抢先体验优惠:抢先体验: 30% 折扣,只要保持订阅就一直有效.

领取优惠

模板文件为英文。

免费试用编辑器
超值套装 · 54 个模板

Builders OHS-WHS Combo

超值套装 · PACK-50443

Builders OHS-WHS Combo 超值套装模板预览
  • 54 个模板
  • 54 份,只需 28 的价钱
  • 全部放入一个模板库文件夹

A set of 53 SWMS and one plan for builders and building contractors.

The SWMS cover site establishment, carpentry, roofing, scaffolding, plumbing and drainage, glazing and painting. It also includes Construction OHS/WHS Project Management Plan.

Each document is the same one sold on its own, so you get every update to it. Together they cost 28 template credits instead of 54.

Height Access Equipment SWMS 预览

Height Access Equipment

SWMSVersion 11
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • FallsRisk of a person falling more than two metres. Note: in some jurisdictions this is three metres.
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (How to Manage Work Health and Safety Risks) Code of Practice 2015
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (How to Manage Work Health and Safety Risks Code of Practice) Approval 2025
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2025
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • How to manage work health and safety risks code of practice 2019
  • Managing the work environment and facilities code of practice 2019
  • Construction work code of practice 2019

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • How to manage work health and safety risks - Code of practice 2026
  • Managing the work environment and facilities - Code of practice 2026
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • How to Manage Work Health and Safety Risks: Code of practice 2020
  • Managing the Work Environment and Facilities: Code of practice 2020
  • Construction work Code of Practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • How to Manage Work Health and Safety Risks - Code of practice 2024
  • Managing the Work Environment and Facilities - Code of practice 2024
  • Construction Work - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • How to manage work health and safety risks – Code of practice 2022
  • Managing the work environment and facilities – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Ensure site-specific induction undertaken

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures for unanticipated hazards.

      After controls2 Moderate
      Responsible
      • SupervisorCheck the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 16 个工作步骤,从“Work area set-up”到“Emergency response”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个超值套装

免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。

  • 付费套餐包含

    使用套餐中的模板额度。本套装只需 28 个额度,而不是 54 个。

    比较套餐和价格
  • 单独购买

    $2,518.60 $4,857.30 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

包含内容

  1. Height Access Equipment

    SWMS · 17 个工作步骤

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    也可单独购买
  2. Internal External Lock-Up Fix Stage Carpentry

    SWMS · 15 个工作步骤

    Covers internal and external lock-up and fix stage carpentry, with the risks and controls for each job step from site arrival to emergency response.

    也可单独购买
  3. Painting and Decorating

    SWMS · 15 个工作步骤

    SWMS for painting and decorating work: transport, site set-up, ladders and scaffolds, surface preparation, mixing, spraying and emergencies.

    也可单独购买
  4. Roof Work

    SWMS · 14 个工作步骤

    SWMS for roof work: hazards and controls for falls from height, asbestos, access by scaffold, ladder or hatch, harness use, tools and emergencies.

    也可单独购买
  5. Glazing

    SWMS · 15 个工作步骤

    A glazing SWMS covering cutting, drilling, grinding and installing glass balustrades, windows, doors, shower screens and mirrors.

    也可单独购买
  6. Mobile Plant Working Near-Around

    SWMS · 8 个工作步骤

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    也可单独购买
  7. Retaining Wall

    SWMS · 19 个工作步骤

    SWMS for building retaining walls: post and sleeper, masonry block and rock walls, from design and excavation to completion and emergencies.

    也可单独购买
  8. Roof Edge Protection

    SWMS · 16 个工作步骤

    SWMS for installing and dismantling roof edge protection using extension ladders, mobile scaffolding and safety harnesses.

    也可单独购买
  9. Garage Door Installation

    SWMS · 14 个工作步骤

    Garage Door Installation SWMS: 14 job steps covering silica dust, ladders, manual tasks, door opener wiring, tools, chemicals and emergencies.

    也可单独购买
  10. Insulation - Batts Installation

    SWMS · 12 个工作步骤

    SWMS for installing insulation batts in ceilings and walls: planning, delivery, ceiling space access, electricity, falls, asbestos, heat stress and fire.

