얼리 액세스 혜택:얼리 액세스: 30% 할인, 구독을 유지하는 동안 계속.

혜택 받기

템플릿 문서는 영어로 작성되어 있습니다.

에디터 무료로 써 보기
알뜰 팩 · 템플릿 30개

Carpentry on Construction Combo

알뜰 팩 · PACK-50334

Carpentry on Construction Combo 알뜰 팩 템플릿 미리보기
  • 템플릿 30개
  • 24 가격에 30개
  • 라이브러리 폴더 하나에 모두 담겨 제공

A set of ten SWMS and 20 SOPs for carpenters working on construction sites.

The SWMS cover lock-up and fix stage carpentry, decking, cladding, cabinet installation and framing and trusses. The SOPs include Table Saw, Reciprocating Saw and Handheld Circular Saw.

Each document is the same one sold on its own, so you get every update to it. Together they cost 24 template credits instead of 30.

Internal External Lock-Up Fix Stage Carpentry SWMS 미리 보기

Internal External Lock-Up Fix Stage Carpentry

SWMSVersion 10
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW – identified in the Job Task column):

  • Mobile PlantMobile plant movement
  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous LinesChemical, fuel or refrigerant lines
  • Energised ElectricalEnergised electrical installations or services
  • FallsInvolves a risk of a person falling from 2m or more
  • Telecom TowersIncluding work on telecommunications towers

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers are trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract.

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences.

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards are identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

(add site-specific notes)

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Provide training on the health effects associated with RCS

    • Hazard

      Exposure to respirable crystalline silica (RCS) – dust inhalation

      Before controls3 High
      Controls
      • Training and Information provided to workers on RCS should include the following:

        • Identification of RCS dust through Material/Safety Datasheet (M/SDS) or labels

        • Dust exposure prevention

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes)

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

작업 단계 14개 더: Check weather conditions & prepare부터 Emergency response까지

단계마다 위험 요소, 위험도 평가, 관리 조치가 있고, 작업자 서명란도 포함됩니다.

미리 보기 방식

브라우저에서 보이는 모습

이 알뜰 팩 받기

무료로 가입한 뒤 받는 방법을 선택하세요. 모든 문서가 팩 이름으로 된 폴더에 담겨 라이브러리에 들어갑니다.

  • 유료 요금제에 포함

    요금제의 템플릿 크레딧을 사용하세요. 이 팩은 30 대신 24입니다.

    요금제와 가격 비교
  • 한 번 구매하기

    $2,158.80 $2,698.50 한 번 결제로 계속 소유합니다. 무료 요금제에서도 사용할 수 있습니다.

가입에 카드가 필요 없습니다. 얼리 액세스 회원은 모든 요금제에서 30% 할인을 받습니다.

포함 내용

  1. Internal External Lock-Up Fix Stage Carpentry

    SWMS · 작업 단계 15개

    Covers internal and external lock-up and fix stage carpentry, with the risks and controls for each job step from site arrival to emergency response.

    단독으로도 판매
  2. Battery Charging and Handling

    SOP · 섹션 7개

    Safe operating procedure for charging and handling batteries: hazards, emergency response to acid splashes, PPE, precautions, recharging area and battery movement.

    단독으로도 판매
  3. Table Saw

    SOP · 섹션 9개

    Safe operating procedure for a table saw: hazards, PPE, precautions, pre-operational inspection, operation, kickback prevention and a hazard checklist.

    단독으로도 판매
  4. Mobile Plant Working Near-Around

    SWMS · 작업 단계 8개

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    단독으로도 판매
  5. Reciprocating Saw

    SOP · 섹션 9개

    Safe operating procedure for a reciprocating saw: hazards, PPE, training, pre-operational inspection, maintenance, operation, first aid and a hazard checklist.

    단독으로도 판매
  6. Trestle Scaffold

    SOP · 섹션 7개

    Safe operating procedure for trestle scaffolds: hazards, PPE, training, pre-operational inspection, step-by-step operation and a training register.

    단독으로도 판매
  7. Electric Air Compressor

    SOP · 섹션 9개

    Safe operating procedure for an electric air compressor: hazards, PPE, inspection, operation, cleaning and a hazard checklist.

    단독으로도 판매
  8. Manual Handling

    SOP · 섹션 5개

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    단독으로도 판매
  9. Decking

    SWMS · 작업 단계 19개

    SWMS for building a timber deck: falls from height, mobile plant, post footings, silica dust, wet cement and deck finishes.

    단독으로도 판매
  10. Handheld Circular Saw

    SOP · 섹션 8개

    Safe operating procedure for a handheld circular saw: hazards, PPE, precautions, inspection, operation, kickback and a hazard checklist.

    단독으로도 판매
  11. Nail Gun - Battery Operated -

    SOP · 섹션 8개

    Safe operating procedure for a battery-operated nail gun: hazards, PPE, battery charging, operation, jammed nails and a training register.

    단독으로도 판매
  12. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 작업 단계 12개

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    단독으로도 판매
  13. Docking Saw

    SOP · 섹션 10개

    Safe operating procedure for a docking saw: hazards, PPE, pre-operational inspection, maintenance, step-by-step operation and a hazard checklist.

    단독으로도 판매
  14. V Cut Mitre Saw

    SOP · 섹션 10개

    Safe operating procedure for a V cut mitre saw: hazards, PPE, training, inspection, blade replacement, operation, maintenance and a hazard checklist.

    단독으로도 판매
  15. Pneumatic Tools

    SOP · 섹션 8개

    Safe operating procedure for pneumatic tools: hazards, PPE, precautions, maintenance, pre-operational inspection, operation and a hazard checklist.

