ਅਰਲੀ ਐਕਸੈਸ ਪੇਸ਼ਕਸ਼:ਅਰਲੀ ਐਕਸੈਸ: 30% ਛੋਟ, ਜਦੋਂ ਤੱਕ ਤੁਸੀਂ ਸਬਸਕ੍ਰਾਈਬ ਰਹਿੰਦੇ ਹੋ.

ਪੇਸ਼ਕਸ਼ ਲਓ

ਟੈਂਪਲੇਟ ਦਸਤਾਵੇਜ਼ ਅੰਗਰੇਜ਼ੀ ਵਿੱਚ ਲਿਖੇ ਹੋਏ ਹਨ।

ਸਿਸਟਮ · 101 ਦਸਤਾਵੇਜ਼

Crane Hire Integrated Industry Suite

ਸਿਸਟਮ · SYS-50523

Crane Hire Integrated Industry Suite ਸਿਸਟਮ ਟੈਂਪਲੇਟ ਦੀ ਝਲਕ
  • 101 ਦਸਤਾਵੇਜ਼
  • ਇੱਕੋ ਲਾਇਬ੍ਰੇਰੀ ਫੋਲਡਰ ਵਿੱਚ ਆਉਂਦਾ ਹੈ

A full set of safety documents for crane hire businesses and crane operators, from task-level procedures to a management system for the whole business.

The pack has eight SWMS covering mobile cranes, tower cranes, mini cranes, self-erecting cranes, truck-mounted cranes and dogging, and two SOPs including Lock Out Tag Out - LOTO and Manual Handling.

It also includes an integrated management system that meets ISO 45001, ISO 14001 and ISO 9001: over 90 plans, policies, forms, registers and checklists, including Quality Project Management Plan, AS/NZS ISO 45001:2018 Internal Audit Checklist and Health and Wellbeing Module.

The documents arrive together in one folder of your Library, and you get every update to each of them.

Crane Lift Plan ਦੀ ਝਲਕ

Crane Lift Plan

ਪ੍ਰਬੰਧਨ ਯੋਜਨਾVersion 2

Site Details

Job #
—
Project Name
[Job name]
Site Location
[Site address]
Lift Location (on-site)
—
Subcontractor name
—
Subcontractor Ph
—
Crane Company
—
Crane Company Ph
—

8 ਹੋਰ ਭਾਗ

  1. Plan Approval
  2. Authorised Personnel
  3. Critical Lift Criteria
  4. Crane details
  5. Load Details
  6. ਅਤੇ 3 ਹੋਰ

ਪੂਰਾ ਲਿਖਿਆ ਹੋਇਆ, ਤੁਹਾਡੇ ਕਾਰੋਬਾਰ ਦੇ ਵੇਰਵਿਆਂ ਲਈ ਤਿਆਰ।

ਇਸ ਤਰ੍ਹਾਂ ਝਲਕ ਵੇਖੋ

ਬ੍ਰਾਊਜ਼ਰ ਵਿੱਚ ਇਹ ਕਿਵੇਂ ਦਿਸਦਾ ਹੈ

ਇਹ ਸਿਸਟਮ ਲਓ

ਮੁਫ਼ਤ ਸਾਈਨ ਅੱਪ ਕਰੋ, ਫਿਰ ਚੁਣੋ ਕਿ ਤੁਸੀਂ ਇਹ ਕਿਵੇਂ ਲੈਣਾ ਚਾਹੁੰਦੇ ਹੋ। ਹਰ ਦਸਤਾਵੇਜ਼ ਤੁਹਾਡੀ ਲਾਇਬ੍ਰੇਰੀ ਵਿੱਚ, ਪੈਕ ਦੇ ਨਾਂ ਵਾਲੇ ਫੋਲਡਰ ਵਿੱਚ ਜਾਂਦਾ ਹੈ।

