प्रारम्भिक पहुँच अफर:प्रारम्भिक पहुँच: 30% छुट, सदस्यता रहेसम्म.

अफर लिनुहोस्

टेम्प्लेट कागजातहरू अंग्रेजीमा लेखिएका छन्।

प्रणाली · 126 कागजात

HVAC-Refrigeration Integrated Industry Suite

प्रणाली · SYS-50379

HVAC-Refrigeration Integrated Industry Suite प्रणाली टेम्प्लेटको पूर्वावलोकन
  • 126 कागजात
  • लाइब्रेरीको एउटै फोल्डरमा आउँछ

A full set of safety documents for HVAC and refrigeration contractors, from task-level procedures to a management system for the whole business.

The pack has 19 SWMS covering duct work, air conditioning installation and repairs, refrigerant gas, cool rooms, welding and confined spaces, and nine SOPs including Oxy-Acetylene Welding, Refrigerant Gases and Lock Out Tag Out - LOTO.

It also includes an integrated management system that meets ISO 45001, ISO 14001 and ISO 9001: over 90 plans, policies, forms, registers and checklists, including Quality Project Management Plan, AS/NZS ISO 45001:2018 Internal Audit Checklist and Health and Wellbeing Module.

The documents arrive together in one folder of your Library, and you get every update to each of them.

Cool Room Repair SWMS को पूर्वावलोकन

Cool Room Repair

SWMSVersion 4
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Extreme TemperatureArtificial extremes of temperature
  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous LinesChemical, fuel or refrigerant lines
  • Energised ElectricalEnergised electrical installations or services
  • FallsInvolves a risk of a person falling from 2m or more, including work on telecommunications towers
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

Planning/preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training.

    • Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Head Protection
  • Face Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Out-of-hours / night work

    • Hazard

      Fatigue; Unauthorised access; Insecure workplace

      Before controls3 High
      Controls
      • Allow adequate meal breaks for workers; especially if they have worked during part of the day, they will need time to rest & recover sufficiently to work safely into the evening/night

      • Do not schedule full double shifts for workers as worker fatigue increases the risk of incidents

      • Workers have access to:

        • Suitable amenities (toilets/wash facilities/drinking water)

        • Sufficient lighting (including parking areas)

        • Air conditioning, heating and mechanical ventilation if required

        • Emergency exits

        • Safe area for parking/unloading equipment – protected from rain

      • Additional security personnel on-site to ensure no unauthorised access by the general public while work is being performed

      • No worker should work alone on the site at night.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Emergency

      Before controls4 Acute
      Controls
      • Avoid people working alone, use a buddy system to provide immediate support

      • Have a reliable communication system in place and test regularly.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

कामका थप 15 चरण, Arrival on-site & assess onsite conditions देखि Emergency response सम्म

हरेकमा खतरा, जोखिम रेटिङ र नियन्त्रण, साथै तपाईंको टोलीको साइन-अन।

यसरी पूर्वावलोकन गर्नुहोस्

ब्राउजरमा यो कस्तो देखिन्छ

यो प्रणाली लिनुहोस्

निःशुल्क साइन अप गर्नुहोस्, अनि कसरी लिने छान्नुहोस्। हरेक कागजात तपाईंको लाइब्रेरीमा, प्याकको नाम दिइएको फोल्डरमा जान्छ।

  • सशुल्क प्लानहरूमा समावेश

    आफ्नो प्लानका टेम्प्लेट क्रेडिट प्रयोग गर्नुहोस्। यसको मूल्य 20 हो।

    प्लान र मूल्य तुलना गर्नुहोस्
  • एकपटक किन्नुहोस्

    $999.90 एकपटक तिरेपछि सधैँ तपाईंकै। निःशुल्क प्लानमा पनि चल्छ।

साइन अप गर्न कार्ड चाहिँदैन। प्रारम्भिक पहुँच सदस्यहरूले जुनसुकै प्लानमा 30% छुट पाउँछन्।

के के समावेश छ

  1. Cool Room Repair

    SWMS · कामका 16 चरण

    A SWMS for repairing cool rooms and freezer rooms from an elevated work platform (EWP): the hazards and controls for each job step.

    छुट्टै पनि किन्न पाइन्छ
  2. Refrigeration

    SWMS · कामका 18 चरण

    SWMS for refrigeration work: cylinder handling, system evacuation, flushing and charging, working at height, testing and emergency response.

    छुट्टै पनि किन्न पाइन्छ
  3. Air Conditioning Service and Repairs

    SWMS · कामका 14 चरण

    SWMS for air conditioning service and repairs: refrigerants, indoor and outdoor unit maintenance, energised electrical work, testing and emergencies.

    छुट्टै पनि किन्न पाइन्छ
  4. Materials Duct Lifter

    SWMS · कामका 6 चरण

    Materials Duct Lifter SWMS: 6 job steps covering site set-up, power line clearances, lifter pre-inspection, operation and emergency response.

    छुट्टै पनि किन्न पाइन्छ
  5. Working On/Near Telecommunications Towers

    SWMS · कामका 8 चरण

    Working on or near telecommunications towers SWMS: 8 job steps covering tower climbing, falls, RF exposure, completion and emergencies.

    छुट्टै पनि किन्न पाइन्छ
  6. Asbestos Awareness

    SWMS · कामका 4 चरण

    Asbestos Awareness SWMS: 4 job steps for identifying and reporting asbestos-containing materials and responding to accidental disturbance.

    छुट्टै पनि किन्न पाइन्छ
  7. Manual Handling

    SWMS · कामका 18 चरण

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    छुट्टै पनि किन्न पाइन्छ
  8. Refrigerant Gas

    SWMS · कामका 9 चरण

    SWMS for the safe use of fluorocarbon refrigerants: licensing, cylinder transport and storage, refrigerant recovery, inspection and emergency response.

