얼리 액세스 혜택:얼리 액세스: 30% 할인, 구독을 유지하는 동안 계속.

혜택 받기

템플릿 문서는 영어로 작성되어 있습니다.

알뜰 팩 · 템플릿 9개

Working at Height

알뜰 팩 · PACK-50150

Working at Height 알뜰 팩 템플릿 미리보기
  • 템플릿 9개
  • 7 가격에 9개
  • 라이브러리 폴더 하나에 모두 담겨 제공

Nine SWMS for contractors who work at height: ladders, scaffolds, roof edge protection, rope access, safety harnesses and elevating work platforms.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost seven template credits instead of nine.

Ladders SWMS 미리 보기

Ladders

SWMSVersion 7
Company doing the work
[Company]
Business contact
—
Business contact phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with the requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following "High-Risk Construction Work" (HRCW - identified in the Job Task column)

  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous LinesChemical, fuel or refrigerant lines
  • Energised ElectricalEnergised electrical installations or services
  • FallsInvolves a risk of a person falling from 2m or more, including work on telecommunications towers

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures.

  • Establish supervisory and communication arrangements.

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card for construction work.

  • Relevant workers have relevant certificates of competency, licenses, and training. (specify on the SWMS sign-off for each worker)

  • Trained First Aider on site.

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs.

  • Attend all site inductions/briefings.

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract.

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences.

  • SWMS to be reviewed and amended, if necessary, in consultation with relevant people after any near miss or incident.

  • If additional site hazards identified, review this SWMS and amend control measures to suit.

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP.

  • Give the principal contractor a copy of the revised SWMS.

  • The site supervisor to monitor works against the controls stated in this SWMS.

  • SWMS must be kept on-site and made available for inspection or review.

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident.

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

(add notes specific to this site)

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

Inherent risk-rating (IR) before controls – residual risk-rating (RR) after controls.

  • Work activity

    Training

    • Hazard

      Lack of knowledge or training on safe ladder use

      Before controls3 High
      Controls
      • Provide training for all workers on safe ladder use, including choosing the right ladder, correct setup, and safe climbing practices.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

작업 단계 9개 더: Manual Handling부터 Incident Management까지

단계마다 위험 요소, 위험도 평가, 관리 조치가 있고, 작업자 서명란도 포함됩니다.

미리 보기 방식

브라우저에서 보이는 모습

이 알뜰 팩 받기

무료로 가입한 뒤 받는 방법을 선택하세요. 모든 문서가 팩 이름으로 된 폴더에 담겨 라이브러리에 들어갑니다.

  • 유료 요금제에 포함

    요금제의 템플릿 크레딧을 사용하세요. 이 팩은 9 대신 7입니다.

    요금제와 가격 비교
  • 한 번 구매하기

    $629.65 $809.55 한 번 결제로 계속 소유합니다. 무료 요금제에서도 사용할 수 있습니다.

가입에 카드가 필요 없습니다. 얼리 액세스 회원은 모든 요금제에서 30% 할인을 받습니다.

포함 내용

  1. Ladders

    SWMS · 작업 단계 10개

    Ladders SWMS: 10 job steps covering transport, set-up, safe use, electrical hazards, emergencies and incident reporting for step, extension and platform ladders.

    단독으로도 판매
  2. Roof Edge Protection

    SWMS · 작업 단계 16개

    SWMS for installing and dismantling roof edge protection using extension ladders, mobile scaffolding and safety harnesses.

    단독으로도 판매
  3. Erecting Fixed Scaffold

    SWMS · 작업 단계 14개

    Erecting Fixed Scaffold SWMS: 14 job steps from unloading and erecting to handover, dismantling and emergency response.

    단독으로도 판매
  4. Mobile Scaffold

    SWMS · 작업 단계 11개

    A Mobile Scaffold SWMS covering the hazards and controls for erecting, using, moving and dismantling mobile scaffolds, from training to incident management.

    단독으로도 판매
  5. Rope Access

    SWMS · 작업 단계 13개

    Rope Access SWMS: 13 job steps covering rigging plans, falls rescue planning, inspecting harnesses and anchor points, and working on the ropes.

    단독으로도 판매
  6. Safety Harness

    SWMS · 작업 단계 10개

    Safety harness SWMS: 10 job steps from anchor point set-up and harness inspection to fall rescue, incident management and departure.

    단독으로도 판매
  7. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 작업 단계 12개

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    단독으로도 판매
  8. Trestles

    SWMS · 작업 단계 10개

    Trestles SWMS: 10 job steps covering trestle handling, set-up, work at height, electric shock, wet weather and emergencies.

    단독으로도 판매
  9. Working on Scaffolds

    SWMS · 작업 단계 7개

    Working on Scaffolds SWMS: 7 job steps covering scaffold inspection, general use, mobile scaffolds, trestles, emergencies and incidents.

    단독으로도 판매

다루는 내용

다루는 위험 요소

참조하는 법령 및 표준

모든 SWMS에는 관련 법령 및 실무 규정(code of practice) 참조 목록이 포함됩니다.

절약 금액

템플릿작업 단계단독 구매
Ladders10$89.95 · 1크레딧
Roof Edge Protection16$89.95 · 1크레딧
Erecting Fixed Scaffold14$89.95 · 1크레딧
Mobile Scaffold11$89.95 · 1크레딧
Rope Access13$89.95 · 1크레딧
Safety Harness10$89.95 · 1크레딧
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1크레딧
Trestles10$89.95 · 1크레딧
Working on Scaffolds7$89.95 · 1크레딧
하나씩 구매 시$809.55 · 9크레딧
이 팩으로 구매 시$629.65 · 7크레딧 $179.90 절약

리뷰

  • A-Z of everything we need, more than helpful customer service and all questions answered. 1st class company!

    Michael Downey구매 인증

템플릿 이용 방법

먼저 써 보고 결제하세요.

  1. 무료 미리 보기

    모든 템플릿의 작업 단계, 위험 요소, 첫 번째 작업 내용을 자유롭게 볼 수 있습니다. 가입이 필요 없습니다.

  2. 에디터 써 보기

    컴퓨터나 휴대폰에서 데모 SWMS에 회사, 작업, 현장 정보를 넣어 보세요.

  3. 무료 가입

    입력한 정보와 로고가 그대로 옮겨집니다. 이 템플릿이 정보가 채워진 상태로 열립니다.

  4. 크레딧 사용 또는 한 번 구매

    유료 요금제에는 매달 템플릿 크레딧이 포함됩니다. 또는 이 템플릿만 구매해 계속 소유하세요.