Ưu đãi truy cập sớm:Truy cập sớm: giảm 30%, chừng nào bạn vẫn còn đăng ký.

Nhận ưu đãi

Các tài liệu mẫu được soạn bằng tiếng Anh.

Gói tiết kiệm · 18 mẫu

Concrete Pool Installation Combo

Gói tiết kiệm · PACK-50330

Xem trước mẫu Gói tiết kiệm Concrete Pool Installation Combo
  • 18 mẫu
  • 18 mẫu với giá của 14 mẫu
  • Được đưa vào một thư mục trong Thư viện

A set of 14 SWMS and four SOPs for concrete pool builders.

The SWMS cover concrete pool construction, rendering, tiling, silica dust, pool heating and earthmoving. The SOPs include Excavator, Handheld Power Tools and Manual Handling.

Each document is the same one sold on its own, so you get every update to it. Together they cost 14 template credits instead of 18.

Xem trước SWMS Pool Covers - Rollers

Pool Covers - Rollers

SWMSVersion 3
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous Lineschemical, fuel or refrigerant lines
  • Energised Electricalenergised electrical installations or services
  • Water & DrowningIn or near water or other liquid that involves the risk of drowning

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold Points

Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Head Protection
  • Breathing Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Provide training on the health effects associated with RCS

    • Hazard

      Exposure to respirable crystalline silica (RCS) – dust inhalation

      Before controls3 High
      Controls
      • Training and Information provided to workers on RCS should include:

        • Identification of RCS dust through Safety Datasheet (SDS) or labels

        • Dust exposure prevention strategies

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes).

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

Thêm 13 bước công việc, từ Check weather conditions & prepare đến Emergency response

Mỗi bước đều có mối nguy, mức rủi ro và biện pháp kiểm soát, cùng phần ký nhận của đội.

Xem trước dạng

Hiển thị thế nào trên trình duyệt

Lấy gói tiết kiệm này

Đăng ký miễn phí, rồi chọn cách bạn muốn lấy. Mọi tài liệu sẽ vào Thư viện của bạn, trong một thư mục mang tên gói.

  • Có trong các gói trả phí

    Dùng lượt mở mẫu trong gói dịch vụ của bạn. Gói này cần 14 lượt thay vì 18 lượt.

    So sánh các gói và giá
  • Mua một lần

    $1,259.30 $1,619.10 trả một lần, và mẫu là của bạn mãi mãi. Dùng được cả với gói Miễn phí.

Không cần thẻ để đăng ký. Thành viên truy cập sớm được giảm 30% cho mọi gói.

Gói gồm những gì

  1. Pool Covers - Rollers

    SWMS · 14 bước công việc

    SWMS for installing pool covers and rollers: silica dust, drilling near services, working at height, mounting covers near water and emergencies.

    Cũng bán riêng
  2. Mobile Plant Working Near-Around

    SWMS · 8 bước công việc

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    Cũng bán riêng
  3. Handheld Power Tools

    SOP · 9 phần

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    Cũng bán riêng
  4. Pool Solar Heating

    SWMS · 16 bước công việc

    Pool Solar Heating SWMS: 16 job steps covering roof access, panel and pump installation, silica dust, tools and emergency response.

    Cũng bán riêng
  5. Temporary Fencing

    SWMS · 11 bước công việc

    SWMS for temporary fencing: delivery, set-up, installation and removal, traffic and plant, manual tasks, housekeeping, completion and emergencies.

    Cũng bán riêng
  6. Manual Handling

    SOP · 5 phần

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    Cũng bán riêng
  7. Silica Dust

    SWMS · 14 bước công việc

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    Cũng bán riêng
  8. Fencing

    SWMS · 16 bước công việc

    Fencing SWMS: 16 job steps for wire, timber, steel panel, pool and glass panel fences, from planning to post holes, gates and emergencies.

    Cũng bán riêng
  9. Hand Tools

    SOP · 9 phần

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    Cũng bán riêng
  10. Earthmoving Equipment

    SWMS · 23 bước công việc

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    Cũng bán riêng
  11. Rendering

    SWMS · 14 bước công việc

    SWMS for rendering: silica dust, weather, work area set-up, ladders and scaffolds, surface preparation, render mixing, fuelling and emergency response.