  • ਪੇਡ ਪਲਾਨਾਂ ਵਿੱਚ ਸ਼ਾਮਲ

    ਆਪਣੇ ਪਲਾਨ ਦੇ ਟੈਂਪਲੇਟ ਕ੍ਰੈਡਿਟ ਵਰਤੋ। ਇਸਦੀ ਕੀਮਤ 20 ਹੈ।

    ਪਲਾਨ ਅਤੇ ਕੀਮਤਾਂ ਦੀ ਤੁਲਨਾ ਕਰੋ
  • ਇੱਕ ਵਾਰ ਖ਼ਰੀਦੋ

    $999.90 ਇੱਕ ਵਾਰ ਭੁਗਤਾਨ, ਅਤੇ ਇਹ ਹਮੇਸ਼ਾ ਲਈ ਤੁਹਾਡਾ। ਮੁਫ਼ਤ ਪਲਾਨ 'ਤੇ ਵੀ ਚੱਲਦਾ ਹੈ।

ਸਾਈਨ ਅੱਪ ਲਈ ਕੋਈ ਕਾਰਡ ਨਹੀਂ ਚਾਹੀਦਾ। ਅਰਲੀ ਐਕਸੈਸ ਮੈਂਬਰਾਂ ਨੂੰ ਹਰ ਪਲਾਨ 'ਤੇ 30% ਛੋਟ ਮਿਲਦੀ ਹੈ।

ਕੀ ਸ਼ਾਮਲ ਹੈ

  1. Crane Lift Plan

    ਪ੍ਰਬੰਧਨ ਯੋਜਨਾ · 9 ਭਾਗ

    A Crane Lift Plan for planning each crane lift: critical lift criteria, crane, load and rigging details, safety requirements and a lift layout diagram.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  2. JSEA Template

    ਫ਼ਾਰਮ · 8 ਖਾਨੇ

    A Job Safety & Environmental Analysis (JSEA) form to complete before work starts on a new site or on arrival at the site each day.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  3. Quality Project Management Plan

    ਪ੍ਰਬੰਧਨ ਯੋਜਨਾ · 16 ਭਾਗ

    A Quality Project Management Plan covering scope, responsibilities, audits, non-conformances, inspection and testing, and change management, with forms and registers.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  4. Health and Wellbeing Module

    ਨੀਤੀ · 6 ਭਾਗ

    A health and wellbeing policy module covering fitness for work, psychosocial hazards, violence, harassment, drugs and alcohol, and fatigue.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  5. PPE Register

    ਫ਼ਾਰਮ · 6 ਖਾਨੇ

    A register of the PPE issued to each worker, such as gloves, safety glasses and hi-vis vests, with issue and replacement dates and worker and manager signatures.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  6. Lock Out Tag Out - LOTO

    SOP · 9 ਭਾਗ

    Lock out tag out (LOTO) procedure: isolate every energy source before maintenance, restore equipment to service, and assess the risks of the work.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  7. AS/NZS ISO 45001:2018 Internal Audit Checklist

    ਫ਼ਾਰਮ · 16 ਖਾਨੇ

    A question-format checklist for auditing your OHS management system against the requirements of AS/NZS ISO 45001:2018.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  8. Quality Design Plan

    ਪ੍ਰਬੰਧਨ ਯੋਜਨਾ · 12 ਭਾਗ

    A Quality Design Plan to manage the design process and control design output: roles, milestones, communication, verification and approval.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  9. Risk Assessment Form

    ਫ਼ਾਰਮ · 8 ਖਾਨੇ

    Risk assessment form for the health and safety risks of an item or service before you buy it, with a risk matrix, the hierarchy of control and worked examples.

    ਸਿਰਫ਼ ਇਸ ਸਿਸਟਮ ਵਿੱਚ
  10. Roles and Responsibilities Schedule

    ਫ਼ਾਰਮ · 1 ਖਾਨੇ

    A schedule for one role: its title, responsibilities, who it reports to, its escalation path and the authority it holds.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  11. Return to Work Plan

    ਪ੍ਰਬੰਧਨ ਯੋਜਨਾ · 7 ਭਾਗ

    A return to work plan for an injured worker: their details, the RTW goal, work restrictions, suitable duties, appointments and who agreed to it.

    ਸਿਰਫ਼ ਇਸ ਸਿਸਟਮ ਵਿੱਚ
  12. Products Processes – Identification and Material Traceability

    ਫ਼ਾਰਮ · 5 ਖਾਨੇ

    A register of products and processes with their identifier, name and location, for material identification and traceability.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  13. Environmental Incident and Corrective Action Report Form

    ਫ਼ਾਰਮ · 23 ਖਾਨੇ

    A form to report an environmental incident, record the investigation and corrective actions, and sign off that they are complete.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  14. Disaster Recovery Plan

    ਪ੍ਰਬੰਧਨ ਯੋਜਨਾ · 9 ਭਾਗ

    A Disaster Recovery Plan to prepare for disasters and accidents, with policy, procedure, responsibilities, a plan template and supporting forms.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  15. Meeting and Toolbox Talk Record

