प्रारम्भिक पहुँच अफर:प्रारम्भिक पहुँच: 30% छुट, सदस्यता रहेसम्म.

अफर लिनुहोस्

टेम्प्लेट कागजातहरू अंग्रेजीमा लेखिएका छन्।

किफायती प्याक · 18 टेम्प्लेट

Air Conditioning Combo

किफायती प्याक · PACK-50328

Air Conditioning Combo किफायती प्याक टेम्प्लेटको पूर्वावलोकन
  • 18 टेम्प्लेट
  • 14 को मूल्यमा 18
  • लाइब्रेरीको एउटै फोल्डरमा आउँछ

A set of ten SWMS, six SOPs and two plans for air conditioning installers and service contractors.

The SWMS cover installation, servicing and repairs, roof spaces, risers and confined spaces. The SOPs include Extension Ladder, Handheld Power Tools and Manual Handling. It also includes Electrical Emergency Response Plan and Confined Space Emergency Rescue Plan.

Each document is the same one sold on its own, so you get every update to it. Together they cost 14 template credits instead of 18.

Height Access Equipment SWMS को पूर्वावलोकन

Height Access Equipment

SWMSVersion 11
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • FallsRisk of a person falling more than two metres. Note: in some jurisdictions this is three metres.
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (How to Manage Work Health and Safety Risks) Code of Practice 2015
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (How to Manage Work Health and Safety Risks Code of Practice) Approval 2025
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2025
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • How to manage work health and safety risks code of practice 2019
  • Managing the work environment and facilities code of practice 2019
  • Construction work code of practice 2019

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • How to manage work health and safety risks - Code of practice 2026
  • Managing the work environment and facilities - Code of practice 2026
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • How to Manage Work Health and Safety Risks: Code of practice 2020
  • Managing the Work Environment and Facilities: Code of practice 2020
  • Construction work Code of Practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • How to Manage Work Health and Safety Risks - Code of practice 2024
  • Managing the Work Environment and Facilities - Code of practice 2024
  • Construction Work - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • How to manage work health and safety risks – Code of practice 2022
  • Managing the work environment and facilities – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Ensure site-specific induction undertaken

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures for unanticipated hazards.

      After controls2 Moderate
      Responsible
      • SupervisorCheck the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

कामका थप 16 चरण, Work area set-up देखि Emergency response सम्म

हरेकमा खतरा, जोखिम रेटिङ र नियन्त्रण, साथै तपाईंको टोलीको साइन-अन।

यसरी पूर्वावलोकन गर्नुहोस्

ब्राउजरमा यो कस्तो देखिन्छ

यो किफायती प्याक लिनुहोस्

निःशुल्क साइन अप गर्नुहोस्, अनि कसरी लिने छान्नुहोस्। हरेक कागजात तपाईंको लाइब्रेरीमा, प्याकको नाम दिइएको फोल्डरमा जान्छ।

  • सशुल्क प्लानहरूमा समावेश

    आफ्नो प्लानका टेम्प्लेट क्रेडिट प्रयोग गर्नुहोस्। यो प्याकको मूल्य 18 को सट्टा 14 हो।

    प्लान र मूल्य तुलना गर्नुहोस्
  • एकपटक किन्नुहोस्

    $1,259.30 $1,619.10 एकपटक तिरेपछि सधैँ तपाईंकै। निःशुल्क प्लानमा पनि चल्छ।

साइन अप गर्न कार्ड चाहिँदैन। प्रारम्भिक पहुँच सदस्यहरूले जुनसुकै प्लानमा 30% छुट पाउँछन्।

के के समावेश छ

  1. Height Access Equipment

    SWMS · कामका 17 चरण

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    छुट्टै पनि किन्न पाइन्छ
  2. Extension Ladder

    SOP · 7 खण्ड

    Extension ladder safe operating procedure: hazards, pre-use inspection, transporting, set-up, use and carrying, with a training register.

    छुट्टै पनि किन्न पाइन्छ
  3. Mobile Plant Working Near-Around

    SWMS · कामका 8 चरण

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    छुट्टै पनि किन्न पाइन्छ
  4. Handheld Power Tools

    SOP · 9 खण्ड

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    छुट्टै पनि किन्न पाइन्छ
  5. Working On/Near Telecommunications Towers

    SWMS · कामका 8 चरण

    Working on or near telecommunications towers SWMS: 8 job steps covering tower climbing, falls, RF exposure, completion and emergencies.

    छुट्टै पनि किन्न पाइन्छ
  6. Manual Handling

    SOP · 5 खण्ड

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    छुट्टै पनि किन्न पाइन्छ
  7. Confined Space Work

    SWMS · कामका 10 चरण

    A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.

    छुट्टै पनि किन्न पाइन्छ
  8. Risers Working In

    SWMS · कामका 12 चरण

    Safe work method statement for working in risers, covering 12 job steps from rescue planning and entry assessment to falls, heat stress and emergencies.

