Seven SWMS for crane hire businesses and crane operators: mobile cranes, tower cranes, mini cranes, self-erecting cranes, truck-mounted cranes and dogging.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost six template credits instead of seven.

Xem trước SWMS Tower Crane

Tower Crane

SWMSVersion 7
Company doing the work
[Company]
Business contact
—
Phone #
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile Plant
  • Gas Mains
  • Hazardous Lines
  • Energised Electrical
  • Falls
  • Hazardous Atmosphere

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Contact with overhead electric lines

      Before controls4 Acute
      Controls
      • Liaise with electrical entities where necessary regarding the supply of electricity and control measures for working around existing power supply (e.g. de-energising powerlines) including loading bays and site access.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Inadequate crane team

      Before controls3 High
      Controls
      • Assess the size and complexity of the work to be undertaken

      • Determine the crane crew required for the task. Consider:

        • Number of operators and doggers required

        • Number of riggers required for the activities

        • Whether a trained safety observer is required for maintaining electrical exclusion zones

        • Whether a crane coordinator should be appointed.

      After controls2 Moderate
      Responsible
    • Hazard

      Lack of training resulting in injuries & fatalities

      Before controls4 Acute
      Controls
      • All operators have the appropriate licences for Crane Operation, Rigging or Dogging as appropriate

        • E.g. Crane – Tower cranes (CT)

        • E.g. Dogman – Dogging

        • E.g. Rigger – Basic rigging - Intermediate rigging - Advanced rigging

      • Trained and competent to operate the type of crane and attachments they are using

      • Refresher training is undertaken on an ongoing basis.

      After controls2 Moderate
      Responsible

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

Thêm 12 bước công việc, từ Arrival on-site & assess onsite conditions đến Emergency response

Mỗi bước đều có mối nguy, mức rủi ro và biện pháp kiểm soát, cùng phần ký nhận của đội.

Xem trước dạng

Hiển thị thế nào trên trình duyệt

Lấy gói tiết kiệm này

Đăng ký miễn phí, rồi chọn cách bạn muốn lấy. Mọi tài liệu sẽ vào Thư viện của bạn, trong một thư mục mang tên gói.

  • Có trong các gói trả phí

    Dùng lượt mở mẫu trong gói dịch vụ của bạn. Gói này cần 6 lượt thay vì 7 lượt.

    So sánh các gói và giá
  • Mua một lần

    $539.70 $629.65 trả một lần, và mẫu là của bạn mãi mãi. Dùng được cả với gói Miễn phí.

Không cần thẻ để đăng ký. Thành viên truy cập sớm được giảm 30% cho mọi gói.

Gói gồm những gì

  1. Tower Crane

    SWMS · 13 bước công việc

    SWMS for tower crane work: planning, work area set-up, climbing the tower, pre-start checks, crane operation, re-fuelling and emergency response.

    Cũng bán riêng
  2. Dogman

    SWMS · 12 bước công việc

    A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.

    Cũng bán riêng
  3. Lock Out Tag Out (LOTO)

    SWMS · 12 bước công việc

    SWMS for lock out tag out of plant and equipment: isolation procedures, permits, locks and tags, electrical isolation and returning plant to service.

    Cũng bán riêng
  4. Mini Crane

    SWMS · 16 bước công việc

    Mini Crane SWMS: 16 job steps from planning and set-up to crane placement near power lines, load equipment, lifting, maintenance and emergencies.

    Cũng bán riêng
  5. Mobile Crane

    SWMS · 16 bước công việc

    Mobile Crane SWMS: 16 job steps covering power lines, set-up, load equipment checks, lifting, maintenance, refuelling and emergencies.

    Cũng bán riêng
  6. Crane Self-Erecting

    SWMS · 19 bước công việc

    Crane Self-Erecting SWMS: 19 job steps from lift planning and erecting the crane to workboxes, re-fuelling and emergency response.

    Cũng bán riêng
  7. Crane Truck Mounted

    SWMS · 16 bước công việc

    SWMS for truck-mounted cranes such as Hiabs: 16 job steps from training and road operation to pre-lift checks, loading and unloading, and emergency response.

    Cũng bán riêng

Nội dung bao gồm

Các mối nguy được đề cập

Luật và tiêu chuẩn được dẫn chiếu

Mỗi SWMS đều đi kèm danh sách tham chiếu luật và bộ quy tắc thực hành (codes of practice) của chúng tôi.

Bạn tiết kiệm được gì

MẫuBước công việcMua riêng
Tower Crane13$89.95 · 1 lượt mở mẫu
Dogman12$89.95 · 1 lượt mở mẫu
Lock Out Tag Out (LOTO)12$89.95 · 1 lượt mở mẫu
Mini Crane16$89.95 · 1 lượt mở mẫu
Mobile Crane16$89.95 · 1 lượt mở mẫu
Crane Self-Erecting19$89.95 · 1 lượt mở mẫu
Crane Truck Mounted16$89.95 · 1 lượt mở mẫu
Mua từng mẫu$629.65 · 7 lượt mở mẫu
Trong gói này$539.70 · 6 lượt mở mẫu Bạn tiết kiệm $89.95

Đánh giá

Chưa có đánh giá nào.

Cách các mẫu hoạt động

Dùng thử trước khi trả tiền.

  1. Xem trước miễn phí

    Các bước công việc, mối nguy và nhiệm vụ đầu tiên của mọi mẫu đều mở để đọc. Không cần đăng ký.

  2. Thử trình soạn thảo

    Chỉnh một SWMS demo theo công ty, công việc và công trường của bạn, trên máy tính hoặc điện thoại.

  3. Đăng ký miễn phí

    Thông tin và logo của bạn được chuyển sang. Mẫu này sẽ mở ra với thông tin đã điền sẵn.

  4. Dùng một lượt hoặc mua một lần

    Các gói trả phí có lượt mở mẫu mỗi tháng. Hoặc mua mẫu này để giữ lại.