    ਫ਼ਾਰਮ · 8 ਖਾਨੇ

    A toolbox talk and safety meeting record: attendees and signatures, the agenda, safety topics discussed, comments and the actions that follow.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  16. Corrective and Preventative Actions Form

    ਫ਼ਾਰਮ · 9 ਖਾਨੇ

    Record a corrective or preventative action: the issue and its seriousness, the evaluation, the action, who is responsible and the manager's sign-off.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  17. Emergency Response Plan

    ਪ੍ਰਬੰਧਨ ਯੋਜਨਾ · 25 ਭਾਗ

    An Emergency Response Plan so workers know what to do in an emergency: evacuation, fire, first aid, spills, threats and bomb threats, with registers and checklists.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  18. Annual Audit Schedule

    ਫ਼ਾਰਮ · 1 ਖਾਨੇ

    A month-by-month schedule for planning safety, environmental or quality audits across the year, with a legend for planned and postponed audits.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  19. Monitoring Register

    ਫ਼ਾਰਮ · 7 ਖਾਨੇ

    A register of the system items that need monitoring: responsibility, legislation, frequency, record retention period and comments.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  20. AS/NZS ISO 14001:2016 Internal Audit Checklist

    ਫ਼ਾਰਮ · 29 ਖਾਨੇ

    An internal audit checklist for assessing your environmental management system against the requirements of AS/NZS ISO 14001:2016.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  21. Monitoring and Measurement Schedule

    ਫ਼ਾਰਮ · 3 ਖਾਨੇ

    A register of what is monitored and measured: the location, the responsible person or position, and the date or time of each check.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  22. Incident Register

    ਫ਼ਾਰਮ · 10 ਖਾਨੇ

    A register to record workplace incidents and near misses: when and where, what happened, who was involved, severity, status and the corrective actions taken.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  23. Interested Parties Register

    ਫ਼ਾਰਮ · 5 ਖਾਨੇ

    A register of interested parties: who they are, what they need and expect, your objectives for each and their priority.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  24. Infrastructure Responsibilities Register

    ਫ਼ਾਰਮ · 2 ਖਾਨੇ

    Register that lists the departments and people responsible for infrastructure use and maintenance, and the infrastructure each looks after.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  25. Worker Training and Induction Register

    ਫ਼ਾਰਮ · 10 ਖਾਨੇ

    A register of the training and competencies each worker has completed, their licences and expiry dates, and whether they have been correctly inducted.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  26. Emergency Drill Report

    ਫ਼ਾਰਮ · 4 ਭਾਗ

    A form for reporting the outcome of an emergency drill: participants, simulation, problems found and corrective action.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  27. Construction Hazardous Works Module

    ਨੀਤੀ · 12 ਭਾਗ

    Seven hazardous works modules for construction projects, with hazard checklists, registers, rescue plans and an excavation inspection checklist.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  28. Quarterly Objective and Targets Report

    ਫ਼ਾਰਮ · 7 ਖਾਨੇ

    A quarterly register for reporting results against your key objectives and targets at the end of March, June, September and December.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  29. Test Protocols

    ਫ਼ਾਰਮ · 4 ਖਾਨੇ

    A register of test protocols: each protocol's number and name, its date of issue and the date it is due for review.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  30. Emergency Response Register

    ਫ਼ਾਰਮ · 6 ਖਾਨੇ

    A register of a site's emergency response procedures: whether each is in place, its document, version and responsible person.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  31. Operations-Processes – Identification Form

    ਫ਼ਾਰਮ · 3 ਖਾਨੇ

    A register for listing the operations and processes an organisation carries out, with an identifier and the location of each.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  32. Management Review Meeting Report IMS

    ਫ਼ਾਰਮ · 6 ਖਾਨੇ

    An integrated management system review meeting report: attendance, agenda, ten review items for quality, safety and environment, and follow-up.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  33. Inspection Test Plan

    ਪ੍ਰਬੰਧਨ ਯੋਜਨਾ · 2 ਭਾਗ

    A blank inspection test plan to record activities, test methods, acceptance criteria, records and inspections, with approval and review sign-off.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  34. Chemical & SDS Register

    ਫ਼ਾਰਮ · 13 ਖਾਨੇ

    Keep a list of the hazardous substances and dangerous goods at your workplace, with their GHS and DG classification, SDS date, quantities, placards and manifests.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  35. Verification of Competency Record

    ਫ਼ਾਰਮ · 25 ਖਾਨੇ

    A form for recording a worker's verification of competency: worker, assessor and expert details, method, result and a checklist.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  36. Operational Control Register