    छुट्टै पनि किन्न पाइन्छ
  9. Confined Space Work

    SWMS · कामका 10 चरण

    A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.

    छुट्टै पनि किन्न पाइन्छ
  10. Mechanical Ventilation System

    SWMS · कामका 15 चरण

    Mechanical Ventilation System SWMS: 15 job steps for installing a commercial kitchen exhaust canopy or hood, from set-up to emergency response.

    छुट्टै पनि किन्न पाइन्छ
  11. Silica Dust

    SWMS · कामका 14 चरण

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    छुट्टै पनि किन्न पाइन्छ
  12. Duct Work Installation

    SWMS · कामका 11 चरण

    SWMS for installing ductwork for exhaust and air conditioning systems: site set-up, delivery, roof space work, tools, chemicals and emergencies.

    छुट्टै पनि किन्न पाइन्छ
  13. Cool Room Construction

    SWMS · कामका 18 चरण

    SWMS for building insulated cool room and freezer panels: set-up, working at height, cutting and lifting panels, mobile plant, completion and emergencies.

    छुट्टै पनि किन्न पाइन्छ
  14. Mobile Plant Working Near-Around

    SWMS · कामका 8 चरण

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    छुट्टै पनि किन्न पाइन्छ
  15. Height Access Equipment

    SWMS · कामका 17 चरण

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    छुट्टै पनि किन्न पाइन्छ
  16. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · कामका 12 चरण

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    छुट्टै पनि किन्न पाइन्छ
  17. Falls Emergency Rescue Plan

    व्यवस्थापन योजना · 14 खण्ड

    A pre-planned procedure for rescuing a worker who has fallen and is suspended in a harness, with a pre-planning checklist and a site-specific rescue plan.

    छुट्टै पनि किन्न पाइन्छ
  18. Air Conditioning Installation

    SWMS · कामका 16 चरण

    Covers installing, maintaining or repairing air conditioning units, with the risks and controls for each job step from planning to emergency response.

    छुट्टै पनि किन्न पाइन्छ
  19. Risers Working In

    SWMS · कामका 12 चरण

    Safe work method statement for working in risers, covering 12 job steps from rescue planning and entry assessment to falls, heat stress and emergencies.

    छुट्टै पनि किन्न पाइन्छ
  20. Confined Space Emergency Rescue Plan

    व्यवस्थापन योजना · 11 खण्ड

    A seven-step emergency rescue plan for confined spaces, with site details, assembly points, first aid officers and rescue equipment.

    छुट्टै पनि किन्न पाइन्छ
  21. Powered Non-powered Tools

    SWMS · कामका 12 चरण

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    छुट्टै पनि किन्न पाइन्छ
  22. Quality Project Management Plan

    व्यवस्थापन योजना · 16 खण्ड

    A Quality Project Management Plan covering scope, responsibilities, audits, non-conformances, inspection and testing, and change management, with forms and registers.

    छुट्टै पनि किन्न पाइन्छ
  23. Health and Wellbeing Module

    नीति · 6 खण्ड

    A health and wellbeing policy module covering fitness for work, psychosocial hazards, violence, harassment, drugs and alcohol, and fatigue.

    छुट्टै पनि किन्न पाइन्छ
  24. PPE Register

    फारम · 6 फिल्ड

    A register of the PPE issued to each worker, such as gloves, safety glasses and hi-vis vests, with issue and replacement dates and worker and manager signatures.

    छुट्टै पनि किन्न पाइन्छ
  25. Lock Out Tag Out - LOTO

    SOP · 9 खण्ड

    Lock out tag out (LOTO) procedure: isolate every energy source before maintenance, restore equipment to service, and assess the risks of the work.

    छुट्टै पनि किन्न पाइन्छ
  26. AS/NZS ISO 45001:2018 Internal Audit Checklist

    फारम · 16 फिल्ड

    A question-format checklist for auditing your OHS management system against the requirements of AS/NZS ISO 45001:2018.

    छुट्टै पनि किन्न पाइन्छ
  27. Quality Design Plan

    व्यवस्थापन योजना · 12 खण्ड

    A Quality Design Plan to manage the design process and control design output: roles, milestones, communication, verification and approval.

    छुट्टै पनि किन्न पाइन्छ
  28. Risk Assessment Form

    फारम · 8 फिल्ड

    Risk assessment form for the health and safety risks of an item or service before you buy it, with a risk matrix, the hierarchy of control and worked examples.

    यो प्रणालीमा मात्र
  29. Roles and Responsibilities Schedule

    फारम · 1 फिल्ड

    A schedule for one role: its title, responsibilities, who it reports to, its escalation path and the authority it holds.

    छुट्टै पनि किन्न पाइन्छ
  30. Return to Work Plan

    व्यवस्थापन योजना · 7 खण्ड

    A return to work plan for an injured worker: their details, the RTW goal, work restrictions, suitable duties, appointments and who agreed to it.

    यो प्रणालीमा मात्र
  31. Products Processes – Identification and Material Traceability

    फारम · 5 फिल्ड

    A register of products and processes with their identifier, name and location, for material identification and traceability.

    छुट्टै पनि किन्न पाइन्छ
  32. Environmental Incident and Corrective Action Report Form

    फारम · 23 फिल्ड

    A form to report an environmental incident, record the investigation and corrective actions, and sign off that they are complete.

    छुट्टै पनि किन्न पाइन्छ
  33. Disaster Recovery Plan

    व्यवस्थापन योजना · 9 खण्ड

    A Disaster Recovery Plan to prepare for disasters and accidents, with policy, procedure, responsibilities, a plan template and supporting forms.

