Biohazard Clean-up

SWMS · SWMS-10654

Biohazard Clean-up SWMS模板预览
  • 15 个工作步骤
  • 已售出 97 次
  • 版本 2
  • Cleaning
  • 任何手机都能看

This SWMS covers the hazards and controls for biohazard clean-up work, so the tasks are carried out safely and in line with Australian legislation. It sets out the hazards, risks and controls for handling biohazardous materials.

It takes your crew through 15 job steps, from planning, arriving on site and setting up the work area to removing affected materials, cleaning, water extraction, waste disposal, decontamination, completion and emergency response.

It suits commercial cleaning companies, restoration services, healthcare facilities maintenance and environmental services.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

Biohazard Clean-up SWMS 预览

Biohazard Clean-up

SWMSVersion 2
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/Review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Hard Hat
  • Face Protection
  • Hand Protection
  • Protective Clothing
  • Respirator
  • Protective Mask
  • Biohazard Waste

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Fatigue; unauthorised access; insecure workplace

      Before controls3 High
      Controls
      • Out-of-hours / night work:

        • Allow adequate meal breaks for workers; especially if they have worked during part of the day, they will need time to rest & recover sufficiently to work safely into the evening/night

        • Do not schedule full double shifts for workers as worker fatigue increases the risk of incidents

        • Workers have access to:

          • Suitable amenities (toilets/wash facilities/drinking water)

          • Sufficient lighting (including parking areas)

          • Mechanical ventilation if required

          • Safe area for parking/unloading equipment

          • Suitable area for decanting and storage of cleaning chemicals with sufficient ventilation

      • Additional security personnel on-site to ensure no unauthorised access by the general public while work is being performed

      • No worker should work alone on the site at night.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Confined space

      Before controls4 Acute
      Controls
      • All people entering confined spaces must have attended an accredited training course in safe working in confined space and hold current accreditation

      • Content of confined space entry permits

      • Emergency response and rescue.

      • If working in a confined space, ensure there are separate, dedicated SWMS in place for entry/rescue and that all workers/employees have relevant training and licensing.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Crush injuries; electric shock; burns

      Before controls4 Acute
      Controls
      • If required to clean areas on, in or adjacent to mobile plant, machinery, or another hazardous area

        • Ensure any machinery or equipment at site stored in a safe condition (not able to be accidentally turned on, safety guards in place)

        • Ensure machinery is safely locked out and tagged

        • Ensure all energised electrical installations are made safe (safely locked out and tagged).

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Infection; disease; allergic reaction

      Before controls3 High
      Controls
      • Ensure vaccinations (such as Hepatitis B, tetanus etc.) are offered for staff.

      • people with known allergic responses should consult a doctor and ensure appropriate kit is available at all times (Including EpiPen - in date).

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 14 个工作步骤,从“Arrival on-site & assess onsite conditions”到“Emergency response”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个模板

免费注册,然后选择获取方式。你的公司信息会自动填好。

  • 付费套餐包含

    使用套餐中的模板额度。这一份需要 1 个额度。

    比较套餐和价格
  • 单独购买

    $89.95 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

涵盖内容

15 个工作步骤

  1. PlanningPlan the work and prepare for safe biohazard clean-up
  2. Arrival on-site & assess onsite conditionsAssess the site conditions on arrival
  3. Work area set-upSet up a safe work area
  4. EnvironmentControl the impact on the environment
  5. House keepingKeep the work area clean and tidy
  6. Manual tasksHandle materials and equipment safely
  7. Working with powered & non-powered toolsUse powered and non-powered tools safely
  8. Working at height on ladders & trestlesWork at height safely on ladders and trestles
  9. Removal of carpets, furniture & other affected porous materials including plasterboard & concreteRemove contaminated porous materials safely
  10. Cleaning, biohazard-affected areaClean the biohazard-affected area thoroughly
  11. Water extractionExtract water from contaminated areas safely
  12. Waste disposalDispose of biohazardous waste safely
  13. DecontaminationDecontaminate equipment and personnel
  14. On completionFinish the clean-up and leave the site clean
  15. Emergency responseRespond to emergencies during the clean-up

涵盖的危险

评价

暂无评价。

查看全部

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。