    ਫ਼ਾਰਮ · 7 ਖਾਨੇ

    A register of the documented operational controls for your processes: whether each is in place, its procedure, version and responsible person.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  37. Trades IMS Manual

    ਪ੍ਰਬੰਧਨ ਯੋਜਨਾ · 13 ਭਾਗ

    An integrated management system manual for trades covering health, safety, environmental and quality to ISO 45001, 14001 and 9001.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  38. Incident Report Form

    ਫ਼ਾਰਮ · 28 ਖਾਨੇ

    Record a workplace incident, injury, near miss or property damage: what happened, who was involved, notifying the regulator, and the investigation that follows.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  39. Plant and Equipment Register

    ਫ਼ਾਰਮ · 13 ਖਾਨੇ

    Record the maintenance requirements and history of all plant and equipment, and whether each item needs a licence to operate or registration with the regulator.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  40. HSEQ Procurement Implementation Guide

    ਨੀਤੀ · 6 ਭਾਗ

    A guide to applying the integrated HSEQ procurement procedure: factors to weigh, tailoring, responsibilities and a seven-step process.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  41. Training Needs Register

    ਫ਼ਾਰਮ · 8 ਖਾਨੇ

    Training needs register recording each role's responsibilities, required qualifications and competencies, training needs, dates and course details.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  42. Asbestos Register

    ਫ਼ਾਰਮ · 17 ਖਾਨੇ

    An asbestos register for the workplace: who is responsible, whether asbestos is present, and each item's type, condition and location.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  43. Induction Checklist

    ਫ਼ਾਰਮ · 6 ਖਾਨੇ

    An induction checklist that ensures essential safety topics are covered for new workers and visitors, from site rules and emergencies to PPE and SWMS.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  44. Operational Control Development Worksheet

    ਫ਼ਾਰਮ · 11 ਖਾਨੇ

    A worksheet for assessing documented controls: which procedures are in place, which need updating and which new documents are required.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  45. Corrective-Preventative Actions Register

    ਫ਼ਾਰਮ · 7 ਖਾਨੇ

    Register to record the corrective and preventative actions to be taken from raised issues, with due dates, status and completion.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  46. Injuries/Illness Register

    ਫ਼ਾਰਮ · 10 ਖਾਨੇ

    Register to record workplace injuries and illnesses, with the incident type, category and corrective actions taken.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  47. Workplace Inspection Checklist

    ਫ਼ਾਰਮ · 5 ਖਾਨੇ

    A checklist for safety officers to inspect the workplace, from emergency management and first aid to machinery, chemicals, electrical safety and housekeeping.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  48. SOP Template

    ਫ਼ਾਰਮ · 9 ਖਾਨੇ

    A Standard/Safe Operating Procedure (SOP) template for writing step-by-step procedures specific to your business tasks.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  49. Outsourced Process Register

    ਫ਼ਾਰਮ · 9 ਖਾਨੇ

    A register for assessing outsourced processes: customer requirements, your requirements, validation and verification for each outsource company.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  50. First Aid Worker Register

    ਫ਼ਾਰਮ · 8 ਖਾਨੇ

    A register of your first aid officers: who manages the first aid kit, each officer's location and contact details, and their qualifications and expiry dates.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  51. Compliance Evaluation Report

    ਫ਼ਾਰਮ · 11 ਖਾਨੇ

    A compliance evaluation report for checking legislation, codes of practice and standards across health and safety, environmental and quality.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  52. Health Surveillance Record

    ਫ਼ਾਰਮ · 13 ਖਾਨੇ

    A register of each worker's occupational exposures, the health surveillance required, the examiner's recommendation and the follow up completed.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  53. High Risk Licence Table & Checklist

    ਫ਼ਾਰਮ · 2 ਭਾਗ

    A checklist and table of high-risk work licences and classes, to confirm which on-site activities need a licensed worker.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  54. Organisation Chart

    ਫ਼ਾਰਮ · 5 ਭਾਗ

    An organisation chart naming who holds each safety role, from the PCBU, owner or CEO through senior management and the health and safety team to workers.

