के 15 चरण

    SWMS for painting and decorating work: transport, site set-up, ladders and scaffolds, surface preparation, mixing, spraying and emergencies.

    अलग से भी मिलता है
  4. Roof Work

    SWMS · काम के 14 चरण

    SWMS for roof work: hazards and controls for falls from height, asbestos, access by scaffold, ladder or hatch, harness use, tools and emergencies.

    अलग से भी मिलता है
  5. Mobile Plant Working Near-Around

    SWMS · काम के 8 चरण

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    अलग से भी मिलता है
  6. Falls Emergency Rescue Plan

    मैनेजमेंट प्लान · 14 सेक्शन

    A pre-planned procedure for rescuing a worker who has fallen and is suspended in a harness, with a pre-planning checklist and a site-specific rescue plan.

    अलग से भी मिलता है
  7. Handheld Power Tools

    SOP · 9 सेक्शन

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    अलग से भी मिलता है
  8. Trestle Scaffold

    SOP · 7 सेक्शन

    Safe operating procedure for trestle scaffolds: hazards, PPE, training, pre-operational inspection, step-by-step operation and a training register.

    अलग से भी मिलता है
  9. High Pressure Water Cleaner

    SWMS · काम के 10 चरण

    SWMS for high-pressure water jet cleaning: site set-up, hot water and steam, electric and fuel units, refuelling, hazardous materials and emergencies.

    अलग से भी मिलता है
  10. Manual Handling

    SOP · 5 सेक्शन

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    अलग से भी मिलता है
  11. Hazardous Chemicals

    SWMS · काम के 12 चरण

    SWMS for hazardous chemicals work: purchasing, storage, labelling, handling, confined spaces, completion and emergency response.

    अलग से भी मिलता है
  12. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · काम के 12 चरण

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    अलग से भी मिलता है
  13. Platform Ladder

    SOP · 7 सेक्शन

    Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.

    अलग से भी मिलता है
  14. Lead Paint Removal

    SWMS · काम के 13 चरण

    SWMS for lead paint removal: health monitoring, site set-up, environmental protection, tools, hazardous substances, clean-up and emergencies.

    अलग से भी मिलता है
  15. Hand Tools

    SOP · 9 सेक्शन

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    अलग से भी मिलता है
  16. Cherry Picker

    SOP · 10 सेक्शन

    Safe operating procedure for a cherry picker: hazards, PPE, inspection, function tests, operation, emergency response and a hazard checklist.

    अलग से भी मिलता है
  17. Powered Non-powered Tools

    SWMS · काम के 12 चरण

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    अलग से भी मिलता है
  18. Scissor Lift

    SOP · 10 सेक्शन

    Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.

    अलग से भी मिलता है
  19. Manual Handling

    SWMS · काम के 18 चरण

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    अलग से भी मिलता है
  20. Mobile Scaffolding

    SOP · 8 सेक्शन

    Safe operating procedure for mobile scaffolding: hazards, PPE, inspection, erecting, moving and dismantling, and a working at height checklist.

    अलग से भी मिलता है

इसमें क्या-क्या है

इसमें शामिल ख़तरे

इसमें दिए गए कानून और मानक

हर SWMS के साथ कानूनों और कोड ऑफ़ प्रैक्टिस की हमारी संदर्भ सूची आती है।

आपकी बचत

टेम्पलेटकाम के चरणअलग से
Asbestos Awareness4$89.95 · 1 क्रेडिट
Extension Ladder0$89.95 · 1 क्रेडिट
Painting and Decorating15$89.95 · 1 क्रेडिट
Roof Work14$89.95 · 1 क्रेडिट
Mobile Plant Working Near-Around8$89.95 · 1 क्रेडिट
Falls Emergency Rescue Plan0$89.95 · 1 क्रेडिट
Handheld Power Tools0$89.95 · 1 क्रेडिट
Trestle Scaffold0$89.95 · 1 क्रेडिट
High Pressure Water Cleaner10$89.95 · 1 क्रेडिट
Manual Handling0$89.95 · 1 क्रेडिट
Hazardous Chemicals12$89.95 · 1 क्रेडिट
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 क्रेडिट
Platform Ladder0$89.95 · 1 क्रेडिट
Lead Paint Removal13$89.95 · 1 क्रेडिट
Hand Tools0$89.95 · 1 क्रेडिट
Cherry Picker0$89.95 · 1 क्रेडिट
Powered Non-powered Tools12$89.95 · 1 क्रेडिट
Scissor Lift0$89.95 · 1 क्रेडिट
Manual Handling18$89.95 · 1 क्रेडिट
Mobile Scaffolding0$89.95 · 1 क्रेडिट
एक-एक करके ख़रीदने पर$1,799.00 · 20 क्रेडिट
इस पैक में$1,349.25 · 15 क्रेडिट आप $449.75 बचाते हैं

रिव्यू

अभी कोई रिव्यू नहीं।

टेम्पलेट कैसे काम करते हैं

आज़माएँ, पैसे देने से पहले।

  1. मुफ़्त प्रीव्यू

    हर टेम्पलेट के काम के चरण, ख़तरे और पहला काम पढ़ने के लिए खुले हैं। साइन अप की ज़रूरत नहीं।

  2. एडिटर आज़माएँ

    कंप्यूटर या अपने फ़ोन पर, एक डेमो SWMS को अपनी कंपनी, जॉब और साइट के हिसाब से ढालें।

  3. मुफ़्त में साइन अप करें

    आपकी जानकारी और लोगो साथ आ जाते हैं। यह टेम्पलेट पहले से भरा हुआ खुलता है।

  4. क्रेडिट इस्तेमाल करें या एक बार ख़रीदें

    पेड प्लान में हर महीने टेम्पलेट क्रेडिट मिलते हैं। या यह टेम्पलेट हमेशा के लिए ख़रीद लें।