Extension Ladder
Acronyms
LOTO - Lockout/Tagout.
PPE - Personal Protective Equipment.
SOP - Safe Operating Procedure.
模板文件为英文。
超值套装 · PACK-50362

A set of six SWMS, seven SOPs and two plans for licensed asbestos removalists.
The SWMS cover licensed asbestos removal, asbestos transport and disposal, demolition, roofing removal and power tools. The SOPs include Mobile Scaffolding, Extension Ladder and Handheld Power Tools. It also includes Falls Emergency Rescue Plan and Asbestos Removal Control Plan.
Each document is the same one sold on its own, so you get every update to it. Together they cost 12 template credits instead of 15.
Extension Ladder
LOTO - Lockout/Tagout.
PPE - Personal Protective Equipment.
SOP - Safe Operating Procedure.
在浏览器中的样子
免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。
$1,079.40 $1,349.25 一次付清,永久归你。免费套餐也能用。
注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。
Extension ladder safe operating procedure: hazards, pre-use inspection, transporting, set-up, use and carrying, with a training register.
也可单独购买SWMS for demolition: planning, disconnecting services, site systems, environment, mechanical and manual demolition, monitoring and emergencies.
也可单独购买A pre-planned procedure for rescuing a worker who has fallen and is suspended in a harness, with a pre-planning checklist and a site-specific rescue plan.
也可单独购买Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.
也可单独购买Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.
也可单独购买Safe work method statement for licensed removal of friable and non-friable asbestos over 10 m2, with 21 job steps from planning to clearance.
也可单独购买Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.
也可单独购买Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.
也可单独购买Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.
也可单独购买Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.
也可单独购买Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.
也可单独购买Roofing Removal SWMS: 13 job steps covering fall rescue planning, scaffold and ladder access, roof removal, asbestos and emergency response.
也可单独购买SWMS for transporting and disposing of asbestos-containing material: planning, loading and unloading, travel, environmental controls and emergency response.
也可单独购买A plan for those carrying out asbestos removal: identification, emergency plan, PPE, removal methods, waste, decontamination and an inspection checklist.
也可单独购买Safe operating procedure for mobile scaffolding: hazards, PPE, inspection, erecting, moving and dismantling, and a working at height checklist.
也可单独购买每份 SWMS 都附有我们的法规和实施规程参考清单。
| 模板 | 工作步骤 | 单独购买 |
|---|---|---|
| 0 | $89.95 · 1 个额度 | |
| 9 | $89.95 · 1 个额度 | |
| 0 | $89.95 · 1 个额度 | |
| 0 | $89.95 · 1 个额度 | |
| 0 | $89.95 · 1 个额度 | |
| 21 | $89.95 · 1 个额度 | |
| 0 | $89.95 · 1 个额度 | |
| 0 | $89.95 · 1 个额度 | |
| 12 | $89.95 · 1 个额度 | |
| 0 | $89.95 · 1 个额度 | |
| 18 | $89.95 · 1 个额度 | |
| 13 | $89.95 · 1 个额度 | |
| 8 | $89.95 · 1 个额度 | |
| 0 | $89.95 · 1 个额度 | |
| 0 | $89.95 · 1 个额度 | |
| 逐个购买 | ||
| 在本套装中 | $1,079.40 · 12 个额度 节省 $269.85 | |
暂无评价。
模板如何使用
每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。
在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。
你的信息和标志都会带过去。这个模板打开时已经填好。
付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。