Road Safety Barrier Installation

SWMS · SWMS-10658

  • 21 bước công việc
  • Phiên bản 4

This Road Safety Barrier Installation Safe Work Method Statement (SWMS) covers the hazards and controls associated with the installation of road safety barriers.

It takes the crew through 21 job steps: training on the health effects of respirable crystalline silica (RCS), planning, checking the weather, arriving on site, setting up the work zone, environment, housekeeping, manual tasks, materials delivery, mobile plant, powered and non-powered tools, hazardous substances and chemicals, driving posts, changing attachments, posthole excavation, concrete placement, cutting the road surface, rail installation, refuelling, completion and emergency response.

It includes controls for high-risk construction work, additional controls for electrical equipment, slips, trips and falls, and hazardous substances.

It suits businesses and contractors installing road safety barriers, to help them meet their WHS obligations.

Xem trang riêng

Xem trước SWMS Road Safety Barrier Installation

Road Safety Barrier Installation

SWMSVersion 4
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile PlantWork in an area where there is any movement of powered mobile plant
  • Gas MainsWork on or near pressurised gas distribution mains or piping
  • Hazardous LinesWork on or near chemical, fuel or refrigerant lines
  • Energised ElectricalWork on or near energised electrical installations or services
  • Traffic CorridorsWork on, in or adjacent to a road, railway, shipping lane or other traffic corridor in use by traffic other than pedestrians
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. Specify?

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Breathing Protection
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Provide training on the health effects associated with RCS

    • Hazard

      Exposure to respirable crystalline silica (RCS) – dust inhalation

      Before controls3 High
      Controls
      • Training and information provided to workers on RCS should include:

        • Identification of RCS dust through Safety Datasheet (SDS) or labels

        • Dust exposure prevention strategies

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes).

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

Thêm 20 bước công việc, từ Planning đến Emergency response

Mỗi bước đều có mối nguy, mức rủi ro và biện pháp kiểm soát, cùng phần ký nhận của đội.

Xem trước dạng

Hiển thị thế nào trên trình duyệt

Lấy gói tiết kiệm này

Đăng ký miễn phí, rồi chọn cách bạn muốn lấy. Mọi tài liệu sẽ vào Thư viện của bạn, trong một thư mục mang tên gói.

  • Có trong các gói trả phí

    Dùng lượt mở mẫu trong gói dịch vụ của bạn. Gói này cần 38 lượt thay vì 57 lượt.

    So sánh các gói và giá
  • Mua một lần

    $3,418.10 $5,127.15 trả một lần, và mẫu là của bạn mãi mãi. Dùng được cả với gói Miễn phí.

Không cần thẻ để đăng ký. Thành viên truy cập sớm được giảm 30% cho mọi gói.

Nội dung bao gồm

21 bước công việc

  1. Provide training on the health effects associated with RCSTrain workers on the health effects of respirable crystalline silica (RCS).
  2. PlanningDevelop a Traffic Management Plan and identify underground services.
  3. Check weather conditions & prepareCheck the weather conditions and environmental considerations.
  4. Arrival on-site & assess onsite conditionsCheck the worksite matches the contract terms and identify unanticipated hazards.
  5. Establish safe work zone (site set-up)Set up a safe work zone and communication protocols.
  6. EnvironmentManage environmental impacts, including noise, air quality and waste.
  7. House keepingKeep the work area clean and safe to prevent slips, trips and falls.
  8. Manual tasksPrevent musculoskeletal disorder (MSD) injuries.
  9. Materials deliveryDeliver materials safely to avoid accidents.
  10. Mobile plant delivery, set-up & removalHandle and operate mobile plant safely.
  11. Working with powered & non-powered toolsPrevent electrocution, injury, fire and asphyxiation.
  12. Hazardous substance /chemical useManage the risks of hazardous substances and chemicals.
  13. Driving postsOperate post-driving equipment safely.
  14. Changing attachmentsChange equipment attachments safely.
  15. Posthole excavation using an excavatorMake sure only licensed operators carry out excavation work.
  16. Concrete placementManage the risks of handling wet cement.
  17. Cutting road surface (concrete/bitumen)Control silica dust exposure during cutting.
  18. Rail installationManage fire safety and the handling of materials.
  19. Fuelling onsiteManage the risks of refuelling on site.
  20. On completionSecure the site and keep it safe after the work is complete.
  21. Emergency responseRespond to emergencies.

Các mối nguy được đề cập

Cách các mẫu hoạt động

Dùng thử trước khi trả tiền.

  1. Xem trước miễn phí

    Các bước công việc, mối nguy và nhiệm vụ đầu tiên của mọi mẫu đều mở để đọc. Không cần đăng ký.

  2. Thử trình soạn thảo

    Chỉnh một SWMS demo theo công ty, công việc và công trường của bạn, trên máy tính hoặc điện thoại.

  3. Đăng ký miễn phí

    Thông tin và logo của bạn được chuyển sang. Mẫu này sẽ mở ra với thông tin đã điền sẵn.

  4. Dùng một lượt hoặc mua một lần

    Các gói trả phí có lượt mở mẫu mỗi tháng. Hoặc mua mẫu này để giữ lại.