Inadequate planning and design
Hazards that go unrecognised or uncontrolled because the work, site conditions or design were not planned, assessed or consulted on beforehand.
Trang này hiện chỉ có bằng tiếng Anh.
Họp an toàn ngắn miễn phí về inadequate planning and design
Còn gọi là: Harm from lack of planning, Inadequate preparation for tasks, Failure to assess risk, Lack of design input, Design failures, Unidentified hazards, Lack of consultation, Failure to update site conditions
Cách kiểm soát inadequate planning and design
- Consider safety in design before work starts, and ask designers and engineers to remove or reduce hazards at source.
- Plan the job in steps before starting, including access, equipment, sequence, emergency arrangements and who does what.
- Assess the risks for the task and site conditions, and review the assessment when conditions or the scope of work change.
- Consult workers, other contractors and the person in control of the site, and share the plan with everyone who is affected.
- Do a pre-start walk-through and update the hazards at the start of each shift, noting anything that has changed.
- Monitor hazards throughout the job, and stop work to reassess if something unexpected comes up.
Các biện pháp kiểm soát thường dùng, hiệu quả nhất xếp trước. SWMS của bạn quy định biện pháp kiểm soát cho chính công việc và công trường của bạn.
Các mẫu đề cập Inadequate planning and design















Gói tiết kiệm · 10 mẫu


+6
Gói tiết kiệm · 18 mẫu


+14
Hệ thống · 115 tài liệu


+111
Hệ thống · 99 tài liệu
+95
Gói tiết kiệm · 13 mẫu


+9
Gói tiết kiệm · 47 mẫu


+43
Hệ thống · 127 tài liệu


+123
Hệ thống · 143 tài liệu

+139