    ਸਿਰਫ਼ ਇਸ ਸਿਸਟਮ ਵਿੱਚ
  55. Isolation Permit to Work

    ਫ਼ਾਰਮ · 13 ਖਾਨੇ

    A permit for the safe isolation of plant and equipment during maintenance, cleaning or repairs, with sign-offs and priority release.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  56. Training Skills Responsibilities Register

    ਫ਼ਾਰਮ · 8 ਖਾਨੇ

    A register of roles, responsibilities, required competencies and training needs, with training dates, course details and comments.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  57. Objectives Summary Form

    ਫ਼ਾਰਮ · 7 ਖਾਨੇ

    A form for management to record an objective, its background, target and the resources required, with the responsible person's sign-off.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  58. Supplier Evaluation Scorecard IMS

    ਫ਼ਾਰਮ · 11 ਖਾਨੇ

    Supplier scorecard to rate HSEQ management, performance, procurement and subcontractor criteria from 1 to 5 and record an approval decision.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  59. Work Groups Register

    ਫ਼ਾਰਮ · 8 ਖਾਨੇ

    A register for keeping track of workplace work groups, their locations, members and health and safety representatives.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  60. Document Register

    ਫ਼ਾਰਮ · 14 ਖਾਨੇ

    A register of the documents your organisation holds: numbers, versions, titles, purpose, author, key dates and approvals, for version control.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  61. Risk Register

    ਫ਼ਾਰਮ · 8 ਖਾਨੇ

    A form to record identified hazards and risk levels in the workplace, with current controls and recommended actions for uncontrolled risks.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  62. Objectives and Targets Register

    ਫ਼ਾਰਮ · 5 ਖਾਨੇ

    A register of key objectives and targets, each with its performance metric and the person or area responsible.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  63. Chemical Risk Assessment Form

    ਫ਼ਾਰਮ · 28 ਖਾਨੇ

    A form to assess the risks of a hazardous chemical, rate them with a matrix and record the controls needed to protect workers.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  64. Verification of Requirements Checklist IMS

    ਫ਼ਾਰਮ · 18 ਖਾਨੇ

    A checklist to verify delivered goods or services meet HSEQ requirements: procurement details, a verification table, overall result and approvals.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  65. Chemical Manifest

    ਫ਼ਾਰਮ · 17 ਖਾਨੇ

    Chemical manifest to record the bulk and packaged hazardous chemicals on site, with a site plan, its legend and the emergency contacts.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  66. Change Request Form

    ਫ਼ਾਰਮ · 16 ਖਾਨੇ

    A form to detail and record a request for a change to systems or processes, with the change manager's initial risk analysis.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  67. Customer Complaints Form

    ਫ਼ਾਰਮ · 18 ਖਾਨੇ

    A form for recording customer complaints, with an internal section for action, follow-up, outcome and sign-off.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  68. Worker Training Record

    ਫ਼ਾਰਮ · 10 ਖਾਨੇ

    A record of one worker's training in one course: who approved it, start and completion dates, description, expected outcomes and training type.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  69. AS/NZS ISO 9001:2016 Internal Audit Checklist

    ਫ਼ਾਰਮ · 41 ਖਾਨੇ

    A checklist for self-assessing your quality management system against AS/NZS ISO 9001:2016, with audit guidance, scope, auditors and space for findings.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  70. Electrical Equipment Register

    ਫ਼ਾਰਮ · 8 ਖਾਨੇ

    A register for the testing and tagging of plug-in electrical equipment in the workplace: test dates and types, results, the next test due and management sign-off.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  71. Environmental Control Plan

    ਪ੍ਰਬੰਧਨ ਯੋਜਨਾ · 7 ਭਾਗ

    An Environmental Control Plan covering policy, responsibilities, risk control, and air, chemicals, waste, energy and water management.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  72. Product Approval Checklist

    ਫ਼ਾਰਮ · 8 ਖਾਨੇ

    A checklist for approving a design for release: project details, component sign-off with Yes and No tick boxes, and an approval signature.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  73. Mobile Crane

    SWMS · ਕੰਮ ਦੇ 16 ਕਦਮ

    Mobile Crane SWMS: 16 job steps covering power lines, set-up, load equipment checks, lifting, maintenance, refuelling and emergencies.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  74. Mini Crane

    SWMS · ਕੰਮ ਦੇ 16 ਕਦਮ

    Mini Crane SWMS: 16 job steps from planning and set-up to crane placement near power lines, load equipment, lifting, maintenance and emergencies.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  75. Dogman

    SWMS · ਕੰਮ ਦੇ 12 ਕਦਮ

    A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  76. Crane Truck Mounted

    SWMS · ਕੰਮ ਦੇ 16 ਕਦਮ

    SWMS for truck-mounted cranes such as Hiabs: 16 job steps from training and road operation to pre-lift checks, loading and unloading, and emergency response.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  77. Crane Self-Erecting