    也可单独购买
  11. Erecting Fixed Scaffold

    SWMS · 14 个工作步骤

    Erecting Fixed Scaffold SWMS: 14 job steps from unloading and erecting to handover, dismantling and emergency response.

    也可单独购买
  12. Plumbing Drainage

    SWMS · 18 个工作步骤

    Plumbing drainage SWMS for installing pipes, stormwater tanks and polyethylene pipe welding, and for sewage and stormwater drainage on civil works.

    也可单独购买
  13. Final Building Clean Before Handover to Client

    SWMS · 10 个工作步骤

    SWMS for the final clean of a building before handover: site set-up, mobile plant, trestles and ladders, cleaning chemicals, manual tasks, dust and sharps.

    也可单独购买
  14. Rough-in Final Fit-out Plumbing

    SWMS · 18 个工作步骤

    Rough-in Final Fit-out Plumbing SWMS: 18 job steps covering pipework, appliances and fixtures, excavation, hot work, silica dust and emergencies.

    也可单独购买
  15. Timber Floor Laying

    SWMS · 13 个工作步骤

    Timber Floor Laying SWMS: 13 job steps covering delivery, underlay, timber boards, silica and wood dust, nail guns, adhesives and emergencies.

    也可单独购买
  16. Skip Bin

    SWMS · 11 个工作步骤

    Skip Bin SWMS: eleven job steps for skip bin delivery and pick-up with a truck-mounted skip lifter, from travel and set-up to emergency response.

    也可单独购买
  17. Concrete Boom or Line Pumping

    SWMS · 15 个工作步骤

    SWMS for truck-mounted concrete boom and line pumping: road travel, pump set-up, the pour, clearing line blockages, line cleaning and emergencies.

    也可单独购买
  18. Traffic Corridor - Establishing a Safe Work Zone

    SWMS · 8 个工作步骤

    Traffic corridor SWMS: 8 job steps covering the traffic management plan, safe work zone set-up, traffic controllers, pedestrians and zone takeouts.

    也可单独购买
  19. Construction Labourer

    SWMS · 16 个工作步骤

    Construction Labourer SWMS: 16 job steps for labourers on construction sites, from silica dust and mobile plant to ladders and emergency response.

    也可单独购买
  20. Temporary Fencing

    SWMS · 11 个工作步骤

    SWMS for temporary fencing: delivery, set-up, installation and removal, traffic and plant, manual tasks, housekeeping, completion and emergencies.

    也可单独购买
  21. Plasterboard

    SWMS · 16 个工作步骤

    Plasterboard SWMS for fixing and setting sheets to walls and ceilings, with cornice: 16 job steps from silica dust training to cutting, sanding and stilts.

    也可单独购买
  22. Decking

    SWMS · 19 个工作步骤

    SWMS for building a timber deck: falls from height, mobile plant, post footings, silica dust, wet cement and deck finishes.

    也可单独购买
  23. Brick and Block Laying

    SWMS · 22 个工作步骤

    SWMS for brick and block laying: silica dust, materials delivery, mortar, cutting and laying, core steel, acid washing, scaffolds and ladders, and emergencies.

    也可单独购买
  24. Concrete Foundations Excavating - Pouring

    SWMS · 17 个工作步骤

    SWMS for excavating, steel setting and pouring concrete foundations: 17 job steps from site set-up and plant delivery to the pour and emergencies.

    也可单独购买
  25. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 12 个工作步骤

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    也可单独购买
  26. Fencing

    SWMS · 16 个工作步骤

    Fencing SWMS: 16 job steps for wire, timber, steel panel, pool and glass panel fences, from planning to post holes, gates and emergencies.

    也可单独购买
  27. Duct Work Installation

    SWMS · 11 个工作步骤

    SWMS for installing ductwork for exhaust and air conditioning systems: site set-up, delivery, roof space work, tools, chemicals and emergencies.

    也可单独购买
  28. Working in Roof Spaces

    SWMS · 8 个工作步骤

    SWMS for working in roof spaces, ceiling spaces and subfloors: electrical hazards, ladders, heat stress, vermin, snakes and emergency response.

    也可单独购买
  29. Construction Site Visitor

    SWMS · 7 个工作步骤

    Construction Site Visitor SWMS: 7 job steps covering weather, site arrival, manual tasks, navigating the site and emergencies.

