Ưu đãi truy cập sớm:Truy cập sớm: giảm 30%, chừng nào bạn vẫn còn đăng ký.

Nhận ưu đãi

Các tài liệu mẫu được soạn bằng tiếng Anh.

Security Guard - Construction

SWMS · SWMS-10236

Xem trước mẫu SWMS Security Guard - Construction
  • 11 bước công việc
  • Đã được mua 48 lần
  • Phiên bản 6
  • Miscellaneous
  • Đọc được trên mọi điện thoại

This Security Guard - Construction Safe Work Method Statement (SWMS) covers the hazards and controls associated with the activities security guards working at sites under construction would undertake.

It covers 11 job steps, from night work, working alone, equipment training and checking the weather, through working near powered mobile plant, travel, arrival on site, site patrol and CCTV observation, to completion and emergency response.

It includes controls for fatigue, working alone, unauthorised people and aggressive behaviour, driving, noise, sharps and body fluids, and static positions.

It suits security firms, construction site managers and safety officers, and the security guards assigned to construction sites.

Xem trước SWMS Security Guard - Construction

Security Guard - Construction

SWMSVersion 6
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile PlantMobile plant movement

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e. no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/Review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-Specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Head Protection
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Night work

    • Hazard

      Fatigue; Inadequate amenities

      Before controls3 High
      Controls
      • Allow for adequate meal breaks for guards, especially if they have worked during part of the day, they will need time to rest and recover sufficiently to work safely into the evening/night

      • Do not schedule full double shifts for guards as worker fatigue increases the risk of incidents

      • Where guards work shifts are longer than 8 hours, the pace and duration of repetitive work or sustained effort should be reviewed and reduced where necessary

      • Ensure to schedule additional security personnel on-site to ensure no unauthorised access by the general public while work is being performed

      • Guards have access to:

        • Suitable amenities (toilets/wash facilities/drinking water)

        • Sufficient lighting (including parking areas)

        • Air conditioning and heating

        • Mechanical ventilation if required

        • Emergency exits lit and unblocked

        • Safe area for parking-protected from the rain.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

Thêm 10 bước công việc, từ Working alone đến Emergency response

Mỗi bước đều có mối nguy, mức rủi ro và biện pháp kiểm soát, cùng phần ký nhận của đội.

Xem trước dạng

Hiển thị thế nào trên trình duyệt

Lấy mẫu này

Đăng ký miễn phí, rồi chọn cách bạn muốn lấy. Thông tin công ty của bạn sẽ được điền sẵn.

  • Có trong các gói trả phí

    Dùng lượt mở mẫu trong gói dịch vụ của bạn. Mẫu này cần 1 lượt.

    So sánh các gói và giá
  • Mua một lần

    $89.95 trả một lần, và mẫu là của bạn mãi mãi. Dùng được cả với gói Miễn phí.

Không cần thẻ để đăng ký. Thành viên truy cập sớm được giảm 30% cho mọi gói.

Nội dung bao gồm

11 bước công việc

  1. Night workManage fatigue and give guards adequate breaks and amenities at night
  2. Working aloneUse a buddy system and a call-in protocol when working alone
  3. Training in the use of equipmentMaintain, inspect and use equipment to the manufacturer's instructions
  4. Check weather conditions & prepareCheck the weather and prepare for hot or cold conditions
  5. Working near powered mobile plantFollow the traffic management plan and keep clear of mobile plant
  6. Travel to & between sitesDrive safely, check the vehicle and manage driver fatigue
  7. Arrival on-site & assess onsite conditionsPark safely, report to the site supervisor and assess the site
  8. Construction site patrolObserve and report, and deal safely with unauthorised people
  9. Observation by CCTVSet up the seat and workstation for CCTV monitoring
  10. On completionFollow communication protocols, sign out and report incidents
  11. Emergency responseCall 000, follow site emergency procedures and give first aid

Các mối nguy được đề cập

Đánh giá

Chưa có đánh giá nào.

Xem tất cả

Cách các mẫu hoạt động

Dùng thử trước khi trả tiền.

  1. Xem trước miễn phí

    Các bước công việc, mối nguy và nhiệm vụ đầu tiên của mọi mẫu đều mở để đọc. Không cần đăng ký.

  2. Thử trình soạn thảo

    Chỉnh một SWMS demo theo công ty, công việc và công trường của bạn, trên máy tính hoặc điện thoại.

  3. Đăng ký miễn phí

    Thông tin và logo của bạn được chuyển sang. Mẫu này sẽ mở ra với thông tin đã điền sẵn.

  4. Dùng một lượt hoặc mua một lần

    Các gói trả phí có lượt mở mẫu mỗi tháng. Hoặc mua mẫu này để giữ lại.