    SWMS · ਕੰਮ ਦੇ 19 ਕਦਮ

    Crane Self-Erecting SWMS: 19 job steps from lift planning and erecting the crane to workboxes, re-fuelling and emergency response.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  78. Lock Out Tag Out (LOTO)

    SWMS · ਕੰਮ ਦੇ 12 ਕਦਮ

    SWMS for lock out tag out of plant and equipment: isolation procedures, permits, locks and tags, electrical isolation and returning plant to service.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  79. Tower Crane

    SWMS · ਕੰਮ ਦੇ 13 ਕਦਮ

    SWMS for tower crane work: planning, work area set-up, climbing the tower, pre-start checks, crane operation, re-fuelling and emergency response.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  80. Workbox

    SWMS · ਕੰਮ ਦੇ 13 ਕਦਮ

    Workbox SWMS: 13 job steps for working at height in a workbox (man basket), from the rescue plan and trial lift to emergency response.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  81. Commissioning Checklist for Plant

    ਫ਼ਾਰਮ · 4 ਖਾਨੇ

    A commissioning checklist for newly installed plant: 15 Yes, No or N/A inspection questions, notes and actions, and a technician or engineer sign-off.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  82. Plant Risk Assessment Form

    ਫ਼ਾਰਮ · 25 ਖਾਨੇ

    Identify the hazards of an item of plant, score the risk with a risk matrix, and tick the control measures in place, with reviews and approval.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  83. Machine Guarding Risk Assessment Form

    ਫ਼ਾਰਮ · 22 ਖਾਨੇ

    Assess the physical hazards of machinery and machine guarding, rate the risk with a risk matrix, and record the controls and who is responsible.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  84. Internal Audit Plan

    ਪ੍ਰਬੰਧਨ ਯੋਜਨਾ · 5 ਭਾਗ

    An Internal Audit Plan to set the audit's subject, scope, objectives, team and criteria, so audits are conducted efficiently and effectively.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  85. Emergency Response Plan-Plant

    ਪ੍ਰਬੰਧਨ ਯੋਜਨਾ · 18 ਭਾਗ

    An emergency response plan for plant and machinery: emergency contacts, call procedure, crushing, cutting and entanglement responses, first aid and registers.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  86. Standard Operating Procedure (SOP) Register

    ਫ਼ਾਰਮ · 6 ਖਾਨੇ

    Register to keep track of the SOPs in your workplace, with the task, issue and review dates, version and responsible person.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  87. Plant Safety Management Plan

    ਪ੍ਰਬੰਧਨ ਯੋਜਨਾ · 22 ਭਾਗ

    A plan for managing plant and equipment safety, from purchase and hire to maintenance, lock out tag out, machine guarding and disposal.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  88. SWMS Template

    ਫ਼ਾਰਮ · ਕੰਮ ਦੇ 1 ਕਦਮ

    SWMS Template: ready to fill in, with your business's details on every copy. Part of the Health and Safety Manual.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  89. Incident/Near Miss Reporting Form

    ਫ਼ਾਰਮ · 7 ਖਾਨੇ

    An incident and near miss report form: reporter details, incident type and severity, witnesses, causes and the follow-up actions.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  90. Management Review Meeting Report

    ਫ਼ਾਰਮ · 7 ਖਾਨੇ

    A form to record a management review meeting: attendance, discussion, previous action items and new actions.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  91. Purchasing Record Form

    ਫ਼ਾਰਮ · 4 ਖਾਨੇ

    A purchasing record and OHS checklist to help manage the risks of new equipment, chemicals and other items before they are introduced.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  92. Pre-Purchase Safety Checklist for Plant

    ਫ਼ਾਰਮ · 5 ਖਾਨੇ

    A checklist for the purchase, hire, lease or donation of plant: consultation, supplier, safety, PPE, training, maintenance and cost.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  93. Plant Maintenance Log

    ਫ਼ਾਰਮ · 13 ਖਾਨੇ

    Log the maintenance of an item of plant: its make, model, serial number and location, then each maintenance date, the findings, work done, next due date and sign-off.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  94. Plant-Equipment Prestart Checklist

    ਫ਼ਾਰਮ · 4 ਖਾਨੇ

    A Yes/No/N/A prestart checklist for plant and equipment: inspection, electrical, guarding, training, safety equipment and emergency checks.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  95. Plant & Equipment Hazard Register

    ਫ਼ਾਰਮ · 9 ਖਾਨੇ

    Record the hazards and controls for every task that involves plant and equipment used by the company.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  96. Safe Work Method Statement (SWMS) Register