    छुट्टै पनि किन्न पाइन्छ
  34. Meeting and Toolbox Talk Record

    फारम · 8 फिल्ड

    A toolbox talk and safety meeting record: attendees and signatures, the agenda, safety topics discussed, comments and the actions that follow.

    छुट्टै पनि किन्न पाइन्छ
  35. Corrective and Preventative Actions Form

    फारम · 9 फिल्ड

    Record a corrective or preventative action: the issue and its seriousness, the evaluation, the action, who is responsible and the manager's sign-off.

    छुट्टै पनि किन्न पाइन्छ
  36. Emergency Response Plan

    व्यवस्थापन योजना · 25 खण्ड

    An Emergency Response Plan so workers know what to do in an emergency: evacuation, fire, first aid, spills, threats and bomb threats, with registers and checklists.

    छुट्टै पनि किन्न पाइन्छ
  37. Annual Audit Schedule

    फारम · 1 फिल्ड

    A month-by-month schedule for planning safety, environmental or quality audits across the year, with a legend for planned and postponed audits.

    छुट्टै पनि किन्न पाइन्छ
  38. Monitoring Register

    फारम · 7 फिल्ड

    A register of the system items that need monitoring: responsibility, legislation, frequency, record retention period and comments.

    छुट्टै पनि किन्न पाइन्छ
  39. AS/NZS ISO 14001:2016 Internal Audit Checklist

    फारम · 29 फिल्ड

    An internal audit checklist for assessing your environmental management system against the requirements of AS/NZS ISO 14001:2016.

    छुट्टै पनि किन्न पाइन्छ
  40. Monitoring and Measurement Schedule

    फारम · 3 फिल्ड

    A register of what is monitored and measured: the location, the responsible person or position, and the date or time of each check.

    छुट्टै पनि किन्न पाइन्छ
  41. Incident Register

    फारम · 10 फिल्ड

    A register to record workplace incidents and near misses: when and where, what happened, who was involved, severity, status and the corrective actions taken.

    छुट्टै पनि किन्न पाइन्छ
  42. Interested Parties Register

    फारम · 5 फिल्ड

    A register of interested parties: who they are, what they need and expect, your objectives for each and their priority.

    छुट्टै पनि किन्न पाइन्छ
  43. Infrastructure Responsibilities Register

    फारम · 2 फिल्ड

    Register that lists the departments and people responsible for infrastructure use and maintenance, and the infrastructure each looks after.

    छुट्टै पनि किन्न पाइन्छ
  44. Worker Training and Induction Register

    फारम · 10 फिल्ड

    A register of the training and competencies each worker has completed, their licences and expiry dates, and whether they have been correctly inducted.

    छुट्टै पनि किन्न पाइन्छ
  45. Emergency Drill Report

    फारम · 4 खण्ड

    A form for reporting the outcome of an emergency drill: participants, simulation, problems found and corrective action.

    छुट्टै पनि किन्न पाइन्छ
  46. Construction Hazardous Works Module

    नीति · 12 खण्ड

    Seven hazardous works modules for construction projects, with hazard checklists, registers, rescue plans and an excavation inspection checklist.

    छुट्टै पनि किन्न पाइन्छ
  47. Quarterly Objective and Targets Report

    फारम · 7 फिल्ड

    A quarterly register for reporting results against your key objectives and targets at the end of March, June, September and December.

    छुट्टै पनि किन्न पाइन्छ
  48. Test Protocols

    फारम · 4 फिल्ड

    A register of test protocols: each protocol's number and name, its date of issue and the date it is due for review.

    छुट्टै पनि किन्न पाइन्छ
  49. Emergency Response Register

    फारम · 6 फिल्ड

    A register of a site's emergency response procedures: whether each is in place, its document, version and responsible person.

    छुट्टै पनि किन्न पाइन्छ
  50. Operations-Processes – Identification Form

    फारम · 3 फिल्ड

    A register for listing the operations and processes an organisation carries out, with an identifier and the location of each.

    छुट्टै पनि किन्न पाइन्छ
  51. Management Review Meeting Report IMS

    फारम · 6 फिल्ड

    An integrated management system review meeting report: attendance, agenda, ten review items for quality, safety and environment, and follow-up.

    छुट्टै पनि किन्न पाइन्छ
  52. Inspection Test Plan

    व्यवस्थापन योजना · 2 खण्ड

    A blank inspection test plan to record activities, test methods, acceptance criteria, records and inspections, with approval and review sign-off.

    छुट्टै पनि किन्न पाइन्छ
  53. Chemical & SDS Register

    फारम · 13 फिल्ड

    Keep a list of the hazardous substances and dangerous goods at your workplace, with their GHS and DG classification, SDS date, quantities, placards and manifests.

    छुट्टै पनि किन्न पाइन्छ
  54. Verification of Competency Record

    फारम · 25 फिल्ड

    A form for recording a worker's verification of competency: worker, assessor and expert details, method, result and a checklist.

    छुट्टै पनि किन्न पाइन्छ
  55. Operational Control Register

    फारम · 7 फिल्ड

    A register of the documented operational controls for your processes: whether each is in place, its procedure, version and responsible person.

    छुट्टै पनि किन्न पाइन्छ
  56. Trades IMS Manual

    व्यवस्थापन योजना · 13 खण्ड

    An integrated management system manual for trades covering health, safety, environmental and quality to ISO 45001, 14001 and 9001.

    छुट्टै पनि किन्न पाइन्छ
  57. Incident Report Form

    फारम · 28 फिल्ड

    Record a workplace incident, injury, near miss or property damage: what happened, who was involved, notifying the regulator, and the investigation that follows.

