Ưu đãi truy cập sớm:Truy cập sớm: giảm 30%, chừng nào bạn vẫn còn đăng ký.

Nhận ưu đãi

Các tài liệu mẫu được soạn bằng tiếng Anh.

Gói tiết kiệm · 18 mẫu

Glazing Combo

Gói tiết kiệm · PACK-50403

Xem trước mẫu Gói tiết kiệm Glazing Combo
  • 18 mẫu
  • 18 mẫu với giá của 13 mẫu
  • Được đưa vào một thư mục trong Thư viện

A set of eight SWMS, seven SOPs, one plan and two forms for glaziers.

The SWMS cover glazing, structural glazing, vacuum lifting attachments, glass lifters and window and door frames. The SOPs include Mobile Scaffolding, Hand Tools and Platform Ladder. It also includes Falls Emergency Rescue Plan, SOP Template and JSEA Template.

Each document is the same one sold on its own, so you get every update to it. Together they cost 13 template credits instead of 18.

Xem trước SWMS Height Access Equipment

Height Access Equipment

SWMSVersion 11
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • FallsRisk of a person falling more than two metres. Note: in some jurisdictions this is three metres.
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (How to Manage Work Health and Safety Risks) Code of Practice 2015
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (How to Manage Work Health and Safety Risks Code of Practice) Approval 2025
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2025
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • How to manage work health and safety risks code of practice 2019
  • Managing the work environment and facilities code of practice 2019
  • Construction work code of practice 2019

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • How to manage work health and safety risks - Code of practice 2026
  • Managing the work environment and facilities - Code of practice 2026
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • How to Manage Work Health and Safety Risks: Code of practice 2020
  • Managing the Work Environment and Facilities: Code of practice 2020
  • Construction work Code of Practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • How to Manage Work Health and Safety Risks - Code of practice 2024
  • Managing the Work Environment and Facilities - Code of practice 2024
  • Construction Work - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • How to manage work health and safety risks – Code of practice 2022
  • Managing the work environment and facilities – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Ensure site-specific induction undertaken

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures for unanticipated hazards.

      After controls2 Moderate
      Responsible
      • SupervisorCheck the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

Thêm 16 bước công việc, từ Work area set-up đến Emergency response

Mỗi bước đều có mối nguy, mức rủi ro và biện pháp kiểm soát, cùng phần ký nhận của đội.

Xem trước dạng

Hiển thị thế nào trên trình duyệt

Lấy gói tiết kiệm này

Đăng ký miễn phí, rồi chọn cách bạn muốn lấy. Mọi tài liệu sẽ vào Thư viện của bạn, trong một thư mục mang tên gói.

  • Có trong các gói trả phí

    Dùng lượt mở mẫu trong gói dịch vụ của bạn. Gói này cần 13 lượt thay vì 18 lượt.

    So sánh các gói và giá
  • Mua một lần

    $1,169.35 $1,619.10 trả một lần, và mẫu là của bạn mãi mãi. Dùng được cả với gói Miễn phí.

Không cần thẻ để đăng ký. Thành viên truy cập sớm được giảm 30% cho mọi gói.

Gói gồm những gì

  1. Height Access Equipment

    SWMS · 17 bước công việc

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    Cũng bán riêng
  2. Glazing

    SWMS · 15 bước công việc

    A glazing SWMS covering cutting, drilling, grinding and installing glass balustrades, windows, doors, shower screens and mirrors.

    Cũng bán riêng
  3. Falls Emergency Rescue Plan

    Kế hoạch quản lý · 14 phần

    A pre-planned procedure for rescuing a worker who has fallen and is suspended in a harness, with a pre-planning checklist and a site-specific rescue plan.

    Cũng bán riêng
  4. Glazing Vacuum Lifting Attachment

    SWMS · 13 bước công việc

    Glazing vacuum lifting attachment SWMS: 13 job steps from training and site checks to lifter operation, attachment changes and emergencies.

    Cũng bán riêng
  5. Manual Handling

    SWMS · 18 bước công việc

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    Cũng bán riêng
  6. Glazing Structural

    SWMS · 14 bước công việc

    Controls for structural glazing, covering mobile plant, asbestos, gas mains, energised services and falls, across 14 job steps.

    Cũng bán riêng
  7. SOP Template

    Biểu mẫu · 9 trường

    A Standard/Safe Operating Procedure (SOP) template for writing step-by-step procedures specific to your business tasks.

    Cũng bán riêng
  8. JSEA Template

    Biểu mẫu · 8 trường

    A Job Safety & Environmental Analysis (JSEA) form to complete before work starts on a new site or on arrival at the site each day.