    ਫ਼ਾਰਮ · 5 ਖਾਨੇ

    A register to record each Safe Work Method Statement by title, document number, issue and review dates, with management sign-off.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  97. Mobile Plant Pre-Start Checklist

    ਫ਼ਾਰਮ · 3 ਖਾਨੇ

    A pre-start checklist for mobile plant: Yes, No or N/A checks on tyres, lights, fluids, cabin and safety devices, with comments for each section.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  98. Worker Consultation Record

    ਫ਼ਾਰਮ · 9 ਖਾਨੇ

    A worker consultation record: purpose, participants, key points, feedback and concerns, agreed actions and signatures.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  99. Internal Audit Report

    ਫ਼ਾਰਮ · 11 ਖਾਨੇ

    Helps auditors give management clear, objective and impartial information about what is going well and what needs to be improved.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  100. Machine Guarding Checklist

    ਫ਼ਾਰਮ · 11 ਖਾਨੇ

    A machine guarding inspection checklist covering guard installation, condition and functioning, signage and controls, and administrative controls.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ
  101. Manual Handling

    SOP · 5 ਭਾਗ

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    ਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ

ਇਸ ਵਿੱਚ ਕੀ ਹੈ

ਇਸ ਵਿੱਚ ਸ਼ਾਮਲ ਖ਼ਤਰੇ

ਕਾਨੂੰਨ ਅਤੇ ਮਿਆਰ ਜਿਨ੍ਹਾਂ ਦਾ ਇਸ ਵਿੱਚ ਹਵਾਲਾ ਹੈ

ਹਰ SWMS ਨਾਲ ਸਾਡੀ ਕਾਨੂੰਨਾਂ ਅਤੇ ਅਭਿਆਸ ਕੋਡਾਂ (codes of practice) ਦੀ ਹਵਾਲਾ ਸੂਚੀ ਆਉਂਦੀ ਹੈ।

ਸਿਸਟਮ ਕਿਵੇਂ ਜੁੜਦਾ ਹੈ

ਹਰ ਦਸਤਾਵੇਜ਼ ਉਹਨਾਂ ਦਸਤਾਵੇਜ਼ਾਂ ਵੱਲ ਇਸ਼ਾਰਾ ਕਰਦਾ ਹੈ ਜਿਨ੍ਹਾਂ 'ਤੇ ਇਹ ਨਿਰਭਰ ਹੈ, ਨਿਯਮ ਤੈਅ ਕਰਨ ਵਾਲੀ ਯੋਜਨਾ ਤੋਂ ਲੈ ਕੇ ਟੀਮ ਦੇ ਕੰਮ ਵਾਲੇ ਦਿਨ ਦੇ ਕੰਮ ਤੱਕ।