    छुट्टै पनि किन्न पाइन्छ
  58. Plant and Equipment Register

    फारम · 13 फिल्ड

    Record the maintenance requirements and history of all plant and equipment, and whether each item needs a licence to operate or registration with the regulator.

    छुट्टै पनि किन्न पाइन्छ
  59. HSEQ Procurement Implementation Guide

    नीति · 6 खण्ड

    A guide to applying the integrated HSEQ procurement procedure: factors to weigh, tailoring, responsibilities and a seven-step process.

    छुट्टै पनि किन्न पाइन्छ
  60. Training Needs Register

    फारम · 8 फिल्ड

    Training needs register recording each role's responsibilities, required qualifications and competencies, training needs, dates and course details.

    छुट्टै पनि किन्न पाइन्छ
  61. Asbestos Register

    फारम · 17 फिल्ड

    An asbestos register for the workplace: who is responsible, whether asbestos is present, and each item's type, condition and location.

    छुट्टै पनि किन्न पाइन्छ
  62. Induction Checklist

    फारम · 6 फिल्ड

    An induction checklist that ensures essential safety topics are covered for new workers and visitors, from site rules and emergencies to PPE and SWMS.

    छुट्टै पनि किन्न पाइन्छ
  63. Operational Control Development Worksheet

    फारम · 11 फिल्ड

    A worksheet for assessing documented controls: which procedures are in place, which need updating and which new documents are required.

    छुट्टै पनि किन्न पाइन्छ
  64. Corrective-Preventative Actions Register

    फारम · 7 फिल्ड

    Register to record the corrective and preventative actions to be taken from raised issues, with due dates, status and completion.

    छुट्टै पनि किन्न पाइन्छ
  65. Injuries/Illness Register

    फारम · 10 फिल्ड

    Register to record workplace injuries and illnesses, with the incident type, category and corrective actions taken.

    छुट्टै पनि किन्न पाइन्छ
  66. Workplace Inspection Checklist

    फारम · 5 फिल्ड

    A checklist for safety officers to inspect the workplace, from emergency management and first aid to machinery, chemicals, electrical safety and housekeeping.

    छुट्टै पनि किन्न पाइन्छ
  67. SOP Template

    फारम · 9 फिल्ड

    A Standard/Safe Operating Procedure (SOP) template for writing step-by-step procedures specific to your business tasks.

    छुट्टै पनि किन्न पाइन्छ
  68. Outsourced Process Register

    फारम · 9 फिल्ड

    A register for assessing outsourced processes: customer requirements, your requirements, validation and verification for each outsource company.

    छुट्टै पनि किन्न पाइन्छ
  69. First Aid Worker Register

    फारम · 8 फिल्ड

    A register of your first aid officers: who manages the first aid kit, each officer's location and contact details, and their qualifications and expiry dates.

    छुट्टै पनि किन्न पाइन्छ
  70. Compliance Evaluation Report

    फारम · 11 फिल्ड

    A compliance evaluation report for checking legislation, codes of practice and standards across health and safety, environmental and quality.

    छुट्टै पनि किन्न पाइन्छ
  71. Health Surveillance Record

    फारम · 13 फिल्ड

    A register of each worker's occupational exposures, the health surveillance required, the examiner's recommendation and the follow up completed.

    छुट्टै पनि किन्न पाइन्छ
  72. High Risk Licence Table & Checklist

    फारम · 2 खण्ड

    A checklist and table of high-risk work licences and classes, to confirm which on-site activities need a licensed worker.

    छुट्टै पनि किन्न पाइन्छ
  73. Organisation Chart

    फारम · 5 खण्ड

    An organisation chart naming who holds each safety role, from the PCBU, owner or CEO through senior management and the health and safety team to workers.

    यो प्रणालीमा मात्र
  74. Isolation Permit to Work

    फारम · 13 फिल्ड

    A permit for the safe isolation of plant and equipment during maintenance, cleaning or repairs, with sign-offs and priority release.

    छुट्टै पनि किन्न पाइन्छ
  75. Training Skills Responsibilities Register

    फारम · 8 फिल्ड

    A register of roles, responsibilities, required competencies and training needs, with training dates, course details and comments.

    छुट्टै पनि किन्न पाइन्छ
  76. Objectives Summary Form

    फारम · 7 फिल्ड

    A form for management to record an objective, its background, target and the resources required, with the responsible person's sign-off.

    छुट्टै पनि किन्न पाइन्छ
  77. Supplier Evaluation Scorecard IMS

    फारम · 11 फिल्ड

    Supplier scorecard to rate HSEQ management, performance, procurement and subcontractor criteria from 1 to 5 and record an approval decision.

    छुट्टै पनि किन्न पाइन्छ
  78. Work Groups Register

    फारम · 8 फिल्ड

    A register for keeping track of workplace work groups, their locations, members and health and safety representatives.

    छुट्टै पनि किन्न पाइन्छ
  79. Document Register

    फारम · 14 फिल्ड

    A register of the documents your organisation holds: numbers, versions, titles, purpose, author, key dates and approvals, for version control.

    छुट्टै पनि किन्न पाइन्छ
  80. Risk Register

    फारम · 8 फिल्ड

    A form to record identified hazards and risk levels in the workplace, with current controls and recommended actions for uncontrolled risks.

    छुट्टै पनि किन्न पाइन्छ
  81. Objectives and Targets Register

    फारम · 5 फिल्ड

    A register of key objectives and targets, each with its performance metric and the person or area responsible.

    छुट्टै पनि किन्न पाइन्छ
  82. Chemical Risk Assessment Form

    फारम · 28 फिल्ड

    A form to assess the risks of a hazardous chemical, rate them with a matrix and record the controls needed to protect workers.

