抢先体验优惠:抢先体验: 30% 折扣,只要保持订阅就一直有效.

领取优惠

模板文件为英文。

Gutter Vacuuming

SWMS · SWMS-10686

Gutter Vacuuming SWMS模板预览
  • 17 个工作步骤
  • 已售出 50 次
  • 版本 1
  • Cleaning
  • 任何手机都能看

This SWMS covers the hazards and controls for gutter vacuuming, whether the work is done from the ground, from the roof or from an elevated work platform (EWP). It supports safety and compliance when you perform gutter vacuuming tasks.

It takes your crew through each step, from the falls emergency rescue plan, weather checks, transport in a trailer and site assessment, through work area set-up, vacuum operation and cleaning from the ground, the roof or an EWP, to fuelling, completion, emergency response and incident management.

It suits businesses and workers involved in gutter cleaning, especially those using vacuum systems from ground level, roofs or EWPs, and the safety officers and site supervisors who oversee the work.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

Gutter Vacuuming SWMS 预览

Gutter Vacuuming

SWMSVersion 1
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following "High-Risk Construction Work" (HRCW - identified in the Job Task column)

  • Asbestos
  • FallsInvolves a risk of a person falling from 2m or more, including work on telecommunications towers
  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous Lineschemical, fuel or refrigerant lines
  • Energised Electricalenergised electrical installations or services

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify onsite safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept onsite and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Implement a Falls Emergency Rescue Plan

    • Hazard

      Personal injury from fall

      Before controls4 Acute
      Controls
      • Trained first aid providers must be available.

      • A reliable means to contact emergency services is available.

      After controls2 Moderate
      Responsible
      • Supervisorto ensure the plan is in place

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 16 个工作步骤,从“Check weather conditions & prepare”到“Incident management”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个模板

免费注册,然后选择获取方式。你的公司信息会自动填好。

  • 付费套餐包含

    使用套餐中的模板额度。这一份需要 1 个额度。

    比较套餐和价格
  • 单独购买

    $89.95 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

涵盖内容

17 个工作步骤

  1. Implement a Falls Emergency Rescue PlanEstablish control measures for emergency response to falls.
  2. Check weather conditions & prepareCheck the weather and prepare for hot or cold conditions.
  3. Transporting equipment in a trailerSafely load, secure and transport equipment.
  4. Arrival onsite & assess onsite conditionsAssess the site conditions on arrival and set up for safe operations.
  5. Work area set-upSet up the work area with fall prevention in mind.
  6. EnvironmentImplement environmental controls to protect the property and surroundings.
  7. House keepingKeep the work area clean and safe to prevent slips, trips and falls.
  8. Manual tasksHandle and move materials safely to prevent musculoskeletal injuries.
  9. Hazardous chemical useHandle hazardous chemicals safely.
  10. Vacuum operationOperate the vacuum safely.
  11. Gutter cleaning from the groundControl the hazards of cleaning gutters from the ground.
  12. Gutter cleaning from the roofClean gutters from the roof using ladders, harnesses and safe roof access.
  13. Gutter cleaning from an EWPOperate the elevated work platform safely for gutter cleaning.
  14. Fuelling onsiteManage fuelling to prevent spills and accidents.
  15. On completionSecure the site and equipment after the work.
  16. Emergency responseRespond to emergencies and incidents effectively.
  17. Incident managementRespond to any incident that occurs during the job.

涵盖的危险

评价

暂无评价。

查看全部

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。