    Cũng bán riêng
  9. Building Maintenance Unit BMU

    SWMS · 12 bước công việc

    Building Maintenance Unit BMU SWMS: 12 job steps covering BMU set-up, fall restraint, falls rescue, electrical hazards and emergency response.

    Cũng bán riêng
  10. Aluminium Window Door Frame Installation

    SWMS · 15 bước công việc

    Aluminium window and door frame installation SWMS: 15 job steps from silica training and site set-up to scaffolds, cutting, fixing frames and emergencies.

    Cũng bán riêng
  11. Glass Lifter

    SWMS · 15 bước công việc

    Glass Lifter SWMS: 15 job steps covering transport, set-up, lifter operation, crane lifts, maintenance, battery charging and emergencies.

    Cũng bán riêng
  12. Hand Tools

    SOP · 9 phần

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    Cũng bán riêng
  13. Platform Ladder

    SOP · 7 phần

    Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.

    Cũng bán riêng
  14. Trestle Scaffold

    SOP · 7 phần

    Safe operating procedure for trestle scaffolds: hazards, PPE, training, pre-operational inspection, step-by-step operation and a training register.

    Cũng bán riêng
  15. Utility-Box Cutter Knife

    SOP · 7 phần

    Safe operating procedure for a utility-box cutter knife: hazards, PPE, precautions, operation, emergency response and a training register.

    Cũng bán riêng
  16. Mobile Scaffolding

    SOP · 8 phần

    Safe operating procedure for mobile scaffolding: hazards, PPE, inspection, erecting, moving and dismantling, and a working at height checklist.

    Cũng bán riêng
  17. Scissor Lift

    SOP · 10 phần

    Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.

    Cũng bán riêng
  18. Handheld Power Tools

    SOP · 9 phần

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    Cũng bán riêng

Nội dung bao gồm

Các mối nguy được đề cập

Luật và tiêu chuẩn được dẫn chiếu

Mỗi SWMS đều đi kèm danh sách tham chiếu luật và bộ quy tắc thực hành (codes of practice) của chúng tôi.

Bạn tiết kiệm được gì

MẫuBước công việcMua riêng
Height Access Equipment17$89.95 · 1 lượt mở mẫu
Glazing15$89.95 · 1 lượt mở mẫu
Falls Emergency Rescue Plan0$89.95 · 1 lượt mở mẫu
Glazing Vacuum Lifting Attachment13$89.95 · 1 lượt mở mẫu
Manual Handling18$89.95 · 1 lượt mở mẫu
Glazing Structural14$89.95 · 1 lượt mở mẫu
SOP Template0$89.95 · 1 lượt mở mẫu
JSEA Template0$89.95 · 1 lượt mở mẫu
Building Maintenance Unit BMU12$89.95 · 1 lượt mở mẫu
Aluminium Window Door Frame Installation15$89.95 · 1 lượt mở mẫu
Glass Lifter15$89.95 · 1 lượt mở mẫu
Hand Tools0$89.95 · 1 lượt mở mẫu
Platform Ladder0$89.95 · 1 lượt mở mẫu
Trestle Scaffold0$89.95 · 1 lượt mở mẫu
Utility-Box Cutter Knife0$89.95 · 1 lượt mở mẫu
Mobile Scaffolding0$89.95 · 1 lượt mở mẫu
Scissor Lift0$89.95 · 1 lượt mở mẫu
Handheld Power Tools0$89.95 · 1 lượt mở mẫu
Mua từng mẫu$1,619.10 · 18 lượt mở mẫu
Trong gói này$1,169.35 · 13 lượt mở mẫu Bạn tiết kiệm $449.75

Đánh giá

Chưa có đánh giá nào.

Cách các mẫu hoạt động

Dùng thử trước khi trả tiền.

  1. Xem trước miễn phí

    Các bước công việc, mối nguy và nhiệm vụ đầu tiên của mọi mẫu đều mở để đọc. Không cần đăng ký.

  2. Thử trình soạn thảo

    Chỉnh một SWMS demo theo công ty, công việc và công trường của bạn, trên máy tính hoặc điện thoại.

  3. Đăng ký miễn phí

    Thông tin và logo của bạn được chuyển sang. Mẫu này sẽ mở ra với thông tin đã điền sẵn.

  4. Dùng một lượt hoặc mua một lần

    Các gói trả phí có lượt mở mẫu mỗi tháng. Hoặc mua mẫu này để giữ lại.