    छुट्टै पनि किन्न पाइन्छ
  9. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · कामका 12 चरण

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    छुट्टै पनि किन्न पाइन्छ
  10. Platform Ladder

    SOP · 7 खण्ड

    Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.

    छुट्टै पनि किन्न पाइन्छ
  11. Working in Roof Spaces

    SWMS · कामका 8 चरण

    SWMS for working in roof spaces, ceiling spaces and subfloors: electrical hazards, ladders, heat stress, vermin, snakes and emergency response.

    छुट्टै पनि किन्न पाइन्छ
  12. Hand Tools

    SOP · 9 खण्ड

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    छुट्टै पनि किन्न पाइन्छ
  13. Air Conditioning Installation

    SWMS · कामका 16 चरण

    Covers installing, maintaining or repairing air conditioning units, with the risks and controls for each job step from planning to emergency response.

    छुट्टै पनि किन्न पाइन्छ
  14. Electrical Emergency Response Plan

    व्यवस्थापन योजना · 16 खण्ड

    Sets clear responsibilities and response steps for electrical emergencies, with contact, personnel, first aid, training and drill registers.

    छुट्टै पनि किन्न पाइन्छ
  15. Scissor Lift

    SOP · 10 खण्ड

    Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.

    छुट्टै पनि किन्न पाइन्छ
  16. Manual Handling

    SWMS · कामका 18 चरण

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    छुट्टै पनि किन्न पाइन्छ
  17. Air Conditioning Service and Repairs

    SWMS · कामका 14 चरण

    SWMS for air conditioning service and repairs: refrigerants, indoor and outdoor unit maintenance, energised electrical work, testing and emergencies.

    छुट्टै पनि किन्न पाइन्छ
  18. Confined Space Emergency Rescue Plan

    व्यवस्थापन योजना · 11 खण्ड

    A seven-step emergency rescue plan for confined spaces, with site details, assembly points, first aid officers and rescue equipment.

    छुट्टै पनि किन्न पाइन्छ

यसले के समेट्छ

यसले समेट्ने खतराहरू

यसले सन्दर्भ गर्ने कानुन र मापदण्डहरू

हरेक SWMS सँग हाम्रो कानुन र अभ्यास संहिताको सन्दर्भ सूची आउँछ।

तपाईंले कति बचत गर्नुहुन्छ

टेम्प्लेटकामका चरणछुट्टै
Height Access Equipment17$89.95 · 1 क्रेडिट
Extension Ladder0$89.95 · 1 क्रेडिट
Mobile Plant Working Near-Around8$89.95 · 1 क्रेडिट
Handheld Power Tools0$89.95 · 1 क्रेडिट
Working On/Near Telecommunications Towers8$89.95 · 1 क्रेडिट
Manual Handling0$89.95 · 1 क्रेडिट
Confined Space Work10$89.95 · 1 क्रेडिट
Risers Working In12$89.95 · 1 क्रेडिट
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 क्रेडिट
Platform Ladder0$89.95 · 1 क्रेडिट
Working in Roof Spaces8$89.95 · 1 क्रेडिट
Hand Tools0$89.95 · 1 क्रेडिट
Air Conditioning Installation16$89.95 · 1 क्रेडिट
Electrical Emergency Response Plan0$89.95 · 1 क्रेडिट
Scissor Lift0$89.95 · 1 क्रेडिट
Manual Handling18$89.95 · 1 क्रेडिट
Air Conditioning Service and Repairs14$89.95 · 1 क्रेडिट
Confined Space Emergency Rescue Plan0$89.95 · 1 क्रेडिट
एक एक गरी किन्दा$1,619.10 · 18 क्रेडिट
यो प्याकमा$1,259.30 · 14 क्रेडिट तपाईं $359.80 बचत गर्नुहुन्छ

समीक्षाहरू

अहिलेसम्म कुनै समीक्षा छैन।

टेम्प्लेटहरू कसरी काम गर्छन्

यसलाई पैसा तिर्नुअघि नै चलाएर हेर्नुहोस्।

  1. निःशुल्क पूर्वावलोकन

    हरेक टेम्प्लेटका कामका चरण, खतरा र पहिलो काम पढ्न खुला छन्। साइन अप चाहिँदैन।

  2. एडिटर चलाएर हेर्नुहोस्

    कम्प्युटर वा फोनमा, डेमो SWMS लाई आफ्नो कम्पनी, काम र साइटअनुसार मिलाउनुहोस्।

  3. निःशुल्क साइन अप गर्नुहोस्

    तपाईंको विवरण र लोगो सर्छन्। यो टेम्प्लेट विवरण भरिएरै खुल्छ।

  4. क्रेडिट प्रयोग गर्नुहोस् वा एकपटक किन्नुहोस्

    सशुल्क प्लानहरूमा हरेक महिना टेम्प्लेट क्रेडिट आउँछ। वा सधैँका लागि यो एउटा किन्नुहोस्।