    Cũng bán riêng
  12. Powered Non-powered Tools

    SWMS · 12 bước công việc

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    Cũng bán riêng
  13. Concrete Pool Construction

    SWMS · 18 bước công việc

    Covers building in-ground concrete pool shells, with the risks and controls for each job step from silica training and planning to emergency response.

    Cũng bán riêng
  14. Manual Handling

    SWMS · 18 bước công việc

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    Cũng bán riêng
  15. Tiling

    SWMS · 14 bước công việc

    Tiling SWMS: 14 job steps covering silica dust, weather, delivery, ladders and scaffold, tile cutting, completion and emergencies.

    Cũng bán riêng
  16. Excavator

    SOP · 9 phần

    Safe operating procedure for an excavator: hazards, PPE, licensing, clearances, maintenance, step-by-step operation and a hazard checklist.

    Cũng bán riêng
  17. Pool Gas Heater-Heat Pump

    SWMS · 17 bước công việc

    Pool Gas Heater-Heat Pump SWMS: 17 job steps for positioning, installing and testing swimming pool gas heaters and heat pumps.

    Cũng bán riêng
  18. Shotcrete

    SWMS · 16 bước công việc

    Shotcrete SWMS: 16 job steps covering mobile plant, power lines, tools, work at height, silica dust, noise and emergencies.

    Cũng bán riêng

Nội dung bao gồm

Các mối nguy được đề cập

Luật và tiêu chuẩn được dẫn chiếu

Mỗi SWMS đều đi kèm danh sách tham chiếu luật và bộ quy tắc thực hành (codes of practice) của chúng tôi.

Bạn tiết kiệm được gì

MẫuBước công việcMua riêng
Pool Covers - Rollers14$89.95 · 1 lượt mở mẫu
Mobile Plant Working Near-Around8$89.95 · 1 lượt mở mẫu
Handheld Power Tools0$89.95 · 1 lượt mở mẫu
Pool Solar Heating16$89.95 · 1 lượt mở mẫu
Temporary Fencing11$89.95 · 1 lượt mở mẫu
Manual Handling0$89.95 · 1 lượt mở mẫu
Silica Dust14$89.95 · 1 lượt mở mẫu
Fencing16$89.95 · 1 lượt mở mẫu
Hand Tools0$89.95 · 1 lượt mở mẫu
Earthmoving Equipment23$89.95 · 1 lượt mở mẫu
Rendering14$89.95 · 1 lượt mở mẫu
Powered Non-powered Tools12$89.95 · 1 lượt mở mẫu
Concrete Pool Construction18$89.95 · 1 lượt mở mẫu
Manual Handling18$89.95 · 1 lượt mở mẫu
Tiling14$89.95 · 1 lượt mở mẫu
Excavator0$89.95 · 1 lượt mở mẫu
Pool Gas Heater-Heat Pump17$89.95 · 1 lượt mở mẫu
Shotcrete16$89.95 · 1 lượt mở mẫu
Mua từng mẫu$1,619.10 · 18 lượt mở mẫu
Trong gói này$1,259.30 · 14 lượt mở mẫu Bạn tiết kiệm $359.80

Đánh giá

Chưa có đánh giá nào.

Cách các mẫu hoạt động

Dùng thử trước khi trả tiền.

  1. Xem trước miễn phí

    Các bước công việc, mối nguy và nhiệm vụ đầu tiên của mọi mẫu đều mở để đọc. Không cần đăng ký.

  2. Thử trình soạn thảo

    Chỉnh một SWMS demo theo công ty, công việc và công trường của bạn, trên máy tính hoặc điện thoại.

  3. Đăng ký miễn phí

    Thông tin và logo của bạn được chuyển sang. Mẫu này sẽ mở ra với thông tin đã điền sẵn.

  4. Dùng một lượt hoặc mua một lần

    Các gói trả phí có lượt mở mẫu mỗi tháng. Hoặc mua mẫu này để giữ lại.