Wall Saw
Acronyms
LOTO - Lockout/Tagout.
PPE - Personal Protective Equipment.
SOP - Safe Operating Procedure.
섹션 8개 더
- Hazards
- Personal protective equipment
- Pre-operational inspection
- Precautions
- Work area
- 외 3개
전체 내용이 작성되어 있어 사업장 정보만 넣으면 됩니다.
템플릿 문서는 영어로 작성되어 있습니다.
알뜰 팩 · PACK-50336

A set of 11 SWMS and 11 SOPs for concreters.
The SWMS cover concrete placement and finishing, slabs on ground, foundations, steel fixing, sawing and core drilling and silica dust. The SOPs include Wall Saw, Demolition Saw - Fuel Operated and Jackhammer.
Each document is the same one sold on its own, so you get every update to it. Together they cost 16 template credits instead of 22.
Wall Saw
LOTO - Lockout/Tagout.
PPE - Personal Protective Equipment.
SOP - Safe Operating Procedure.
섹션 8개 더
전체 내용이 작성되어 있어 사업장 정보만 넣으면 됩니다.
브라우저에서 보이는 모습
무료로 가입한 뒤 받는 방법을 선택하세요. 모든 문서가 팩 이름으로 된 폴더에 담겨 라이브러리에 들어갑니다.
$1,439.20 $1,978.90 한 번 결제로 계속 소유합니다. 무료 요금제에서도 사용할 수 있습니다.
가입에 카드가 필요 없습니다. 얼리 액세스 회원은 모든 요금제에서 30% 할인을 받습니다.
Safe operating procedure for a wall saw: hazards, PPE, training, inspection, step-by-step operation, manual handling and a hazard checklist.
단독으로도 판매SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.
단독으로도 판매Safe operating procedure for a fuel-operated demolition saw: hazards, PPE, precautions, inspection, operation, maintenance, fuelling and a hazard checklist.
단독으로도 판매Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.
단독으로도 판매SWMS for concrete placement and finishing: delivery, pumping and pouring, power lines, mobile plant, cement burns, trowelling machines and emergencies.
단독으로도 판매Safe operating procedure for a jackhammer: hazards, PPE, pre-operational inspection, precautions, operation, fuelling, maintenance and a hazard checklist.
단독으로도 판매Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.
단독으로도 판매Safe operating procedure for a fuel-powered concrete cutter: hazards, PPE, inspection, silica, maintenance, fuelling, operation and a hazard checklist.
단독으로도 판매Safe operating procedure for a handheld circular saw: hazards, PPE, precautions, inspection, operation, kickback and a hazard checklist.
단독으로도 판매SWMS for excavating, steel setting and pouring concrete foundations: 17 job steps from site set-up and plant delivery to the pour and emergencies.
단독으로도 판매Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.
단독으로도 판매Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.
단독으로도 판매Safe operating procedure for outdoor work: hazards, PPE, hot and cold conditions, poisonous plants, animals, first aid and a training register.
단독으로도 판매Safe operating procedure for a concrete core drill: hazards, PPE, inspection, precautions, operation steps, maintenance and a hazard checklist.
단독으로도 판매Concrete Steel Fixing SWMS: 15 job steps covering reo bar and mesh, crane lifting, scaffolds, hot work, power lines and emergencies.
단독으로도 판매Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.
단독으로도 판매Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.
단독으로도 판매Formwork Decks-Columns-Stairs SWMS: 21 job steps covering formwork design, tools, working at height, crane lifts, stripping and emergencies.
단독으로도 판매SWMS for using a hand-held, electric or petrol/diesel-powered concrete saw and core drill, with silica dust, fuel and electrical controls.
단독으로도 판매Safe work method statement for concrete slab on ground work, covering formwork, fill and steel reinforcement placement, with the hazards and controls for each job step.
단독으로도 판매SWMS for truck-mounted cranes such as Hiabs: 16 job steps from training and road operation to pre-lift checks, loading and unloading, and emergency response.
단독으로도 판매Safe operating procedure for a floor grinder: hazards, PPE, inspection, dust precautions, maintenance, operation, manual handling and a hazard checklist.
단독으로도 판매모든 SWMS에는 관련 법령 및 실무 규정(code of practice) 참조 목록이 포함됩니다.
| 템플릿 | 작업 단계 | 단독 구매 |
|---|---|---|
| 0 | $89.95 · 1크레딧 | |
| 8 | $89.95 · 1크레딧 | |
| 0 | $89.95 · 1크레딧 | |
| 0 | $89.95 · 1크레딧 | |
| 13 | $89.95 · 1크레딧 | |
| 0 | $89.95 · 1크레딧 | |
| 0 | $89.95 · 1크레딧 | |
| 0 | $89.95 · 1크레딧 | |
| 0 | $89.95 · 1크레딧 | |
| 17 | $89.95 · 1크레딧 | |
| 14 | $89.95 · 1크레딧 | |
| 0 | $89.95 · 1크레딧 | |
| 0 | $89.95 · 1크레딧 | |
| 0 | $89.95 · 1크레딧 | |
| 15 | $89.95 · 1크레딧 | |
| 12 | $89.95 · 1크레딧 | |
| 18 | $89.95 · 1크레딧 | |
| 21 | $89.95 · 1크레딧 | |
| 13 | $89.95 · 1크레딧 | |
| 17 | $89.95 · 1크레딧 | |
| 16 | $89.95 · 1크레딧 | |
| 0 | $89.95 · 1크레딧 | |
| 하나씩 구매 시 | ||
| 이 팩으로 구매 시 | $1,439.20 · 16크레딧 $539.70 절약 | |
아직 리뷰가 없습니다.
템플릿 이용 방법
모든 템플릿의 작업 단계, 위험 요소, 첫 번째 작업 내용을 자유롭게 볼 수 있습니다. 가입이 필요 없습니다.
컴퓨터나 휴대폰에서 데모 SWMS에 회사, 작업, 현장 정보를 넣어 보세요.
입력한 정보와 로고가 그대로 옮겨집니다. 이 템플릿이 정보가 채워진 상태로 열립니다.
유료 요금제에는 매달 템플릿 크레딧이 포함됩니다. 또는 이 템플릿만 구매해 계속 소유하세요.