抢先体验优惠:抢先体验: 30% 折扣,只要保持订阅就一直有效.

领取优惠

模板文件为英文。

Lock Out Tag Out (LOTO)

SWMS · SWMS-10166

Lock Out Tag Out (LOTO) SWMS模板预览
  • 12 个工作步骤
  • 已售出 210 次
  • 版本 7
  • Earthmoving & Mobile Plant
  • 任何手机都能看

This Lock Out Tag Out (LOTO) Safe Work Method Statement (SWMS) covers the hazards and controls involved with the lock out/tag out of plant and equipment. It applies to all items of plant and equipment that are acquired (purchased, hired, leased, loaned or donated), installed, used, operated, stored or maintained on-site.

It covers 12 job steps, from writing isolation procedures, training and confined spaces to pre-start checks, electrical isolation, locking out and tagging plant, restoring equipment to service, completion and emergency response.

It includes controls for high-risk construction work around mobile plant, gas mains, hazardous lines, energised electrical installations and hazardous atmospheres.

It suits safety managers, construction workers, maintenance teams and plant operators, particularly where lockout and tagout procedures are required.

Lock Out Tag Out (LOTO) SWMS 预览

Lock Out Tag Out (LOTO)

SWMSVersion 7
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous Lineschemical, fuel or refrigerant lines
  • Energised Electricalenergised electrical installations or services
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/Review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Eye Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Develop written procedures (SOP) for isolation of specific plant

    • Hazard

      Potential outcomes for personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • Terminology:

        • Lockout - A device is placed on, around, or through an energy-isolating device to lock it in a safe position

        • Tag out- The process by which an energy-isolating device for an item of plant/equipment is placed in the off position, and a written warning tag is attached. A tag out should be used only when the energy-isolating device is not capable of being locked out, e.g. A small item or power tool

        • Lockout-Tag out (LOTO) - A device is placed on, around, or through an energy-isolating device to lock it in a safe position and a written warning tag is attached. Locks and Tags must be substantial enough to prevent casual or accidental removal. Locks and tags must also identify the worker applying and using the device.

      • LOCKOUT / TAGOUT PROCEDURE

      • Required isolation points (use manufacturer’s diagram - if not available, create a diagram and show all isolation points clearly). Ensure all energy sources isolated:

        • Electrical

        • Fuel

        • Heat / Steam

        • Fluids under pressure

        • Stored energy

        • Radiation

      • Identify Types of Locking devices

      • Identify Types of Tags

      • Identify the person responsible (including placement of Personal Danger Tags, Out of Service Tags, and authorised removal of another’s tags). Identify:

        • Plant that requires electrical isolation that must be undertaken by qualified people (electrician) – such as those that are not plug/socket types

        • Any plant used to control hazards (such as mechanical ventilation, HVAC systems)

        • Any plant that may give rise to other hazards (falls, burns, asphyxiation, impact, gases.)

        • Restricted modes for the plant during maintenance.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 11 个工作步骤,从“Training”到“Emergency response”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个模板

免费注册,然后选择获取方式。你的公司信息会自动填好。

  • 付费套餐包含

    使用套餐中的模板额度。这一份需要 1 个额度。

    比较套餐和价格
  • 单独购买

    $89.95 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

涵盖内容

12 个工作步骤

  1. Develop written procedures (SOP) for isolation of specific plantWrite isolation procedures for each item of plant
  2. TrainingTrain workers and make sure everyone follows the LOTO procedure
  3. Confined spacesGet a confined space entry permit before anyone enters
  4. Arrival on-site & assess onsite conditionsCheck the site and its conditions on arrival
  5. Pre-startComplete the isolation permit and check locks and tags
  6. House keepingKeep the work area clean and clear
  7. Manual tasksLift and move materials safely
  8. Isolate electrical supplyIsolate the electrical supply and prove it de-energised
  9. Lock Out/Tag Out of plantIsolate, lock and tag the plant and prove zero energy
  10. Restoring equipment to serviceReturn plant to service and deal with locks left on
  11. On completionClear the area, secure access points and sign out
  12. Emergency responseRespond to emergencies and give first aid

涵盖的危险

评价

  • Thorough, correct, east-to-use, great legislative reference attachments and easy to re-badge.

    Chris Hopper已验证购买

查看全部

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。