Shipping Container Unloading

SWMS · SWMS-10226

  • 10 bước công việc
  • Phiên bản 2

This SWMS covers the safe and efficient unloading of goods and equipment from inside shipping containers. It sets out the hazards and controls for the unique risks of container unloading, to protect your workers and comply with Australian regulations.

It takes your crew through each step, from work area set-up and environmental considerations to opening containers, forklift operation, pallet jacks and trolleys, unpacking sheet material, completion, and emergency response. Forklift operation and completion are marked as high-risk construction work.

It suits businesses and workers in the logistics, construction and warehousing sectors, particularly those responsible for unloading shipping containers.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

Xem trang riêng

Xem trước SWMS Shipping Container Unloading

Shipping Container Unloading

SWMSVersion 2
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the construction project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW – identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Traffic CorridorsWork carried out adjacent to a road, railway or shipping lane, traffic corridor

Planning and preparation

Planning/preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work.

(specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended, if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Seat Belt

Job steps, hazards and controls

  • Work activityHRCW

    Work area set-up

    • Hazard

      Container placement

      Before controls3 High
      Controls
      • Set containers on flat area to prevent rollover and content shifts.

      • Prioritise secure locations for container placement; use barriers and signage to limit access if security isn't achievable.

      • Ensure ample space for unpacking activities.

      • Keep the container away from overhead electric wires.

      After controls2 Moderate
      Responsible
      • Operatorto ensure control measures followed
    • Hazard

      Traffic/public access

      Before controls3 High
      Controls
      • If loading/unloading/setting-up roadside – comply with local laws and permits

      • Barricading controls are implemented and authorised as part of the safe work system to protect people from hazards

      • Establish exclusion zones to stop people from entering the area

      • Signage in place to caution people not to enter

      • Public footpath or roadway exclusion zone:

        • Seek approval from the relevant authority; safely direct people to an alternative footpath where required

        • Lane closures and other operations requiring barricades and signs must meet local road traffic authority, local government authorities' requirements

      • Use a spotter as required - designate a responsible person for controlling the immediate area where the operation is occurring

      • Responsible person to authorise entry into the area

      • The barricade must be far enough to keep observers safe.

      After controls2 Moderate
      Responsible
      • Operatorto ensure control measures followed

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

Thêm 9 bước công việc, từ Environment đến Emergency response

Mỗi bước đều có mối nguy, mức rủi ro và biện pháp kiểm soát, cùng phần ký nhận của đội.

Xem trước dạng

Hiển thị thế nào trên trình duyệt

Lấy gói tiết kiệm này

Đăng ký miễn phí, rồi chọn cách bạn muốn lấy. Mọi tài liệu sẽ vào Thư viện của bạn, trong một thư mục mang tên gói.

  • Có trong các gói trả phí

    Dùng lượt mở mẫu trong gói dịch vụ của bạn. Gói này cần 5 lượt thay vì 6 lượt.

    So sánh các gói và giá
  • Mua một lần

    $449.75 $539.70 trả một lần, và mẫu là của bạn mãi mãi. Dùng được cả với gói Miễn phí.

Không cần thẻ để đăng ký. Thành viên truy cập sớm được giảm 30% cho mọi gói.

Nội dung bao gồm

10 bước công việc

  1. Work area set-upPlace the container safely and control access
  2. EnvironmentManage noise, spills and weather
  3. House keepingKeep the work area clean and free of slip and trip hazards
  4. Manual tasksReduce the strain of manual tasks
  5. Opening containersOpen the container doors safely and manage chemical exposure
  6. Forklift operationOperate the forklift safely around pedestrians
  7. Using pallet jacks and trolleysUse pallet jacks and trolleys without dropping or striking
  8. Unpacking sheet materialUnpack sheet material securely
  9. On completionMake equipment safe, clean up and secure the container
  10. Emergency responseRespond to injuries and emergencies

Các mối nguy được đề cập

Cách các mẫu hoạt động

Dùng thử trước khi trả tiền.

  1. Xem trước miễn phí

    Các bước công việc, mối nguy và nhiệm vụ đầu tiên của mọi mẫu đều mở để đọc. Không cần đăng ký.

  2. Thử trình soạn thảo

    Chỉnh một SWMS demo theo công ty, công việc và công trường của bạn, trên máy tính hoặc điện thoại.

  3. Đăng ký miễn phí

    Thông tin và logo của bạn được chuyển sang. Mẫu này sẽ mở ra với thông tin đã điền sẵn.

  4. Dùng một lượt hoặc mua một lần

    Các gói trả phí có lượt mở mẫu mỗi tháng. Hoặc mua mẫu này để giữ lại.