
Lead
Lead in old paint, dust, solder, pipes or batteries that can be breathed in or swallowed when work disturbs it.
本页面目前仅提供英文版。
又称:Lead disturbance, Exposure to lead, Lead paint, Lead dust, Lead exposure, Lead-based paint
如何控制lead
- Test suspect paint and material for lead before work, and assume old paint contains lead until it is tested.
- Choose methods that do not create lead dust, such as chemical stripping or wet scraping, and never dry sand, burn off or abrasive blast lead paint.
- Use on-tool extraction connected to a vacuum rated for hazardous dust, and clean up with wet methods rather than dry sweeping.
- Isolate the work area and keep other people out, and tell occupants and neighbours about the work.
- Set up a decontamination area, and wash hands and face before eating, drinking or smoking, and before leaving the site.
- Wear disposable coveralls and a fit-tested respirator suited to lead dust, bag lead waste and dispose of it at an approved facility.
常用的控制措施,最有效的排在前面。你的 SWMS 要针对你自己的工作和工地确定控制措施。
涵盖Lead的模板


超值套装 · 6 个模板


+2
超值套装 · 15 个模板


+11
体系 · 111 份文件
+107
体系 · 96 份文件


+92
超值套装 · 13 个模板


+9
超值套装 · 47 个模板


+43
体系 · 127 份文件


+123
体系 · 143 份文件

+139
超值套装 · 8 个模板


+4
超值套装 · 21 个模板

+17
超值套装 · 54 个模板


+50
体系 · 162 份文件


+158
超值套装 · 54 个模板


+50
体系 · 143 份文件

+139
超值套装 · 10 个模板


+6
超值套装 · 30 个模板


+26
体系 · 129 份文件


+125
体系 · 113 份文件


+109
超值套装 · 20 个模板


+16
体系 · 113 份文件
+109