    छुट्टै पनि किन्न पाइन्छ
  83. Verification of Requirements Checklist IMS

    फारम · 18 फिल्ड

    A checklist to verify delivered goods or services meet HSEQ requirements: procurement details, a verification table, overall result and approvals.

    छुट्टै पनि किन्न पाइन्छ
  84. Chemical Manifest

    फारम · 17 फिल्ड

    Chemical manifest to record the bulk and packaged hazardous chemicals on site, with a site plan, its legend and the emergency contacts.

    छुट्टै पनि किन्न पाइन्छ
  85. Change Request Form

    फारम · 16 फिल्ड

    A form to detail and record a request for a change to systems or processes, with the change manager's initial risk analysis.

    छुट्टै पनि किन्न पाइन्छ
  86. Customer Complaints Form

    फारम · 18 फिल्ड

    A form for recording customer complaints, with an internal section for action, follow-up, outcome and sign-off.

    छुट्टै पनि किन्न पाइन्छ
  87. Worker Training Record

    फारम · 10 फिल्ड

    A record of one worker's training in one course: who approved it, start and completion dates, description, expected outcomes and training type.

    छुट्टै पनि किन्न पाइन्छ
  88. AS/NZS ISO 9001:2016 Internal Audit Checklist

    फारम · 41 फिल्ड

    A checklist for self-assessing your quality management system against AS/NZS ISO 9001:2016, with audit guidance, scope, auditors and space for findings.

    छुट्टै पनि किन्न पाइन्छ
  89. Electrical Equipment Register

    फारम · 8 फिल्ड

    A register for the testing and tagging of plug-in electrical equipment in the workplace: test dates and types, results, the next test due and management sign-off.

    छुट्टै पनि किन्न पाइन्छ
  90. Environmental Control Plan

    व्यवस्थापन योजना · 7 खण्ड

    An Environmental Control Plan covering policy, responsibilities, risk control, and air, chemicals, waste, energy and water management.

    छुट्टै पनि किन्न पाइन्छ
  91. Product Approval Checklist

    फारम · 8 फिल्ड

    A checklist for approving a design for release: project details, component sign-off with Yes and No tick boxes, and an approval signature.

    छुट्टै पनि किन्न पाइन्छ
  92. Internal Audit Plan

    व्यवस्थापन योजना · 5 खण्ड

    An Internal Audit Plan to set the audit's subject, scope, objectives, team and criteria, so audits are conducted efficiently and effectively.

    छुट्टै पनि किन्न पाइन्छ
  93. Roles, Responsibilities, Accountabilities and Authorities Register

    फारम · 6 फिल्ड

    A register of position holders: role type, name, who they report to, delegated authority and tenure dates, for defining responsibility and accountability.

    छुट्टै पनि किन्न पाइन्छ
  94. Supplier Questionnaire IMS

    फारम · 4 फिल्ड

    A questionnaire for suppliers to describe their HSEQ management system, performance, policies and subcontractor controls.

    छुट्टै पनि किन्न पाइन्छ
  95. Hazard Report Form

    फारम · 14 फिल्ड

    Hazard report form for workers to record a hazard, its exact location, when it was found and the recommended action, before it causes an incident.

    छुट्टै पनि किन्न पाइन्छ
  96. Worker Competency Register

    फारम · 10 फिल्ड

    A register of worker competency assessments: position or tasks, assessor, method, licences held, outcome and actions taken.

    छुट्टै पनि किन्न पाइन्छ
  97. Quality Incident and Corrective Action Report Form

    फारम · 26 फिल्ड

    A quality incident and corrective action report: incident details, witnesses, investigation, root cause, preventative actions and sign-off.

    छुट्टै पनि किन्न पाइन्छ
  98. Project Acceptance Criteria

    फारम · 7 फिल्ड

    A project acceptance criteria form: the criteria each deliverable must meet before acceptance, and a milestones table with planned dates.

    छुट्टै पनि किन्न पाइन्छ
  99. Communications Program Schedule

    फारम · 5 फिल्ड

    Register of the communication protocols and timings with internal and external stakeholders, for workers, customers, regulators and contractors.

    छुट्टै पनि किन्न पाइन्छ
  100. Internal Audit Report

    फारम · 11 फिल्ड

    Helps auditors give management clear, objective and impartial information about what is going well and what needs to be improved.

    छुट्टै पनि किन्न पाइन्छ
  101. Competency Mapping Register

    फारम · 5 फिल्ड

    A register of the skills, knowledge, qualifications and experience each role or task requires, with worked examples.

    छुट्टै पनि किन्न पाइन्छ
  102. Disaster Recovery Response Register

    फारम · 8 फिल्ड

    A register of operations and activities, with whether an emergency recovery procedure is in place, its document, version and responsible person.

    छुट्टै पनि किन्न पाइन्छ
  103. Working Alone Communication Log

    फारम · 28 फिल्ड

    A communication log for workers working alone in remote or isolated areas: contacts, agreed call-in times, a call-in log and emergency actions.

    छुट्टै पनि किन्न पाइन्छ
  104. Non-Conformance Report

    फारम · 12 फिल्ड

    A report to document and address deviations from project specifications or quality standards, with corrective, preventative and monitoring actions.

    छुट्टै पनि किन्न पाइन्छ
  105. Audiometric Testing Record

    फारम · 9 फिल्ड

    A record of workers' hearing tests to help manage the risk of noise-induced hearing loss: test dates, results, further action and the next test.

    छुट्टै पनि किन्न पाइन्छ
  106. Remote and Isolated Work Plan

    व्यवस्थापन योजना · 7 खण्ड

    A plan for each remote or isolated trip: who goes and how to reach them, the risk assessment, high-risk work and items to take, call-in times and emergency actions.

