Suspended Powered Scaffolds Working On

SWMS · SWMS-10537

Xem trước mẫu SWMS Suspended Powered Scaffolds Working On
  • 12 bước công việc
  • Đã được mua 43 lần
  • Phiên bản 4
  • Working at Height
  • Đọc được trên mọi điện thoại

This SWMS covers the hazards and controls for working on suspended powered scaffold systems, including swing stages and cradles hung from hoists.

It takes your crew through each step, from planning and the falls emergency rescue plan to site set-up, weather, environment, pre-use inspection, working on the scaffold, completion and emergency response, including suspension trauma.

It suits construction managers, safety officers and scaffold workers on construction and maintenance work that uses suspended scaffolds.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

Xem trước SWMS Suspended Powered Scaffolds Working On

Suspended Powered Scaffolds Working On

SWMSVersion 4
Company doing the work
[Company]
Responsible person (for monitoring SWMS and work)
—
Principal Contractor (PC)
[Principal contractor]
Business contact
—
Phone
—
PC address
—
Signature
—
Date
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Contact phone
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • FallsInvolves a risk of a person falling from 2m or more, including work on telecommunications towers
  • Telecom TowersInvolves a risk of a person falling from 2m or more, including work on telecommunications towers
  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous LinesChemical, fuel or refrigerant lines
  • Energised ElectricalEnergised electrical installations or services

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

Planning/preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Head Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Incorrect system design; system collapse

      Before controls4 Acute
      Controls
      • All components of the suspended scaffold designed and approved by a competent person. (e.g. engineer)

      • Purpose-built suspended scaffolds must:

        • Be verified by an engineer

        • Be clearly marked with the brand name, model number, and serial number

        • Be clearly marked with its capacity and intended use

        • Clearly display the mass in kg of any movable or removable counterweights.

      • Before operating the scaffold, a written statement that the scaffold is complete and safe for use supplied by the person responsible for erecting or altering the scaffold.

      After controls2 Moderate
      Responsible
      • Supervisorto confirm the correct system
    • Hazard

      Falling objects

      Before controls4 Acute
      Controls
      • Planning access to the height location:

        • Wherever possible, use mechanical methods to deliver materials to the working at height location, e.g. crane.

        • Ensure all crane operators, riggers and doggers are licenced, competent and trained in the activity

        • If delivering material/tools onto a raised platform, liaise with Principal to determine where on the platform, the materials are safe to be dropped to:

          • Be able to bear the load

          • Not cause hazards to other trade.

      After controls2 Moderate
      Responsible
      • Supervisorto confirm the correct system

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

Thêm 11 bước công việc, từ Implement a Falls Emergency Rescue Plan đến Emergency response

Mỗi bước đều có mối nguy, mức rủi ro và biện pháp kiểm soát, cùng phần ký nhận của đội.

Xem trước dạng

Hiển thị thế nào trên trình duyệt

Lấy mẫu này

Đăng ký miễn phí, rồi chọn cách bạn muốn lấy. Thông tin công ty của bạn sẽ được điền sẵn.

  • Có trong các gói trả phí

    Dùng lượt mở mẫu trong gói dịch vụ của bạn. Mẫu này cần 1 lượt.

    So sánh các gói và giá
  • Mua một lần

    $89.95 trả một lần, và mẫu là của bạn mãi mãi. Dùng được cả với gói Miễn phí.

Không cần thẻ để đăng ký. Thành viên truy cập sớm được giảm 30% cho mọi gói.

Nội dung bao gồm

12 bước công việc

  1. PlanningHave a competent person design and approve the scaffold
  2. Implement a Falls Emergency Rescue PlanPut the falls rescue plan in place
  3. Arrival on-site & assess onsite conditionsAssess the site conditions and complete a JSA
  4. Work area set-upSet up the work area, exclusion zones and anchor points
  5. Check weather conditions & prepareCheck the weather and prepare for hot or cold conditions
  6. EnvironmentManage noise, waste, waterways, vehicle movement and fauna
  7. House keepingKeep the work area clean and clear
  8. Manual tasksReduce the risk of manual task injuries
  9. Pre-inspect systemInspect the scaffold system and equipment before use
  10. Working on the suspended scaffoldFollow the controls when working on the suspended scaffold
  11. On completionSecure the scaffold when work is done
  12. Emergency responseRespond to an emergency, including suspension trauma

Các mối nguy được đề cập

Đánh giá

  • Very professional document

    James WhelanĐã xác minh mua hàng

Xem tất cả

Cách các mẫu hoạt động

Dùng thử trước khi trả tiền.

  1. Xem trước miễn phí

    Các bước công việc, mối nguy và nhiệm vụ đầu tiên của mọi mẫu đều mở để đọc. Không cần đăng ký.

  2. Thử trình soạn thảo

    Chỉnh một SWMS demo theo công ty, công việc và công trường của bạn, trên máy tính hoặc điện thoại.

  3. Đăng ký miễn phí

    Thông tin và logo của bạn được chuyển sang. Mẫu này sẽ mở ra với thông tin đã điền sẵn.

  4. Dùng một lượt hoặc mua một lần

    Các gói trả phí có lượt mở mẫu mỗi tháng. Hoặc mua mẫu này để giữ lại.