Demolition - Vessel

SWMS · SWMS-10659

Xem trước mẫu SWMS Demolition - Vessel
  • 16 bước công việc
  • Phiên bản 3
  • Demolition
  • Đọc được trên mọi điện thoại

This Demolition - Vessel Safe Work Method Statement (SWMS) gives guidance for safely demolishing a vessel with an excavator. It sets out the hazards of the work and the control measures that help keep everyone on site safe and compliant with the relevant regulations.

It takes your crew through 16 job steps: checking the weather, arriving on site, setting up a safe work zone, environment, housekeeping and manual tasks, then delivering and removing the excavator, communicating with pedestrian ground workers, demolishing the vessel, loading trucks and skips, trimming steel with a grinder or cut-off saw, changing and using attachments, fuelling, finishing up and emergency response.

It includes controls for high-risk construction work with mobile plant, pressurised gas mains, chemical lines and potentially flammable or contaminated atmospheres, and for electrical equipment, slips, trips and falls, night work and hot work.

It suits businesses and contractors demolishing vessels, and the safety officers and site supervisors who run the work. Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

Xem trước SWMS Demolition - Vessel

Demolition - Vessel

SWMSVersion 3

Document details

Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile Plant
  • Gas Mains
  • Hazardous Lines
  • Energised Electrical
  • Hazardous Atmosphere

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Seat Belt

Job steps, hazards and controls

  • Work activity

    Working outdoors

    • Hazard

      Disease

      Before controls3 High
      Controls
      • First Aid requirements:

        • Provision of first aid equipment - adequate Bites/Stings First Aid kit is available

        • Each worker must have access to the equipment

        • Workers have access to facilities for the administration of first aid

        • Ensure vaccinations (such as Hepatitis B, tetanus) offered for staff

        • people with known allergic responses should consult a doctor and ensure an appropriate kit is available at all times (Including EpiPen - in date).

      After controls2 Moderate
      Responsible
      • SupervisorMaintain awareness of weather conditions
      • OperatorFollow controls
    • Hazard

      Extreme weather

      Before controls3 High
      Controls
      • Check weather conditions – do not work in extreme conditions

      • Reschedule works to work in more moderate temperatures.

      After controls2 Moderate
      Responsible
      • SupervisorMaintain awareness of weather conditions
      • OperatorFollow controls
    • Hazard

      Hyperthermia / Hypothermia

      Before controls3 High
      Controls
      • Ensure vehicle cabin is air-conditioned

      • Workers trained to recognise the symptoms of hyperthermia and hypothermia

      • Hot conditions. Ensure:

        • Suitable protective clothing

        • Sun brim on hard hats

        • Safety glasses - UV rated

        • Use 30+ sunscreen on exposed skin

        • Adequate drinking water

        • Access to shade on breaks

        • Adequate breaks.

      • Cold conditions. Ensure:

        • Schedule warm-up breaks

        • Hold breaks inside

        • Dress warmly in layers

        • Stay dry (wet clothing chills the body rapidly)

        • Workers must get out of the cold as soon as they can if starting to feel symptoms

        • Alcohol, cigarettes, caffeine and certain medications increase susceptibility to cold.

      After controls2 Moderate
      Responsible
      • SupervisorMaintain awareness of weather conditions
      • OperatorFollow controls

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

Thêm 15 bước công việc, từ Arrival on-site & assess onsite conditions đến Emergency response

Mỗi bước đều có mối nguy, mức rủi ro và biện pháp kiểm soát, cùng phần ký nhận của đội.

Xem trước dạng

Hiển thị thế nào trên trình duyệt

Lấy mẫu này

Đăng ký miễn phí, rồi chọn cách bạn muốn lấy. Thông tin công ty của bạn sẽ được điền sẵn.

  • Có trong các gói trả phí

    Dùng lượt mở mẫu trong gói dịch vụ của bạn. Mẫu này cần 1 lượt.

    So sánh các gói và giá
  • Mua một lần

    $89.95 trả một lần, và mẫu là của bạn mãi mãi. Dùng được cả với gói Miễn phí.

Không cần thẻ để đăng ký. Thành viên truy cập sớm được giảm 30% cho mọi gói.

Nội dung bao gồm

16 bước công việc

  1. Working outdoorsCheck the weather and prepare for working outdoors.
  2. Arrival on-site & assess onsite conditionsAssess the site conditions on arrival and set up safely.
  3. Establish safe work zone (site set-up)Set up a safe work zone, especially next to public areas.
  4. EnvironmentReduce the environmental impact of the demolition work.
  5. House keepingKeep the site clean and orderly to prevent slips and trips.
  6. Manual tasksHandle materials and equipment to avoid musculoskeletal injuries.
  7. Delivery, set-up & removal of the excavatorDeliver, set up and remove the excavator, including near electric lines.
  8. Establish a communication system with pedestrian ground workersSet up clear communication with pedestrian ground workers.
  9. Vessel demolitionDemolish the vessel with the excavator, using the right precautions.
  10. Loading trucks/skipsLoad trucks and skips without injury or property damage.
  11. Trimming steel using grinder or cut-off sawTrim steel with a grinder or cut-off saw and prevent fires.
  12. Changing attachmentsChange excavator attachments safely.
  13. Operations with hydraulic attachmentsUse hydraulic attachments safely.
  14. Fuelling the plantRefuel the plant and prevent fires and exposure to fuel.
  15. On completionSecure the site and the excavator when the work is complete.
  16. Emergency responseRespond to emergencies during the demolition work.

Các mối nguy được đề cập

Đánh giá

Chưa có đánh giá nào.

Xem tất cả

Cách các mẫu hoạt động

Dùng thử trước khi trả tiền.

  1. Xem trước miễn phí

    Các bước công việc, mối nguy và nhiệm vụ đầu tiên của mọi mẫu đều mở để đọc. Không cần đăng ký.

  2. Thử trình soạn thảo

    Chỉnh một SWMS demo theo công ty, công việc và công trường của bạn, trên máy tính hoặc điện thoại.

  3. Đăng ký miễn phí

    Thông tin và logo của bạn được chuyển sang. Mẫu này sẽ mở ra với thông tin đã điền sẵn.

  4. Dùng một lượt hoặc mua một lần

    Các gói trả phí có lượt mở mẫu mỗi tháng. Hoặc mua mẫu này để giữ lại.