    छुट्टै पनि किन्न पाइन्छ
  107. Monitoring and Measuring Equipment Register

    फारम · 5 फिल्ड

    A register of monitoring and measuring equipment: identifier, name, procedure, and the dates of the last and next calibration or service.

    छुट्टै पनि किन्न पाइन्छ
  108. Compliance Requirements Register

    फारम · 3 फिल्ड

    A register of the regulatory and internal compliance requirements that apply to each process or function, with the legislation and a description.

    छुट्टै पनि किन्न पाइन्छ
  109. Complaints Register

    फारम · 11 फिल्ड

    A complaints register to log each complaint, the customer's details, the product affected, who is responsible and its status.

    छुट्टै पनि किन्न पाइन्छ
  110. Measuring and Calibration Register

    फारम · 5 फिल्ड

    A register of measuring and monitoring equipment with its procedure and the dates of last and next calibration or service.

    छुट्टै पनि किन्न पाइन्छ
  111. Procurement Request Form IMS

    फारम · 15 फिल्ड

    An internal request to buy goods or services, covering hazards, requirements, controls, supplier capability, risk level and sign-off.

    छुट्टै पनि किन्न पाइन्छ
  112. Hand Tools

    SOP · 9 खण्ड

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    छुट्टै पनि किन्न पाइन्छ
  113. Oxy-Acetylene Welding

    SOP · 9 खण्ड

    Safe operating procedure for oxy-acetylene welding: hazards, PPE, training, pre-operational inspection, step-by-step operation and a register.

    छुट्टै पनि किन्न पाइन्छ
  114. Handheld Power Tools

    SOP · 9 खण्ड

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    छुट्टै पनि किन्न पाइन्छ
  115. Cherry Picker

    SOP · 10 खण्ड

    Safe operating procedure for a cherry picker: hazards, PPE, inspection, function tests, operation, emergency response and a hazard checklist.

    छुट्टै पनि किन्न पाइन्छ
  116. Scissor Lift

    SOP · 10 खण्ड

    Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.

    छुट्टै पनि किन्न पाइन्छ
  117. Extension Ladder

    SOP · 7 खण्ड

    Extension ladder safe operating procedure: hazards, pre-use inspection, transporting, set-up, use and carrying, with a training register.

    छुट्टै पनि किन्न पाइन्छ
  118. Refrigerant Gases

    SOP · 12 खण्ड

    Safe operating procedure for refrigerant gases: hazards, PPE, tank transport, handling, storage, filling and maintenance, with a training register.

    छुट्टै पनि किन्न पाइन्छ
  119. Manual Handling

    SOP · 5 खण्ड

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    छुट्टै पनि किन्न पाइन्छ
  120. Psychosocial Hazards Management Plan

    व्यवस्थापन योजना · 4 खण्ड

    A plan to manage and prevent psychosocial hazards at work, with policies, procedures, a risk assessment checklist and incident report forms.

    छुट्टै पनि किन्न पाइन्छ
  121. Workplace Sexual and Gender-Based Harassment Prevention Plan

    व्यवस्थापन योजना · 11 खण्ड

    A prevention plan for sexual and gender-based harassment, with a policy, risk assessment, complaint process, incident report form and checklist.

    छुट्टै पनि किन्न पाइन्छ
  122. Workplace Fatigue Management Plan

    व्यवस्थापन योजना · 6 खण्ड

    A workplace fatigue management plan with a policy, responsibilities, risk assessment, shift design guidelines and fatigue, driver and hours forms.

    छुट्टै पनि किन्न पाइन्छ
  123. Workplace Violence Report Form

    फारम · 22 फिल्ड

    A form to record a workplace violence incident: the people involved, a description, witnesses and follow-up such as a police report.

    छुट्टै पनि किन्न पाइन्छ
  124. PH Incident Report Form

    फारम · 22 फिल्ड

    An incident report form for recording a behaviour or incident, the people involved, witnesses and follow-up, with informal and formal complaint steps.

    छुट्टै पनि किन्न पाइन्छ
  125. DV Workplace Safety Plan

    व्यवस्थापन योजना · 2 खण्ड

    A plan to support a worker affected by domestic violence, with contact details, safety measures and a short risk assessment to fill in.

    छुट्टै पनि किन्न पाइन्छ
  126. Psychosocial Risk Assessment Checklist

    फारम · 25 खण्ड

    A psychosocial risk assessment checklist of 113 questions in 24 hazard groups, with a line for current controls and possible solutions under each question.

    यो प्रणालीमा मात्र

यसले के समेट्छ

यसले समेट्ने खतराहरू

यसले सन्दर्भ गर्ने कानुन र मापदण्डहरू

हरेक SWMS सँग हाम्रो कानुन र अभ्यास संहिताको सन्दर्भ सूची आउँछ।

प्रणाली कसरी एकअर्कासँग जोडिन्छ

हरेक कागजातले आफू भर परेका कागजातहरू देखाउँछ, नियम तोक्ने योजनादेखि टोलीले सोही दिन गर्ने कामसम्म।