    也可单独购买
  30. Overhead Electric Lines - Working Near

    SWMS · 6 个工作步骤

    Overhead Electric Lines SWMS: 6 job steps covering exclusion zones, spotters, mobile plant near powerlines and emergency response.

    也可单独购买
  31. Construction OHS/WHS Project Management Plan

    管理计划 · 28 个章节

    A construction OHS/WHS site management plan covering site rules, risk management, contractors, incidents and the forms and registers a project needs.

    也可单独购买
  32. Earthmoving Equipment

    SWMS · 23 个工作步骤

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    也可单独购买
  33. Timber Floor Sanding and Finishing

    SWMS · 14 个工作步骤

    SWMS for sanding indoor timber floors and applying varnish or similar coatings: set-up, tools, dust, chemicals, refuelling and emergencies.

    也可单独购买
  34. Cladding

    SWMS · 12 个工作步骤

    SWMS for installing cladding or siding, such as Hardie plank, on the outside of structures: delivery, access, silica dust, tools and emergencies.

    也可单独购买
  35. Cabinet Installation

    SWMS · 12 个工作步骤

    SWMS for cabinet making and installation: client consultation, site set-up, tools, hazardous substances, dust control, ladders, cuts and emergencies.

    也可单独购买
  36. Air Conditioning Installation

    SWMS · 16 个工作步骤

    Covers installing, maintaining or repairing air conditioning units, with the risks and controls for each job step from planning to emergency response.

    也可单独购买
  37. Dogman

    SWMS · 12 个工作步骤

    A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.

    也可单独购买
  38. Rendering

    SWMS · 14 个工作步骤

    SWMS for rendering: silica dust, weather, work area set-up, ladders and scaffolds, surface preparation, render mixing, fuelling and emergency response.

    也可单独购买
  39. Electrical New Installation

    SWMS · 20 个工作步骤

    SWMS for new electrical installations: planning, site set-up, tools, ladders, live work, excavation, switchboards, testing and emergencies.

    也可单独购买
  40. Powered Non-powered Tools

    SWMS · 12 个工作步骤

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    也可单独购买
  41. Plumbing Gas Fitting

    SWMS · 21 个工作步骤

    Plumbing Gas Fitting SWMS: 21 job steps for gas fitting work, from planning and excavation to pipework, purging and pressure testing.

    也可单独购买
  42. Manual Handling

    SWMS · 18 个工作步骤

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    也可单独购买
  43. Carpet Laying

    SWMS · 14 个工作步骤

    A Carpet Laying SWMS covering the hazards and controls for installing carpets and carpet tiles, from floor preparation to laying, trimming and seaming.

    也可单独购买
  44. Tiling

    SWMS · 14 个工作步骤

    Tiling SWMS: 14 job steps covering silica dust, weather, delivery, ladders and scaffold, tile cutting, completion and emergencies.

    也可单独购买
  45. Awnings Blinds Curtains Installation

    SWMS · 14 个工作步骤

    SWMS for installing awnings, blinds and curtains: site set-up, tools, working at height on ladders and trestles, drilling brackets, mounting and emergencies.

    也可单独购买
  46. Excavation Near Assets

    SWMS · 13 个工作步骤

    SWMS for excavating near underground services and assets: site planning, survey, work area set-up, contact with utilities and emergency response.

    也可单独购买
  47. Plumbing - Water Meter Installation

    SWMS · 16 个工作步骤

    Plumbing SWMS for installing water meters: 16 job steps from site assessment and electrical hazards to excavation, confined space and emergency response.

    也可单独购买
  48. Concrete Slab on Ground

    SWMS · 17 个工作步骤

    Safe work method statement for concrete slab on ground work, covering formwork, fill and steel reinforcement placement, with the hazards and controls for each job step.

    也可单独购买
  49. Waterproofing

    SWMS · 12 个工作步骤

    SWMS for waterproofing internal wet areas, balconies and rooftops: site set-up, tools, working at height, membranes and torch-on work.

    也可单独购买
  50. Floating Floor Laying

    SWMS · 14 个工作步骤

    Covers safe floating floor installation, with the risks and controls for each job step from site arrival to emergency response.

    也可单独购买
  51. Aluminium Window Door Frame Installation

    SWMS · 15 个工作步骤

    Aluminium window and door frame installation SWMS: 15 job steps from silica training and site set-up to scaffolds, cutting, fixing frames and emergencies.

