Ưu đãi truy cập sớm:Truy cập sớm: giảm 30%, chừng nào bạn vẫn còn đăng ký.

Nhận ưu đãi

Các tài liệu mẫu được soạn bằng tiếng Anh.

Dùng thử trình soạn thảo miễn phí

Hệ thống · 133 tài liệuThuộc Landscaping Integrated Industry Suite

Tree Felling - Manual

SWMS · SWMS-10278

  • 15 bước công việc
  • Phiên bản 7

This Tree Felling - Manual Safe Work Method Statement (SWMS) covers the hazards and controls of felling trees by hand, including chainsaw use, working near power lines and protecting workers and the public.

It covers 15 job steps, from training, planning and checking the weather, through arrival on-site, work area set-up, the environment, housekeeping and manual tasks, to powered and non-powered tools, tree felling, cross-cutting, moving and loading felled trees, fuelling on-site, completion and emergency response.

It includes controls for high-risk construction work around mobile plant, energised electrical services, hazardous atmospheres and traffic corridors, and an emergency response for injuries, fatalities and environmental damage.

It suits businesses and professionals in arboriculture, forestry, landscaping and any operation that involves manual tree felling.

Xem trang riêng

Xem trước SWMS Tree Felling - Manual

Tree Felling - Manual

SWMSVersion 7
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW – identified in the Job Task column):

  • Mobile Plant
  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous LinesChemical, fuel or refrigerant lines
  • Energised ElectricalEnergised electrical installations or services
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere
  • Traffic CorridorsWork carried out adjacent to a road, railway or shipping lane, traffic corridor

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Training

    • Hazard

      Untrained workers

      Before controls4 Acute
      Controls
      • Ensure operators are trained and experienced in understanding tree felling operations

      • Trained in determining tree height

      • Accredited chainsaw operator (advanced felling if dealing with hazardous trees)

      • All relevant workers involved in the use of a chainsaw must be suitably trained and deemed competent to operate the chainsaw

      • Chainsaw training of operators must include:

        • Review of operating manual

        • Starting the chainsaw and cutting techniques

        • Removal of the guard for maintenance work including restrictions on who may do the work

        • Actions, including who and how to notify, if a guard is found removed or missing

        • Practical instructions on how to replace and sharpen the chain

      • Knowledge of dangerous tree types.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Roadside work

      Before controls4 Acute
      Controls
      • All people working adjacent to traffic appropriately trained.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

Thêm 14 bước công việc, từ Planning đến Emergency response

Mỗi bước đều có mối nguy, mức rủi ro và biện pháp kiểm soát, cùng phần ký nhận của đội.

Xem trước dạng

Hiển thị thế nào trên trình duyệt

Lấy hệ thống này

Đăng ký miễn phí, rồi chọn cách bạn muốn lấy. Mọi tài liệu sẽ vào Thư viện của bạn, trong một thư mục mang tên gói.

  • Có trong các gói trả phí

    Dùng lượt mở mẫu trong gói dịch vụ của bạn. Mẫu này cần 20 lượt.

    So sánh các gói và giá
  • Mua một lần

    $999.90 trả một lần, và mẫu là của bạn mãi mãi. Dùng được cả với gói Miễn phí.

Không cần thẻ để đăng ký. Thành viên truy cập sớm được giảm 30% cho mọi gói.

Nội dung bao gồm

15 bước công việc

  1. TrainingTrain operators in tree felling and chainsaw use
  2. PlanningGet an electrical permit before working within the safe approach distance of power lines
  3. Check weather conditions & prepareCheck the weather and prepare for heat, cold, bites, stings and hazardous plants
  4. Arrival on-site & assess onsite conditionsPark safely, report in and assess the site and the tree
  5. Work area set-upSet up traffic management, barriers and a clearance zone
  6. EnvironmentControl noise, waste, fuels, runoff and harm to vegetation and fauna
  7. House keepingKeep the work area clear to prevent slips, trips and falls
  8. Manual tasksLift and move materials safely to avoid strain injuries
  9. Working with powered & non-powered toolsInspect and use tools as the manufacturer instructs
  10. Tree fellingClear the area, plan escape routes and fell the tree
  11. Cross-cuttingCross-cut safely, watching for limbs under tension
  12. Moving & loading felled treesKeep groundworkers clear and control loads when moving felled trees
  13. Fuelling on-siteRefuel safely with no smoking and the right extinguisher
  14. On completionAdjust barricades, sign out and use designated routes
  15. Emergency responseCall 000, follow emergency procedures and give first aid

Các mối nguy được đề cập

Cách các mẫu hoạt động

Dùng thử trước khi trả tiền.

  1. Xem trước miễn phí

    Các bước công việc, mối nguy và nhiệm vụ đầu tiên của mọi mẫu đều mở để đọc. Không cần đăng ký.

  2. Thử trình soạn thảo

    Chỉnh một SWMS demo theo công ty, công việc và công trường của bạn, trên máy tính hoặc điện thoại.

  3. Đăng ký miễn phí

    Thông tin và logo của bạn được chuyển sang. Mẫu này sẽ mở ra với thông tin đã điền sẵn.

  4. Dùng một lượt hoặc mua một lần

    Các gói trả phí có lượt mở mẫu mỗi tháng. Hoặc mua mẫu này để giữ lại.