Concrete Grinding and Polishing

SWMS · SWMS-10060

  • 14 bước công việc
  • Phiên bản 8

This Concrete Grinding and Polishing Safe Work Method Statement (SWMS) outlines the safety protocols and hazard controls for operating a floor grinder or polisher on concrete floors.

It covers 14 job steps, from out-of-hours work, working alone, arriving on site and setting up the work area to grinding and polishing, impregnating and protecting concrete, fuelling on site, completion and emergency response.

It includes controls for silica dust, electrical hazards, chemicals and spills, fire, noise and manual tasks, and for the environment.

It suits floor grinding and polishing contractors, construction and renovation firms, facility management services and site supervisors.

Xem trang riêng

Xem trước SWMS Concrete Grinding and Polishing

Concrete Grinding and Polishing

SWMSVersion 8
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—

Site management plan

Is the work associated with a Construction Project?

  • Yes

  • No

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile Plant
  • Hazardous Atmosphere

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Breathing Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Out-of-hours / night work

    • Hazard

      Fatigue; Unauthorised access

      Before controls3 High
      Controls
      • Allow adequate meal breaks for workers; especially if they have worked during part of the day, they will need time to rest & recover sufficiently to work safely into the evening/night

      • Do not schedule full double shifts for workers as worker fatigue increases the risk of incidents

      • Workers have access to:

        • Suitable amenities (toilets/wash facilities/drinking water)

        • Sufficient lighting (including parking areas)

        • Air conditioning and heating

        • Mechanical ventilation if required

        • Emergency exits

        • Safe area for parking/unloading equipment – protected from rain

      • Ensure that adequate lighting will be available

      • No worker should work alone on the site at night.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

Thêm 13 bước công việc, từ Working alone đến Emergency response

Mỗi bước đều có mối nguy, mức rủi ro và biện pháp kiểm soát, cùng phần ký nhận của đội.

Xem trước dạng

Hiển thị thế nào trên trình duyệt

Lấy gói tiết kiệm này

Đăng ký miễn phí, rồi chọn cách bạn muốn lấy. Mọi tài liệu sẽ vào Thư viện của bạn, trong một thư mục mang tên gói.

  • Có trong các gói trả phí

    Dùng lượt mở mẫu trong gói dịch vụ của bạn. Gói này cần 11 lượt thay vì 14 lượt.

    So sánh các gói và giá
  • Mua một lần

    $989.45 $1,259.30 trả một lần, và mẫu là của bạn mãi mãi. Dùng được cả với gói Miễn phí.

Không cần thẻ để đăng ký. Thành viên truy cập sớm được giảm 30% cho mọi gói.

Nội dung bao gồm

14 bước công việc

  1. Out-of-hours / night workManage fatigue and site access when working out of hours or at night
  2. Working aloneKeep in contact and have emergency procedures when working alone
  3. Arrival on-site & assess onsite conditionsPark safely, report in and check the site on arrival
  4. Work area set-upBarricade the work area and control electrical, fire, debris and silica dust hazards
  5. EnvironmentControl noise, dust, waste, fuels and chemicals to protect the environment
  6. House keepingKeep the work area clean and free of trip hazards
  7. Manual tasksHandle materials and the grinder without strain
  8. Working with powered & non-powered toolsCheck and use tools as the manufacturer directs
  9. Hazardous substance /chemical useUse hazardous substances as the SDS directs
  10. Grinding & polishingSet up and operate the floor grinder safely
  11. Impregnating and protecting concreteApply HTC products and manage chemicals and spills
  12. Fuelling on siteRefuel away from ignition sources with an extinguisher on hand
  13. On completionClean up silica dust, decontaminate and sign out
  14. Emergency responseCall 000, follow emergency procedures and give first aid

Các mối nguy được đề cập

Cách các mẫu hoạt động

Dùng thử trước khi trả tiền.

  1. Xem trước miễn phí

    Các bước công việc, mối nguy và nhiệm vụ đầu tiên của mọi mẫu đều mở để đọc. Không cần đăng ký.

  2. Thử trình soạn thảo

    Chỉnh một SWMS demo theo công ty, công việc và công trường của bạn, trên máy tính hoặc điện thoại.

  3. Đăng ký miễn phí

    Thông tin và logo của bạn được chuyển sang. Mẫu này sẽ mở ra với thông tin đã điền sẵn.

  4. Dùng một lượt hoặc mua một lần

    Các gói trả phí có lượt mở mẫu mỗi tháng. Hoặc mua mẫu này để giữ lại.