    也可单独购买
  52. Framing and Trusses - Timber-Steel

    SWMS · 15 个工作步骤

    SWMS for erecting timber and steel framing and trusses: delivery, working at height, standing frames, craning and bracing trusses, and emergency response.

    也可单独购买
  53. Site Establishment

    SWMS · 11 个工作步骤

    Site Establishment SWMS: 11 job steps from planning and traffic management to tools, site set-up, working at height and emergency response.

    也可单独购买
  54. Port-a-loo Service

    SWMS · 8 个工作步骤

    Covers servicing a port-a-loo: cleaning, pump-out of the sewage tank and adding deodorising chemicals, with the hazards and controls for each job step.

    也可单独购买

涵盖内容

涵盖的危险

引用的法规和标准

每份 SWMS 都附有我们的法规和实施规程参考清单。

你能省多少

模板工作步骤单独购买
Height Access Equipment17$89.95 · 1 个额度
Internal External Lock-Up Fix Stage Carpentry15$89.95 · 1 个额度
Painting and Decorating15$89.95 · 1 个额度
Roof Work14$89.95 · 1 个额度
Glazing15$89.95 · 1 个额度
Mobile Plant Working Near-Around8$89.95 · 1 个额度
Retaining Wall19$89.95 · 1 个额度
Roof Edge Protection16$89.95 · 1 个额度
Garage Door Installation14$89.95 · 1 个额度
Insulation - Batts Installation12$89.95 · 1 个额度
Erecting Fixed Scaffold14$89.95 · 1 个额度
Plumbing Drainage18$89.95 · 1 个额度
Final Building Clean Before Handover to Client10$89.95 · 1 个额度
Rough-in Final Fit-out Plumbing18$89.95 · 1 个额度
Timber Floor Laying13$89.95 · 1 个额度
Skip Bin11$89.95 · 1 个额度
Concrete Boom or Line Pumping15$89.95 · 1 个额度
Traffic Corridor - Establishing a Safe Work Zone8$89.95 · 1 个额度
Construction Labourer16$89.95 · 1 个额度
Temporary Fencing11$89.95 · 1 个额度
Plasterboard16$89.95 · 1 个额度
Decking19$89.95 · 1 个额度
Brick and Block Laying22$89.95 · 1 个额度
Concrete Foundations Excavating - Pouring17$89.95 · 1 个额度
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 个额度
Fencing16$89.95 · 1 个额度
Duct Work Installation11$89.95 · 1 个额度
Working in Roof Spaces8$89.95 · 1 个额度
Construction Site Visitor7$89.95 · 1 个额度
Overhead Electric Lines - Working Near6$89.95 · 1 个额度
Construction OHS/WHS Project Management Plan0$89.95 · 1 个额度
Earthmoving Equipment23$89.95 · 1 个额度
Timber Floor Sanding and Finishing14$89.95 · 1 个额度
Cladding12$89.95 · 1 个额度
Cabinet Installation12$89.95 · 1 个额度
Air Conditioning Installation16$89.95 · 1 个额度
Dogman12$89.95 · 1 个额度
Rendering14$89.95 · 1 个额度
Electrical New Installation20$89.95 · 1 个额度
Powered Non-powered Tools12$89.95 · 1 个额度
Plumbing Gas Fitting21$89.95 · 1 个额度
Manual Handling18$89.95 · 1 个额度
Carpet Laying14$89.95 · 1 个额度
Tiling14$89.95 · 1 个额度
Awnings Blinds Curtains Installation14$89.95 · 1 个额度
Excavation Near Assets13$89.95 · 1 个额度
Plumbing - Water Meter Installation16$89.95 · 1 个额度
Concrete Slab on Ground17$89.95 · 1 个额度
Waterproofing12$89.95 · 1 个额度
Floating Floor Laying14$89.95 · 1 个额度
Aluminium Window Door Frame Installation15$89.95 · 1 个额度
Framing and Trusses - Timber-Steel15$89.95 · 1 个额度
Site Establishment11$89.95 · 1 个额度
Port-a-loo Service8$89.95 · 1 个额度
逐个购买$4,857.30 · 54 个额度
在本套装中$2,518.60 · 28 个额度 节省 $2,338.70

评价

暂无评价。

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。