抢先体验优惠:抢先体验: 30% 折扣,只要保持订阅就一直有效.

领取优惠

模板文件为英文。

免费试用编辑器

体系 · 129 份文件属于Carpentry on Construction Integrated Industry Suite

V Cut Mitre Saw

SOP · SOP-60012

  • 版本 4

The V Cut Mitre Saw Safe Operating Procedure (SOP) gives clear, step-by-step instructions for operating a V cut mitre saw safely and reducing the risks that come with it.

It covers the hazards (noise, electricity, blades, moving parts, manual handling and poor housekeeping), the PPE to wear, operator training, the pre-operational inspection, blade replacement, step-by-step operation, maintenance and shutdown.

A hazard checklist for powered non-mobile plant, with Y, N and NA for each item, helps confirm every safety measure is in place.

查看单独页面

V Cut Mitre Saw SOP 预览

V Cut Mitre Saw

SOPVersion 4

Acronyms

  • LOTO - Lockout/Tagout.

  • PPE - Personal Protective Equipment.

  • SOP - Safe Operating Procedure.

  • SDS – Safety Data Sheet.

Hazards

What can cause harm?

  • Noise

  • Electricity

  • Blades

  • Moving parts

  • Manual Handling

  • Poor housekeeping

Personal protective equipment

  • Foot Protection
  • Hearing Protection

Pre-operational inspection

Mitre saw with blade guard, rotating scale and clamps
  • Follow the pre-operational checklist in the manufacturer’s operational manual, ensure:

    • The correct blade has been selected & installed

    • The blade is secured, sharp and turns freely

    • All guards are in position, are in good working order

    • All keys and adjusting wrenches are removed from the saw.

Blade replacement

  • Replace cracked, chipped, or damaged blades immediately

还有 5 个章节,从“Precautions”到“Hazard checklist (powered non-mobile plant)”

内容完整,只需填上你公司的信息。

预览方式

在浏览器中的样子

获取这个体系

免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。

  • 付费套餐包含

    使用套餐中的模板额度。这一份需要 20 个额度。

    比较套餐和价格
  • 单独购买

    $999.90 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

涵盖内容

10 个章节

  1. Hazards
  2. Personal protective equipment
  3. Pre-operational inspection
  4. Blade replacement
  5. Precautions
  6. Operation
  7. Maintenance
  8. Shutdown / after use
  9. Hazard checklist (powered non-mobile plant)

另附术语定义

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。