Inadequate planning and design

Hazards that go unrecognised or uncontrolled because the work, site conditions or design were not planned, assessed or consulted on beforehand.

Trang này hiện chỉ có bằng tiếng Anh.

Họp an toàn ngắn miễn phí về inadequate planning and design

Còn gọi là: Harm from lack of planning, Inadequate preparation for tasks, Failure to assess risk, Lack of design input, Design failures, Unidentified hazards, Lack of consultation, Failure to update site conditions

Cách kiểm soát inadequate planning and design

  1. Consider safety in design before work starts, and ask designers and engineers to remove or reduce hazards at source.
  2. Plan the job in steps before starting, including access, equipment, sequence, emergency arrangements and who does what.
  3. Assess the risks for the task and site conditions, and review the assessment when conditions or the scope of work change.
  4. Consult workers, other contractors and the person in control of the site, and share the plan with everyone who is affected.
  5. Do a pre-start walk-through and update the hazards at the start of each shift, noting anything that has changed.
  6. Monitor hazards throughout the job, and stop work to reassess if something unexpected comes up.

Các biện pháp kiểm soát thường dùng, hiệu quả nhất xếp trước. SWMS của bạn quy định biện pháp kiểm soát cho chính công việc và công trường của bạn.

Các mẫu đề cập Inadequate planning and design

Gói tiết kiệm · 13 mẫu

Boilermaker

Gói tiết kiệm · PACK-50413

13 mẫu với giá của 10 mẫu

+9
Gói tiết kiệm · 53 mẫu

Builders

Gói tiết kiệm · PACK-50173

53 mẫu với giá của 28 mẫu

+49

Xem tất cả 75 mẫu

SWMS theo ngành nghề

Các mối nguy thường đi kèm

Luật mà những mẫu này dẫn chiếu