व्यवस्थापन योजनाहरू

Falls Emergency Rescue Plan14 खण्डछुट्टै पनि किन्न पाइन्छConfined Space Emergency Rescue Plan11 खण्डछुट्टै पनि किन्न पाइन्छQuality Project Management Plan16 खण्डछुट्टै पनि किन्न पाइन्छQuality Design Plan12 खण्डछुट्टै पनि किन्न पाइन्छReturn to Work Plan7 खण्डयो प्रणालीमा मात्रDisaster Recovery Plan9 खण्डछुट्टै पनि किन्न पाइन्छEmergency Response Plan25 खण्डFalls Emergency Rescue Plan, Risk Assessment Form, Incident Report Form लाई सन्दर्भ गर्छछुट्टै पनि किन्न पाइन्छInspection Test Plan2 खण्डछुट्टै पनि किन्न पाइन्छTrades IMS Manual13 खण्डछुट्टै पनि किन्न पाइन्छEnvironmental Control Plan7 खण्डछुट्टै पनि किन्न पाइन्छInternal Audit Plan5 खण्डछुट्टै पनि किन्न पाइन्छRemote and Isolated Work Plan7 खण्डछुट्टै पनि किन्न पाइन्छPsychosocial Hazards Management Plan4 खण्डछुट्टै पनि किन्न पाइन्छWorkplace Sexual and Gender-Based Harassment Prevention Plan11 खण्डछुट्टै पनि किन्न पाइन्छWorkplace Fatigue Management Plan6 खण्डछुट्टै पनि किन्न पाइन्छDV Workplace Safety Plan2 खण्डछुट्टै पनि किन्न पाइन्छ

SWMS

Cool Room Repairकामका 16 चरणछुट्टै पनि किन्न पाइन्छRefrigerationकामका 18 चरणछुट्टै पनि किन्न पाइन्छAir Conditioning Service and Repairsकामका 14 चरणछुट्टै पनि किन्न पाइन्छMaterials Duct Lifterकामका 6 चरणछुट्टै पनि किन्न पाइन्छWorking On/Near Telecommunications Towersकामका 8 चरणछुट्टै पनि किन्न पाइन्छAsbestos Awarenessकामका 4 चरणछुट्टै पनि किन्न पाइन्छManual Handlingकामका 18 चरणछुट्टै पनि किन्न पाइन्छRefrigerant Gasकामका 9 चरणछुट्टै पनि किन्न पाइन्छConfined Space Workकामका 10 चरणछुट्टै पनि किन्न पाइन्छMechanical Ventilation Systemकामका 15 चरणछुट्टै पनि किन्न पाइन्छSilica Dustकामका 14 चरणछुट्टै पनि किन्न पाइन्छDuct Work Installationकामका 11 चरणछुट्टै पनि किन्न पाइन्छCool Room Constructionकामका 18 चरणछुट्टै पनि किन्न पाइन्छMobile Plant Working Near-Aroundकामका 8 चरणछुट्टै पनि किन्न पाइन्छHeight Access Equipmentकामका 17 चरणछुट्टै पनि किन्न पाइन्छEWP, Boom, Cherry Picker and Scissor Liftकामका 12 चरणछुट्टै पनि किन्न पाइन्छAir Conditioning Installationकामका 16 चरणछुट्टै पनि किन्न पाइन्छRisers Working Inकामका 12 चरणछुट्टै पनि किन्न पाइन्छPowered Non-powered Toolsकामका 12 चरणछुट्टै पनि किन्न पाइन्छ

