抢先体验优惠:抢先体验: 30% 折扣,只要保持订阅就一直有效.

领取优惠

模板文件为英文。

免费试用编辑器

体系 · 121 份文件属于Automotive Servicing & Repair OHS-WHS Industry Suite

Wheel Alignment Machine

SOP · SOP-60217

  • 版本 3

The Wheel Alignment Machine Safe Operating Procedure (SOP) helps businesses use a wheel alignment machine safely, from the hazards and precautions to the steps for preparing the vehicle, connecting the equipment and finishing the job.

It covers the hazards (rotating parts, ejected objects, electricity, manual handling and poor housekeeping), the PPE to wear, operator training, the pre-operational inspection, and maintenance under lockout/tagout (LOTO) procedures with a maintenance log.

A hazard checklist for powered non-mobile plant, with Y, N and NA for each item, helps confirm every safety measure is in place before work starts.

查看单独页面

Wheel Alignment Machine SOP 预览

Wheel Alignment Machine

SOPVersion 3

Acronyms

  • LOTO - Lockout/Tagout.

  • PPE - Personal Protective Equipment.

  • SOP - Safe Operating Procedure.

Hazards

What can cause harm?

  • Rotating parts

  • Ejected objects

  • Electricity

  • Manual Handling

  • Poor housekeeping

Personal protective equipment

  • Foot Protection
  • Eye ProtectionAlways wear safety glasses; wear approved safety goggles when servicing.
  • Hand ProtectionWear gloves whenever performing work near hot components.

Pre-operational inspection

Close-up of a wheel alignment machine clamp and sensor head mounted on a car wheel

Follow the pre-operational checklist in the manufacturer's operational manual, ensure:

  • All decals are legible

  • E-stop is functional

  • All controls are working

  • Do not use faulty equipment

  • Immediately report suspect machinery.

还有 4 个章节,从“Precautions”到“Hazard checklist (powered non-mobile plant)”

内容完整,只需填上你公司的信息。

预览方式

在浏览器中的样子

获取这个体系

免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。

  • 付费套餐包含

    使用套餐中的模板额度。这一份需要 20 个额度。

    比较套餐和价格
  • 单独购买

    $999.90 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

涵盖内容

8 个章节

  1. Hazards
  2. Personal protective equipment
  3. Pre-operational inspection
  4. Precautions
  5. Operation
  6. Maintenance
  7. Hazard checklist (powered non-mobile plant)

另附术语定义

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。