Ưu đãi truy cập sớm:Truy cập sớm: giảm 30%, chừng nào bạn vẫn còn đăng ký.

Nhận ưu đãi

Các tài liệu mẫu được soạn bằng tiếng Anh.

Hệ thống · 115 tài liệuThuộc Party Hire OHS/WHS Industry Suite

Inflatable Amusement Device

SWMS · SWMS-10690

  • 12 bước công việc
  • Phiên bản 1

This SWMS offers a structured approach to safely managing inflatable amusement devices at events or worksites. It covers every step so that safety requirements are met, risks are minimised and both operators and patrons are protected.

It takes you through planning, training and competency, maintaining the log book, manual handling, transporting the device, parking and unloading, assessing on-site conditions, setting up, operating the device, dismantling, emergency response and incident management, with risk assessments and control measures for each step.

It suits event organisers, amusement companies and any business that operates inflatable devices and needs to manage workplace risks and meet health and safety laws.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

Xem trang riêng

Xem trước SWMS Inflatable Amusement Device

Inflatable Amusement Device

SWMSVersion 1
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site Management Plan

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Energised ElectricalEnergised electrical installations or services

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • The principal contractor will confirm that emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. Specify?

Training and licences

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on-site

  • All workers are trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings, toolbox talks

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences.

  • SWMS is to be reviewed and amended, if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards are identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS must be informed ASAP.

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Hand Protection
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Lack of planning

      Before controls3 High
      Controls
      • Ensure the device is registered if required.

      • Implement an emergency plan and ensure all workers are trained.

      • Provide accessible first aid equipment and trained personnel.

      • Obtain any necessary council permits or landowner permissions before setting up the inflatable device, ensuring compliance with local regulations.

      After controls2 Moderate
      Responsible
      • Supervisorto ensure all appropriate requirements are met

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

Thêm 11 bước công việc, từ Training and competency đến Incident management

Mỗi bước đều có mối nguy, mức rủi ro và biện pháp kiểm soát, cùng phần ký nhận của đội.

Xem trước dạng

Hiển thị thế nào trên trình duyệt

Lấy hệ thống này

Đăng ký miễn phí, rồi chọn cách bạn muốn lấy. Mọi tài liệu sẽ vào Thư viện của bạn, trong một thư mục mang tên gói.

  • Có trong các gói trả phí

    Dùng lượt mở mẫu trong gói dịch vụ của bạn. Mẫu này cần 20 lượt.

    So sánh các gói và giá
  • Mua một lần

    $999.90 trả một lần, và mẫu là của bạn mãi mãi. Dùng được cả với gói Miễn phí.

Không cần thẻ để đăng ký. Thành viên truy cập sớm được giảm 30% cho mọi gói.

Nội dung bao gồm

12 bước công việc

  1. PlanningCoordinate with the principal contractor and confirm emergency response procedures.
  2. Training and competencyConfirm workers' certifications, training and knowledge of emergency procedures.
  3. Maintaining the log bookKeep accurate records of device maintenance, repairs and operations.
  4. Manual handling during:Handle the device safely when loading, unloading, setting up and dismantling.
  5. Transporting the deviceSecure the device during transport to prevent damage.
  6. Parking and unloadingPark vehicles and unload the device and equipment safely.
  7. Assess on-site conditionsAssess ground stability, environmental risks and electrical hazards before setup.
  8. Setting upAnchor the device and check it for misalignment or damage before use.
  9. Operating the deviceOperate the device safely, monitoring patron behaviour, overcrowding and high winds.
  10. DismantlingDismantle the device and inspect it for damage before transport.
  11. Emergency responseFollow emergency procedures, including evacuation and device deflation.
  12. Incident managementReport and document incidents and address any safety issues.

Các mối nguy được đề cập

Cách các mẫu hoạt động

Dùng thử trước khi trả tiền.

  1. Xem trước miễn phí

    Các bước công việc, mối nguy và nhiệm vụ đầu tiên của mọi mẫu đều mở để đọc. Không cần đăng ký.

  2. Thử trình soạn thảo

    Chỉnh một SWMS demo theo công ty, công việc và công trường của bạn, trên máy tính hoặc điện thoại.

  3. Đăng ký miễn phí

    Thông tin và logo của bạn được chuyển sang. Mẫu này sẽ mở ra với thông tin đã điền sẵn.

  4. Dùng một lượt hoặc mua một lần

    Các gói trả phí có lượt mở mẫu mỗi tháng. Hoặc mua mẫu này để giữ lại.