    단독으로도 판매
  16. Jigsaw

    SOP · 섹션 9개

    Safe operating procedure for a jigsaw: hazards, PPE, training, pre-operational inspection, operation, blade replacement, maintenance and a hazard checklist.

    단독으로도 판매
  17. Mitre/Drop Saw

    SOP · 섹션 8개

    Safe operating procedure for a mitre or drop saw: hazards, PPE, precautions, inspection, maintenance, operation, blade replacement and a hazard checklist.

    단독으로도 판매
  18. Hand Tools

    SOP · 섹션 9개

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    단독으로도 판매
  19. Handheld Router

    SOP · 섹션 9개

    Safe operating procedure for a handheld router: hazards, PPE, training, inspection, maintenance, operating steps and a hazard checklist.

    단독으로도 판매
  20. Cladding

    SWMS · 작업 단계 12개

    SWMS for installing cladding or siding, such as Hardie plank, on the outside of structures: delivery, access, silica dust, tools and emergencies.

    단독으로도 판매
  21. Cabinet Installation

    SWMS · 작업 단계 12개

    SWMS for cabinet making and installation: client consultation, site set-up, tools, hazardous substances, dust control, ladders, cuts and emergencies.

    단독으로도 판매
  22. Powered Non-powered Tools

    SWMS · 작업 단계 12개

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    단독으로도 판매
  23. Scissor Lift

    SOP · 섹션 10개

    Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.

    단독으로도 판매
  24. Manual Handling

    SWMS · 작업 단계 18개

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    단독으로도 판매
  25. Air Compressor

    SWMS · 작업 단계 9개

    SWMS for portable air compressor work: transport, set-up, operation, fuel and electrical hazards, noise, housekeeping, shut-down and emergencies.

    단독으로도 판매
  26. Framing and Trusses - Timber-Steel

    SWMS · 작업 단계 15개

    SWMS for erecting timber and steel framing and trusses: delivery, working at height, standing frames, craning and bracing trusses, and emergency response.

    단독으로도 판매
  27. Nail Gun - Pneumatic -

    SOP · 섹션 8개

    Safe operating procedure for a pneumatic nail gun: hazards, PPE, training, inspection, maintenance, operation, jammed nails and a hazard checklist.

    단독으로도 판매
  28. Working with Guarded Machinery

    SOP · 섹션 12개

    Safe operating procedure for working with or near guarded machinery: hazards, PPE, maintenance and LOTO, cleaning, reporting and a hazard checklist.

    단독으로도 판매
  29. Mobile Scaffolding

    SOP · 섹션 8개

    Safe operating procedure for mobile scaffolding: hazards, PPE, inspection, erecting, moving and dismantling, and a working at height checklist.

    단독으로도 판매
  30. Handheld Drill

    SOP · 섹션 9개

    Safe operating procedure for a handheld drill: hazards, PPE, precautions, pre-operational inspection, operation, maintenance and a hazard checklist.

    단독으로도 판매

다루는 내용

다루는 위험 요소

참조하는 법령 및 표준

모든 SWMS에는 관련 법령 및 실무 규정(code of practice) 참조 목록이 포함됩니다.

절약 금액

템플릿작업 단계단독 구매
Internal External Lock-Up Fix Stage Carpentry15$89.95 · 1크레딧
Battery Charging and Handling0$89.95 · 1크레딧
Table Saw0$89.95 · 1크레딧
Mobile Plant Working Near-Around8$89.95 · 1크레딧
Reciprocating Saw0$89.95 · 1크레딧
Trestle Scaffold0$89.95 · 1크레딧
Electric Air Compressor0$89.95 · 1크레딧
Manual Handling0$89.95 · 1크레딧
Decking19$89.95 · 1크레딧
Handheld Circular Saw0$89.95 · 1크레딧
Nail Gun - Battery Operated -0$89.95 · 1크레딧
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1크레딧
Docking Saw0$89.95 · 1크레딧
V Cut Mitre Saw0$89.95 · 1크레딧
Pneumatic Tools0$89.95 · 1크레딧
Jigsaw0$89.95 · 1크레딧
Mitre/Drop Saw0$89.95 · 1크레딧
Hand Tools0$89.95 · 1크레딧
Handheld Router0$89.95 · 1크레딧
Cladding12$89.95 · 1크레딧
Cabinet Installation12$89.95 · 1크레딧
Powered Non-powered Tools12$89.95 · 1크레딧
Scissor Lift0$89.95 · 1크레딧
Manual Handling18$89.95 · 1크레딧
Air Compressor9$89.95 · 1크레딧
Framing and Trusses - Timber-Steel15$89.95 · 1크레딧
Nail Gun - Pneumatic -0$89.95 · 1크레딧
Working with Guarded Machinery0$89.95 · 1크레딧
Mobile Scaffolding0$89.95 · 1크레딧
Handheld Drill0$89.95 · 1크레딧
하나씩 구매 시$2,698.50 · 30크레딧
이 팩으로 구매 시$2,158.80 · 24크레딧 $539.70 절약

리뷰

아직 리뷰가 없습니다.

템플릿 이용 방법

먼저 써 보고 결제하세요.

  1. 무료 미리 보기

    모든 템플릿의 작업 단계, 위험 요소, 첫 번째 작업 내용을 자유롭게 볼 수 있습니다. 가입이 필요 없습니다.

  2. 에디터 써 보기

    컴퓨터나 휴대폰에서 데모 SWMS에 회사, 작업, 현장 정보를 넣어 보세요.

  3. 무료 가입

    입력한 정보와 로고가 그대로 옮겨집니다. 이 템플릿이 정보가 채워진 상태로 열립니다.

  4. 크레딧 사용 또는 한 번 구매

    유료 요금제에는 매달 템플릿 크레딧이 포함됩니다. 또는 이 템플릿만 구매해 계속 소유하세요.