Ưu đãi truy cập sớm:Truy cập sớm: giảm 30%, chừng nào bạn vẫn còn đăng ký.

Nhận ưu đãi

Các tài liệu mẫu được soạn bằng tiếng Anh.

Gói tiết kiệm · 22 mẫu

Concreting Combo

Gói tiết kiệm · PACK-50336

Xem trước mẫu Gói tiết kiệm Concreting Combo
  • 22 mẫu
  • 22 mẫu với giá của 16 mẫu
  • Được đưa vào một thư mục trong Thư viện

A set of 11 SWMS and 11 SOPs for concreters.

The SWMS cover concrete placement and finishing, slabs on ground, foundations, steel fixing, sawing and core drilling and silica dust. The SOPs include Wall Saw, Demolition Saw - Fuel Operated and Jackhammer.

Each document is the same one sold on its own, so you get every update to it. Together they cost 16 template credits instead of 22.

Xem trước SOP Wall Saw

Wall Saw

SOPVersion 3

Acronyms

  • LOTO - Lockout/Tagout.

  • PPE - Personal Protective Equipment.

  • SOP - Safe Operating Procedure.

Thêm 8 phần

  1. Hazards
  2. Personal protective equipment
  3. Pre-operational inspection
  4. Precautions
  5. Work area
  6. và 3 mục khác

Được soạn đầy đủ, sẵn sàng điền thông tin doanh nghiệp của bạn.

Xem trước dạng

Hiển thị thế nào trên trình duyệt

Lấy gói tiết kiệm này

Đăng ký miễn phí, rồi chọn cách bạn muốn lấy. Mọi tài liệu sẽ vào Thư viện của bạn, trong một thư mục mang tên gói.

  • Có trong các gói trả phí

    Dùng lượt mở mẫu trong gói dịch vụ của bạn. Gói này cần 16 lượt thay vì 22 lượt.

    So sánh các gói và giá
  • Mua một lần

    $1,439.20 $1,978.90 trả một lần, và mẫu là của bạn mãi mãi. Dùng được cả với gói Miễn phí.

Không cần thẻ để đăng ký. Thành viên truy cập sớm được giảm 30% cho mọi gói.

Gói gồm những gì

  1. Wall Saw

    SOP · 9 phần

    Safe operating procedure for a wall saw: hazards, PPE, training, inspection, step-by-step operation, manual handling and a hazard checklist.

    Cũng bán riêng
  2. Mobile Plant Working Near-Around

    SWMS · 8 bước công việc

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    Cũng bán riêng
  3. Demolition Saw - Fuel Operated

    SOP · 8 phần

    Safe operating procedure for a fuel-operated demolition saw: hazards, PPE, precautions, inspection, operation, maintenance, fuelling and a hazard checklist.

    Cũng bán riêng
  4. Handheld Power Tools

    SOP · 9 phần

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    Cũng bán riêng
  5. Concrete Placement and Finishing

    SWMS · 13 bước công việc

    SWMS for concrete placement and finishing: delivery, pumping and pouring, power lines, mobile plant, cement burns, trowelling machines and emergencies.

    Cũng bán riêng
  6. Jackhammer

    SOP · 9 phần

    Safe operating procedure for a jackhammer: hazards, PPE, pre-operational inspection, precautions, operation, fuelling, maintenance and a hazard checklist.

    Cũng bán riêng
  7. Manual Handling

    SOP · 5 phần

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    Cũng bán riêng
  8. Concrete Cutter - Fuel Powered

    SOP · 8 phần

    Safe operating procedure for a fuel-powered concrete cutter: hazards, PPE, inspection, silica, maintenance, fuelling, operation and a hazard checklist.

    Cũng bán riêng
  9. Handheld Circular Saw

    SOP · 8 phần

    Safe operating procedure for a handheld circular saw: hazards, PPE, precautions, inspection, operation, kickback and a hazard checklist.

    Cũng bán riêng
  10. Concrete Foundations Excavating - Pouring

    SWMS · 17 bước công việc

    SWMS for excavating, steel setting and pouring concrete foundations: 17 job steps from site set-up and plant delivery to the pour and emergencies.

    Cũng bán riêng
  11. Silica Dust

    SWMS · 14 bước công việc

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    Cũng bán riêng
  12. Hand Tools

    SOP · 9 phần

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    Cũng bán riêng
  13. Outdoor Work

    SOP · 11 phần

    Safe operating procedure for outdoor work: hazards, PPE, hot and cold conditions, poisonous plants, animals, first aid and a training register.

    Cũng bán riêng
  14. Concrete Core Drill

    SOP · 10 phần

    Safe operating procedure for a concrete core drill: hazards, PPE, inspection, precautions, operation steps, maintenance and a hazard checklist.

