Eight SWMS for bricklayers and block layers: brick and block laying, brick cleaning, scaffolds, silica dust, elevating work platforms and construction labouring.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost six template credits instead of eight.

Xem trước SWMS Brick and Block Laying

Brick and Block Laying

SWMSVersion 11
Company doing the work
[Company]
Business contact
—
Phone #
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's signature
—
Date signed
—
Contact phone #
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone #
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Structural AlterationsStructures or buildings involving structural alterations or repairs that require temporary support to prevent collapse
  • FallsInvolves a risk of a person falling from 2m or more, including work on telecommunications towers

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Breathing Protection
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Provide training on the health effects associated with RCS

    • Hazard

      Exposure to respirable crystalline silica (RCS) – dust inhalation

      Before controls4 Acute
      Controls
      • Training and Information provided to workers on RCS should include:

        • Identification of RCS dust through Safety Datasheet (SDS) or labels

        • Dust exposure prevention strategies

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes).

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

Thêm 21 bước công việc, từ Planning access to the height location đến Emergency response

Mỗi bước đều có mối nguy, mức rủi ro và biện pháp kiểm soát, cùng phần ký nhận của đội.

Xem trước dạng

Hiển thị thế nào trên trình duyệt

Lấy gói tiết kiệm này

Đăng ký miễn phí, rồi chọn cách bạn muốn lấy. Mọi tài liệu sẽ vào Thư viện của bạn, trong một thư mục mang tên gói.

  • Có trong các gói trả phí

    Dùng lượt mở mẫu trong gói dịch vụ của bạn. Gói này cần 6 lượt thay vì 8 lượt.

    So sánh các gói và giá
  • Mua một lần

    $539.70 $719.60 trả một lần, và mẫu là của bạn mãi mãi. Dùng được cả với gói Miễn phí.

Không cần thẻ để đăng ký. Thành viên truy cập sớm được giảm 30% cho mọi gói.

Gói gồm những gì

  1. Brick and Block Laying

    SWMS · 22 bước công việc

    SWMS for brick and block laying: silica dust, materials delivery, mortar, cutting and laying, core steel, acid washing, scaffolds and ladders, and emergencies.

    Cũng bán riêng
  2. Construction Labourer

    SWMS · 16 bước công việc

    Construction Labourer SWMS: 16 job steps for labourers on construction sites, from silica dust and mobile plant to ladders and emergency response.

    Cũng bán riêng
  3. Brick Cleaning

    SWMS · 13 bước công việc

    SWMS for cleaning brickwork with high-pressure cleaners and a hydrochloric acid solution, from mixing and cleaning to refuelling and emergencies.

    Cũng bán riêng
  4. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 12 bước công việc

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    Cũng bán riêng
  5. Working on Scaffolds

    SWMS · 7 bước công việc

    Working on Scaffolds SWMS: 7 job steps covering scaffold inspection, general use, mobile scaffolds, trestles, emergencies and incidents.

    Cũng bán riêng
  6. Powered Non-powered Tools

    SWMS · 12 bước công việc

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    Cũng bán riêng
  7. Manual Handling

    SWMS · 18 bước công việc

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    Cũng bán riêng
  8. Silica Dust

    SWMS · 14 bước công việc

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    Cũng bán riêng

Nội dung bao gồm

Các mối nguy được đề cập

Luật và tiêu chuẩn được dẫn chiếu

Mỗi SWMS đều đi kèm danh sách tham chiếu luật và bộ quy tắc thực hành (codes of practice) của chúng tôi.

Bạn tiết kiệm được gì

MẫuBước công việcMua riêng
Brick and Block Laying22$89.95 · 1 lượt mở mẫu
Construction Labourer16$89.95 · 1 lượt mở mẫu
Brick Cleaning13$89.95 · 1 lượt mở mẫu
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 lượt mở mẫu
Working on Scaffolds7$89.95 · 1 lượt mở mẫu
Powered Non-powered Tools12$89.95 · 1 lượt mở mẫu
Manual Handling18$89.95 · 1 lượt mở mẫu
Silica Dust14$89.95 · 1 lượt mở mẫu
Mua từng mẫu$719.60 · 8 lượt mở mẫu
Trong gói này$539.70 · 6 lượt mở mẫu Bạn tiết kiệm $179.90

Đánh giá

Chưa có đánh giá nào.

Cách các mẫu hoạt động

Dùng thử trước khi trả tiền.

  1. Xem trước miễn phí

    Các bước công việc, mối nguy và nhiệm vụ đầu tiên của mọi mẫu đều mở để đọc. Không cần đăng ký.

  2. Thử trình soạn thảo

    Chỉnh một SWMS demo theo công ty, công việc và công trường của bạn, trên máy tính hoặc điện thoại.

  3. Đăng ký miễn phí

    Thông tin và logo của bạn được chuyển sang. Mẫu này sẽ mở ra với thông tin đã điền sẵn.

  4. Dùng một lượt hoặc mua một lần

    Các gói trả phí có lượt mở mẫu mỗi tháng. Hoặc mua mẫu này để giữ lại.