ਫ਼ਾਰਮ, ਰਜਿਸਟਰ ਅਤੇ ਚੈੱਕਲਿਸਟਾਂ

JSEA Template8 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈPPE Register6 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈAS/NZS ISO 45001:2018 Internal Audit Checklist16 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈRisk Assessment Form8 ਖਾਨੇਸਿਰਫ਼ ਇਸ ਸਿਸਟਮ ਵਿੱਚRoles and Responsibilities Schedule1 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈProducts Processes – Identification and Material Traceability5 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈEnvironmental Incident and Corrective Action Report Form23 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈMeeting and Toolbox Talk Record8 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈCorrective and Preventative Actions Form9 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈAnnual Audit Schedule1 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈMonitoring Register7 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈAS/NZS ISO 14001:2016 Internal Audit Checklist29 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈMonitoring and Measurement Schedule3 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈIncident Register10 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈInterested Parties Register5 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈInfrastructure Responsibilities Register2 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈWorker Training and Induction Register10 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈEmergency Drill Report4 ਭਾਗਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈQuarterly Objective and Targets Report7 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈTest Protocols4 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈEmergency Response Register6 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈOperations-Processes – Identification Form3 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈManagement Review Meeting Report IMS6 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈChemical & SDS Register13 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈVerification of Competency Record25 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈOperational Control Register7 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈIncident Report Form28 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈPlant and Equipment Register13 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈTraining Needs Register8 ਖਾਨੇOrganisation Chart ਦਾ ਹਵਾਲਾ ਦਿੰਦਾ ਹੈਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈAsbestos Register17 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈInduction Checklist6 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈOperational Control Development Worksheet11 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈCorrective-Preventative Actions Register7 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈInjuries/Illness Register10 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈWorkplace Inspection Checklist5 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈSOP Template9 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈOutsourced Process Register9 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈFirst Aid Worker Register8 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈCompliance Evaluation Report11 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈHealth Surveillance Record13 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈHigh Risk Licence Table & Checklist2 ਭਾਗਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈOrganisation Chart5 ਭਾਗਸਿਰਫ਼ ਇਸ ਸਿਸਟਮ ਵਿੱਚIsolation Permit to Work13 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈTraining Skills Responsibilities Register8 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈObjectives Summary Form7 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈSupplier Evaluation Scorecard IMS11 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈWork Groups Register8 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈDocument Register14 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈRisk Register8 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈObjectives and Targets Register5 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈChemical Risk Assessment Form28 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈVerification of Requirements Checklist IMS18 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈChemical Manifest17 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈChange Request Form16 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈCustomer Complaints Form18 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈWorker Training Record10 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈAS/NZS ISO 9001:2016 Internal Audit Checklist41 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈElectrical Equipment Register8 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈProduct Approval Checklist8 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈCommissioning Checklist for Plant4 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈPlant Risk Assessment Form25 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈMachine Guarding Risk Assessment Form22 ਖਾਨੇRisk Register ਦਾ ਹਵਾਲਾ ਦਿੰਦਾ ਹੈਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈStandard Operating Procedure (SOP) Register6 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈSWMS Templateਕੰਮ ਦੇ 1 ਕਦਮਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈIncident/Near Miss Reporting Form7 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈManagement Review Meeting Report7 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈPurchasing Record Form4 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈPre-Purchase Safety Checklist for Plant5 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈPlant Maintenance Log13 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈPlant-Equipment Prestart Checklist4 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈPlant & Equipment Hazard Register9 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈSafe Work Method Statement (SWMS) Register5 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈMobile Plant Pre-Start Checklist3 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈWorker Consultation Record9 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈInternal Audit Report11 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈMachine Guarding Checklist11 ਖਾਨੇਇਕੱਲਾ ਵੀ ਮਿਲਦਾ ਹੈ

ਸਮੀਖਿਆਵਾਂ

ਅਜੇ ਕੋਈ ਸਮੀਖਿਆ ਨਹੀਂ।

ਟੈਂਪਲੇਟ ਕਿਵੇਂ ਕੰਮ ਕਰਦੇ ਹਨ

ਭੁਗਤਾਨ ਕਰਨ ਤੋਂ ਪਹਿਲਾਂ ਅਜ਼ਮਾਓ।

  1. ਮੁਫ਼ਤ ਝਲਕ

    ਹਰ ਟੈਂਪਲੇਟ ਦੇ ਕੰਮ ਦੇ ਕਦਮ, ਖ਼ਤਰੇ ਅਤੇ ਪਹਿਲਾ ਕੰਮ ਪੜ੍ਹਨ ਲਈ ਖੁੱਲ੍ਹੇ ਹਨ। ਸਾਈਨ ਅੱਪ ਦੀ ਲੋੜ ਨਹੀਂ।

  2. ਐਡੀਟਰ ਅਜ਼ਮਾਓ

    ਕੰਪਿਊਟਰ ਜਾਂ ਆਪਣੇ ਫ਼ੋਨ 'ਤੇ, ਇੱਕ ਡੈਮੋ SWMS ਨੂੰ ਆਪਣੀ ਕੰਪਨੀ, ਜੌਬ ਅਤੇ ਸਾਈਟ ਮੁਤਾਬਕ ਢਾਲੋ।

  3. ਮੁਫ਼ਤ ਸਾਈਨ ਅੱਪ ਕਰੋ

    ਤੁਹਾਡੇ ਵੇਰਵੇ ਅਤੇ ਲੋਗੋ ਨਾਲ ਆ ਜਾਂਦੇ ਹਨ। ਇਹ ਟੈਂਪਲੇਟ ਪਹਿਲਾਂ ਤੋਂ ਭਰਿਆ ਹੋਇਆ ਖੁੱਲ੍ਹਦਾ ਹੈ।

  4. ਕ੍ਰੈਡਿਟ ਵਰਤੋ ਜਾਂ ਇੱਕ ਵਾਰ ਖ਼ਰੀਦੋ

    ਪੇਡ ਪਲਾਨਾਂ ਵਿੱਚ ਹਰ ਮਹੀਨੇ ਟੈਂਪਲੇਟ ਕ੍ਰੈਡਿਟ ਸ਼ਾਮਲ ਹਨ। ਜਾਂ ਰੱਖਣ ਲਈ ਇਹ ਟੈਂਪਲੇਟ ਖ਼ਰੀਦੋ।