फारम, रजिस्टर र चेकलिस्टहरू

PPE Register6 फिल्डछुट्टै पनि किन्न पाइन्छAS/NZS ISO 45001:2018 Internal Audit Checklist16 फिल्डछुट्टै पनि किन्न पाइन्छRisk Assessment Form8 फिल्डयो प्रणालीमा मात्रRoles and Responsibilities Schedule1 फिल्डछुट्टै पनि किन्न पाइन्छProducts Processes – Identification and Material Traceability5 फिल्डछुट्टै पनि किन्न पाइन्छEnvironmental Incident and Corrective Action Report Form23 फिल्डछुट्टै पनि किन्न पाइन्छMeeting and Toolbox Talk Record8 फिल्डHazard Report Form लाई सन्दर्भ गर्छछुट्टै पनि किन्न पाइन्छCorrective and Preventative Actions Form9 फिल्डछुट्टै पनि किन्न पाइन्छAnnual Audit Schedule1 फिल्डछुट्टै पनि किन्न पाइन्छMonitoring Register7 फिल्डछुट्टै पनि किन्न पाइन्छAS/NZS ISO 14001:2016 Internal Audit Checklist29 फिल्डछुट्टै पनि किन्न पाइन्छMonitoring and Measurement Schedule3 फिल्डछुट्टै पनि किन्न पाइन्छIncident Register10 फिल्डछुट्टै पनि किन्न पाइन्छInterested Parties Register5 फिल्डछुट्टै पनि किन्न पाइन्छInfrastructure Responsibilities Register2 फिल्डछुट्टै पनि किन्न पाइन्छWorker Training and Induction Register10 फिल्डछुट्टै पनि किन्न पाइन्छEmergency Drill Report4 खण्डछुट्टै पनि किन्न पाइन्छQuarterly Objective and Targets Report7 फिल्डछुट्टै पनि किन्न पाइन्छTest Protocols4 फिल्डछुट्टै पनि किन्न पाइन्छEmergency Response Register6 फिल्डछुट्टै पनि किन्न पाइन्छOperations-Processes – Identification Form3 फिल्डछुट्टै पनि किन्न पाइन्छManagement Review Meeting Report IMS6 फिल्डछुट्टै पनि किन्न पाइन्छChemical & SDS Register13 फिल्डछुट्टै पनि किन्न पाइन्छVerification of Competency Record25 फिल्डछुट्टै पनि किन्न पाइन्छOperational Control Register7 फिल्डछुट्टै पनि किन्न पाइन्छIncident Report Form28 फिल्डछुट्टै पनि किन्न पाइन्छPlant and Equipment Register13 फिल्डछुट्टै पनि किन्न पाइन्छTraining Needs Register8 फिल्डOrganisation Chart लाई सन्दर्भ गर्छछुट्टै पनि किन्न पाइन्छAsbestos Register17 फिल्डछुट्टै पनि किन्न पाइन्छInduction Checklist6 फिल्डछुट्टै पनि किन्न पाइन्छOperational Control Development Worksheet11 फिल्डछुट्टै पनि किन्न पाइन्छCorrective-Preventative Actions Register7 फिल्डछुट्टै पनि किन्न पाइन्छInjuries/Illness Register10 फिल्डछुट्टै पनि किन्न पाइन्छWorkplace Inspection Checklist5 फिल्डछुट्टै पनि किन्न पाइन्छSOP Template9 फिल्डछुट्टै पनि किन्न पाइन्छOutsourced Process Register9 फिल्डछुट्टै पनि किन्न पाइन्छFirst Aid Worker Register8 फिल्डछुट्टै पनि किन्न पाइन्छCompliance Evaluation Report11 फिल्डछुट्टै पनि किन्न पाइन्छHealth Surveillance Record13 फिल्डछुट्टै पनि किन्न पाइन्छHigh Risk Licence Table & Checklist2 खण्डछुट्टै पनि किन्न पाइन्छOrganisation Chart5 खण्डयो प्रणालीमा मात्रIsolation Permit to Work13 फिल्डछुट्टै पनि किन्न पाइन्छTraining Skills Responsibilities Register8 फिल्डछुट्टै पनि किन्न पाइन्छObjectives Summary Form7 फिल्डछुट्टै पनि किन्न पाइन्छSupplier Evaluation Scorecard IMS11 फिल्डछुट्टै पनि किन्न पाइन्छWork Groups Register8 फिल्डछुट्टै पनि किन्न पाइन्छDocument Register14 फिल्डछुट्टै पनि किन्न पाइन्छRisk Register8 फिल्डछुट्टै पनि किन्न पाइन्छObjectives and Targets Register5 फिल्डछुट्टै पनि किन्न पाइन्छChemical Risk Assessment Form28 फिल्डछुट्टै पनि किन्न पाइन्छVerification of Requirements Checklist IMS18 फिल्डछुट्टै पनि किन्न पाइन्छChemical Manifest17 फिल्डछुट्टै पनि किन्न पाइन्छChange Request Form16 फिल्डछुट्टै पनि किन्न पाइन्छCustomer Complaints Form18 फिल्डछुट्टै पनि किन्न पाइन्छWorker Training Record10 फिल्डछुट्टै पनि किन्न पाइन्छAS/NZS ISO 9001:2016 Internal Audit Checklist41 फिल्डछुट्टै पनि किन्न पाइन्छElectrical Equipment Register8 फिल्डछुट्टै पनि किन्न पाइन्छProduct Approval Checklist8 फिल्डछुट्टै पनि किन्न पाइन्छRoles, Responsibilities, Accountabilities and Authorities Register6 फिल्डछुट्टै पनि किन्न पाइन्छSupplier Questionnaire IMS4 फिल्डछुट्टै पनि किन्न पाइन्छHazard Report Form14 फिल्डIncident Report Form लाई सन्दर्भ गर्छछुट्टै पनि किन्न पाइन्छWorker Competency Register10 फिल्डछुट्टै पनि किन्न पाइन्छQuality Incident and Corrective Action Report Form26 फिल्डछुट्टै पनि किन्न पाइन्छProject Acceptance Criteria7 फिल्डछुट्टै पनि किन्न पाइन्छCommunications Program Schedule5 फिल्डछुट्टै पनि किन्न पाइन्छInternal Audit Report11 फिल्डछुट्टै पनि किन्न पाइन्छCompetency Mapping Register5 फिल्डछुट्टै पनि किन्न पाइन्छDisaster Recovery Response Register8 फिल्डछुट्टै पनि किन्न पाइन्छWorking Alone Communication Log28 फिल्डछुट्टै पनि किन्न पाइन्छNon-Conformance Report12 फिल्डछुट्टै पनि किन्न पाइन्छAudiometric Testing Record9 फिल्डछुट्टै पनि किन्न पाइन्छMonitoring and Measuring Equipment Register5 फिल्डछुट्टै पनि किन्न पाइन्छCompliance Requirements Register3 फिल्डछुट्टै पनि किन्न पाइन्छComplaints Register11 फिल्डछुट्टै पनि किन्न पाइन्छMeasuring and Calibration Register5 फिल्डछुट्टै पनि किन्न पाइन्छProcurement Request Form IMS15 फिल्डछुट्टै पनि किन्न पाइन्छWorkplace Violence Report Form22 फिल्डछुट्टै पनि किन्न पाइन्छPH Incident Report Form22 फिल्डछुट्टै पनि किन्न पाइन्छPsychosocial Risk Assessment Checklist25 खण्डयो प्रणालीमा मात्र

समीक्षाहरू

अहिलेसम्म कुनै समीक्षा छैन।

टेम्प्लेटहरू कसरी काम गर्छन्

यसलाई पैसा तिर्नुअघि नै चलाएर हेर्नुहोस्।

  1. निःशुल्क पूर्वावलोकन

    हरेक टेम्प्लेटका कामका चरण, खतरा र पहिलो काम पढ्न खुला छन्। साइन अप चाहिँदैन।

  2. एडिटर चलाएर हेर्नुहोस्

    कम्प्युटर वा फोनमा, डेमो SWMS लाई आफ्नो कम्पनी, काम र साइटअनुसार मिलाउनुहोस्।

  3. निःशुल्क साइन अप गर्नुहोस्

    तपाईंको विवरण र लोगो सर्छन्। यो टेम्प्लेट विवरण भरिएरै खुल्छ।

  4. क्रेडिट प्रयोग गर्नुहोस् वा एकपटक किन्नुहोस्

    सशुल्क प्लानहरूमा हरेक महिना टेम्प्लेट क्रेडिट आउँछ। वा सधैँका लागि यो एउटा किन्नुहोस्।