Electricians Safety Management Plan

管理计划 · PLAN-20275

  • 8 个工作步骤
  • 版本 2

The Electricians Safety Management Plan helps electrical businesses meet legal requirements and set clear responsibilities for safety. It manages site-specific risks and ensures the plan is available for inspection by visitors, workers, contractors and other interested parties.

It sets out the safety policy and rules, risk management with hazard identification and controls, de-energised and live electrical work, electrical work testing, underground and overhead electrical services, auxiliary circuits, PV solar systems, fibre optics and isolation with lockout/tag-out.

It also covers training and site responsibilities, an emergency response plan, first aid and incident management, with appendices for a risk assessment form, equipment register, live work and isolation permits, a SWMS template and incident forms.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

查看单独页面

Electricians Safety Management Plan 预览

Electricians’ safety management plan

管理计划Version 2

Introduction

Management Commitment and Approval

The SMP has been approved and endorsed by (insert name of Owner/CEO or person in a senior management position) which demonstrates a commitment to this SMP.

Senior Management Sign-off:

Date:

Review Procedure

(Insert responsible person name) will review the Safety Management Plan (SMP) as required. The review schedule is in response to organisational and/or legislative changes and requirements. The reviews will be in consultation with workers, HSR and other relevant parties. All relevant persons will be made aware of changes made as a result of the review. Review of the SMP takes place when:

  • identified changes in the workplace affect the SMP; and

  • the SMP is not effective; and

  • there are legislative changes that affect the SMP; and

  • there is a serious incident or dangerous occurrence.

Document Control

The SMP is a controlled document. All unauthorised copies, either electronic or printed, are considered uncontrolled copies. Copyholders and the version numbers will be recorded in the distribution record. All versions of the SMP will have a unique document number and version number.

还有 8 个工作步骤,从“Electrical Work”到“Emergency response”

  1. Electrical Work Policy
  2. Risk Assessment
  3. Licensing
  4. Quality Control
  5. Electrical Safety Equipment and Instruments
  6. 另外还有 30 个

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个体系

免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。

  • 付费套餐包含

    使用套餐中的模板额度。这一份需要 20 个额度。

    比较套餐和价格
  • 单独购买

    $999.90 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

涵盖内容

8 个工作步骤

  1. Electrical WorkTrained and competent persons, dead circuits, safe isolation, calibrated test equipment and cable detection.
  2. Working with Hazardous materials (examples only)A competent person identifies hazardous materials, with the asbestos register, notes and correct PPE.
  3. Injury to othersSupervision, communication with occupants, exclusion zones and competent workers.
  4. Working at heightRemoving loose debris, hard hats and signs, a barrier safe zone and competent workers.
  5. Working with live servicesExisting plans, detection equipment, isolation of gas and electricity and a permit to work.
  6. Hot works, e.g. gas cutting and burningPPE, ventilation, competent workers, a Hot Work Permit, an end-of-shift check and gas bottle controls.
  7. Slips tripsCables taped down, waste removed, materials stored neatly and good housekeeping.
  8. Emergency responseCalling 000, site emergency and evacuation procedures, first aid and an incident report.

涵盖的危险

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。