    Cũng bán riêng
  15. Concrete Steel Fixing

    SWMS · 15 bước công việc

    Concrete Steel Fixing SWMS: 15 job steps covering reo bar and mesh, crane lifting, scaffolds, hot work, power lines and emergencies.

    Cũng bán riêng
  16. Powered Non-powered Tools

    SWMS · 12 bước công việc

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    Cũng bán riêng
  17. Manual Handling

    SWMS · 18 bước công việc

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    Cũng bán riêng
  18. Formwork Decks-Columns-Stairs

    SWMS · 21 bước công việc

    Formwork Decks-Columns-Stairs SWMS: 21 job steps covering formwork design, tools, working at height, crane lifts, stripping and emergencies.

    Cũng bán riêng
  19. Concrete Sawing and Core Drilling

    SWMS · 13 bước công việc

    SWMS for using a hand-held, electric or petrol/diesel-powered concrete saw and core drill, with silica dust, fuel and electrical controls.

    Cũng bán riêng
  20. Concrete Slab on Ground

    SWMS · 17 bước công việc

    Safe work method statement for concrete slab on ground work, covering formwork, fill and steel reinforcement placement, with the hazards and controls for each job step.

    Cũng bán riêng
  21. Crane Truck Mounted

    SWMS · 16 bước công việc

    SWMS for truck-mounted cranes such as Hiabs: 16 job steps from training and road operation to pre-lift checks, loading and unloading, and emergency response.

    Cũng bán riêng
  22. Floor Grinder

    SOP · 10 phần

    Safe operating procedure for a floor grinder: hazards, PPE, inspection, dust precautions, maintenance, operation, manual handling and a hazard checklist.

    Cũng bán riêng

Nội dung bao gồm

Các mối nguy được đề cập

Luật và tiêu chuẩn được dẫn chiếu

Mỗi SWMS đều đi kèm danh sách tham chiếu luật và bộ quy tắc thực hành (codes of practice) của chúng tôi.

Bạn tiết kiệm được gì

MẫuBước công việcMua riêng
Wall Saw0$89.95 · 1 lượt mở mẫu
Mobile Plant Working Near-Around8$89.95 · 1 lượt mở mẫu
Demolition Saw - Fuel Operated0$89.95 · 1 lượt mở mẫu
Handheld Power Tools0$89.95 · 1 lượt mở mẫu
Concrete Placement and Finishing13$89.95 · 1 lượt mở mẫu
Jackhammer0$89.95 · 1 lượt mở mẫu
Manual Handling0$89.95 · 1 lượt mở mẫu
Concrete Cutter - Fuel Powered0$89.95 · 1 lượt mở mẫu
Handheld Circular Saw0$89.95 · 1 lượt mở mẫu
Concrete Foundations Excavating - Pouring17$89.95 · 1 lượt mở mẫu
Silica Dust14$89.95 · 1 lượt mở mẫu
Hand Tools0$89.95 · 1 lượt mở mẫu
Outdoor Work0$89.95 · 1 lượt mở mẫu
Concrete Core Drill0$89.95 · 1 lượt mở mẫu
Concrete Steel Fixing15$89.95 · 1 lượt mở mẫu
Powered Non-powered Tools12$89.95 · 1 lượt mở mẫu
Manual Handling18$89.95 · 1 lượt mở mẫu
Formwork Decks-Columns-Stairs21$89.95 · 1 lượt mở mẫu
Concrete Sawing and Core Drilling13$89.95 · 1 lượt mở mẫu
Concrete Slab on Ground17$89.95 · 1 lượt mở mẫu
Crane Truck Mounted16$89.95 · 1 lượt mở mẫu
Floor Grinder0$89.95 · 1 lượt mở mẫu
Mua từng mẫu$1,978.90 · 22 lượt mở mẫu
Trong gói này$1,439.20 · 16 lượt mở mẫu Bạn tiết kiệm $539.70

Đánh giá

Chưa có đánh giá nào.

Cách các mẫu hoạt động

Dùng thử trước khi trả tiền.

  1. Xem trước miễn phí

    Các bước công việc, mối nguy và nhiệm vụ đầu tiên của mọi mẫu đều mở để đọc. Không cần đăng ký.

  2. Thử trình soạn thảo

    Chỉnh một SWMS demo theo công ty, công việc và công trường của bạn, trên máy tính hoặc điện thoại.

  3. Đăng ký miễn phí

    Thông tin và logo của bạn được chuyển sang. Mẫu này sẽ mở ra với thông tin đã điền sẵn.

  4. Dùng một lượt hoặc mua một lần

    Các gói trả phí có lượt mở mẫu mỗi tháng. Hoặc mua mẫu này để giữ lại.